Completion of Metallurgical Diamond Drilling at Earaheedy
Released
Released
Announcement PDF
9 January 2024
Metallurgical Diamond Drilling Completed Successfully
•
10 PQ3 diamond holes have been completed at Earaheedy, providing
over two tonnes of mineralised drill core for beneficiation test programs
Rumble Resources Ltd
•
Drillhole locations were designed to provide representative intervals of
Zn-Pb mineralisation along and across the strike of the Chinook Deposit
•
Test work will also deliver further geo-metallurgical information to be
applied in upcoming scoping studies
Level 1, 16 Ord Street,
West Perth, WA 6005
•
Drill core has been logged and photographed and the selected intervals
have now arrived in Perth for assay analysis and metallurgical testing
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to announce that
a diamond drilling campaign to supply metallurgical samples has been completed within the
emerging world class Earaheedy Zn-Pb-Ag Project (“Earaheedy” or the “Project” – see
Figures 1 and 2), located 110km northeast of Wiluna in Western Australia.
The diamond drilling campaign was focused on Chinook, the largest of the pit constrained
inferred sulphide resource areas, where a Mineral Resource Estimate (MRE) of 63Mt @ 3.0%
Zn+Pb and 4.6g/t Ag (at a 2% Zn+Pb cutoff) – refer to ASX release 19th April 2023, was
outlined within optimised pit shells.
10 PQ3 diamond holes for 1462.7m were completed within E69/3464 (75%RTR/25%ZNC)
and E69/3787 (100% RTR), and yielded an estimated 2300kg of representative metallurgical
core sample for:
•
pilot beneficiation trials (incl. dense media separation [DMS] and sensor ore sorting)
that will assess the potential to upgrade the significant volumes of lower grade Zn-Pb
mineralisation highlighted within the pit constrained MRE.
•
comminution test work, and
•
further detailed mineralogy and flotation optimisation testing, for future planned
scoping level studies
Beneficiation Background
DMS is a preconcentration method used for the early waste rejection from ores at coarse
particle sizes prior to additional milling and downstream processing.
It has been practiced in the mining industry for many years and could provide increased
optionality for a developing project like Earaheedy. This low cost and efficient processing
technique has been shown to be highly effective in modified Mississippi Valley Type (MVT)
environments (refer to ASX release 23 November 2023. Slide 13) like Earaheedy (eg. Pering
Zn-Pb mine, South Africa)
The advantages of such preconcentration technologies include:
•
An increase in the potential mining inventory due to a lowering of the cutoff grade.
Thus, lower grade material can be upgraded prior to milling, flotation and filtration.
Earaheedy has a large volume of lower grade mineralisation surrounding the reported
MRE of 94Mt @ 3.1% Zn+Pb (at a 2% Zn+Pb cutoff) refer to ASX release 19th April
2023, which occurs within the already optimised pits outlined. Successfully upgrading
this material could potentially lead to a much longer mine life.
•
A potential reduction in capital and operating costs as a result of enhanced feed
grades, thus fewer tonnes are required to be processed and costs of energy, water
and reagents are decreased, whilst the size of the process plant is reduced.
•
Removal of potentially high silicate waste early in the process, which is beneficial (ie.
leads to reductions in grind energy consumption as well as providing low sulphur
aggregates and by-products).
•
Flotation and metal recoveries typically increasing with increasing metal feed grades.
1
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Venn
Interim Managing Director
Mr Matthew Banks
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Company Secretary
Next Steps
The 10 diamond holes have been geologically and geotechnically logged and photographed. A geologically domained
quarter core sample was sent to ALS for laboratory analysis. The remaining three quarters of mineralised core was
delivered to the Auralia Metallurgy laboratory in Perth, ready to commence beneficiation testing and further flowsheet
optimisation. The program is due to commence in the March quarter with results to be reported in the first half of 2024.
Figure 1 – Chinook - Diamond Drill Hole Locations
Figure 2. EHD043: interval 77.6m-82.4m: Navajoh Unconformity Unit host and coarse-grained sphalerite, galena and pyrite mineralisation
2
About the Earaheedy Project
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna in Western Australia,
with access to major highways, power (gas pipeline), rail, ports, airports, and experienced mining workforce (see
Figure 3). The Project includes tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals
Ltd (ASX: ZNC) 25% Joint Venture (“JV”), E69/3787, E69/3862, E69/4124, and exploration licence applications
E69/4149, E69/4165 and E69/4178, which are all 100% controlled by Rumble (see Figure 4).
In addition to the above tenements, Rumble is acquiring (100% RTR) four granted exploration licences that lie north
and northwest of the existing tenure – refer to ASX release 24th October 2023. These tenements comprise of E69/3815,
E69/3842, E69/3889 and E52/3879 (see Figure 4). The addition of the latest tenure will increase the Earaheedy Project
landholding to over 1760km² in area.
Rumble announced a major discovery on 19th April 2021, and 2 years later announced a globally significant, pit
constrained, maiden inferred Mineral Resource Estimate (MRE) of 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2%
Zn+Pb cutoff) – refer to ASX release 19th April 2023. This maiden MRE confirmed the Earaheedy Project as one of
the largest global zinc sulphide discoveries in the last decade. The strength of the MRE is supported by 41Mt of highergrade resources that could be part of a possible early development scenario, and a much larger 462Mt resource that
could potentially be upgraded via beneficiation, providing the Project with significant future flexibility.
The Project has exceptional near-term growth potential, with the deposits open in all directions and with the recent
tenement additions, the strike potential has significantly increased to over 70km. Drilling by Rumble has focused on
the Navajoh Unconformity Unit (host to the current resources) with the aim to find large shallow flat lying sulphide
deposits amenable to large scale open cut mining, whilst none of the thick underlying geologically fertile formations
which could potentially host high-grade MVT deposits have yet been tested.
The sheer scale, optionality, location and extraordinary growth potential of Earaheedy could see the Project stamp
itself as a world class, multi decade asset and play a key role in the future global renewable energy transition.
Figure 3: The Earaheedy Zn-Pb-Ag Project location and existing infrastructure within Western Australia
3
Figure 4: Earaheedy Project – Regional Geology – Earaheedy Basin with Tenement Status
Authorisation
This announcement is authorised for release by Peter Venn, Interim Managing Director of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Previous Drill Results
Drill hole results are ongoing and previous assays have been reported in earlier ASX announcements.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
ASX Release 23/1/2020 – Large Scale Zn-Pb-Ag Discoveries at Earaheedy
ASX Release 19/4/2021 – Major Zinc-Lead Discovery at Earaheedy Project, Western Australia
ASX Release 2/6/2021 – Large Scale Zinc-Lead-Silver SEDEX Style System Emerging at Earaheedy
ASX Release 8/7/2021 – Broad Spaced Scout Drilling Has Significantly Increased the Zn-Pb-Ag-Mn footprint at
Earaheedy
ASX Release 23/8/2021 – Earaheedy Zn-Pb-Ag-Mn Project – Exploration Update
ASX Release 13/12/2021 - New Zinc-Lead-Silver Discovery at Earaheedy Project
ASX Release 21/12/2021 – Major Zinc-Lead-Silver-Copper Feeder Fault Intersected
ASX Release 20/1/2022 – Two Key Tenements Granted at Earaheedy Zn-Pb-Ag-Cu Project
ASX Release 31/1/2022 – Shallow High-Grade Zn-Pb Sulphides Intersected at Earaheedy
ASX Release 21/2/2022 – Further High-Grade Zn-Pb Results and Strong Grade Continuity
ASX Release 9/3/2022 – Major Expansion of Zn - Pb Mineralised Footprint at Earaheedy
ASX Release 26/5/2022 - Multiple New High-Grade Zn-Pb Zones defined at Earaheedy
ASX Release 18/7/2022 – Heritage Clearance Confirmed- Sweetwater drilling Commenced
ASX Release 23/08/2022 – Significant Zones of Zn-Pb Sulphides Intersected
ASX Release 30/08/2022 – High grade Zn-Pb drill intercepts at Tonka
ASX Release 29/09/2022 – New 2.2km High Grade Chikamin Feeder Zone extends Chinook
ASX Release 3/11/2022 – High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
ASX Release 17/11/2022 – Exceptional Metallurgical Results at Earaheedy Project
ASX Release 16/02/2023 – Multiple New High-Grade Feeder Targets Defined
ASX Release 14/03/2023 – Chinook Zn-Pb Prospect expands to 8km strike
ASX Release 19/04/2023 – Maiden Resource Confirms Earaheedy's World Class Potential
4
•
•
•
•
•
•
•
ASX Release 03/05/2023 – Heritage Clearance received for Navajoh Southeast Trend
ASX Release 01/06/2023 – High impact drilling commences at the Earaheedy Project
ASX Release 17/07/2023 – New Zn-Pb mineralisation discovered in Sweetwater drilling
ASX Release 05/10/2023 – High-grade Zinc-Lead intersection at the Mato Prospect
ASX Release 24/10/2023 - Acquisition Increase Further Zn – Pb Potential
ASX Release 31/10/2023 – Mato Discovery confirmed with further high grade Zn-Pb
ASX Release 14/11/2023 – Diamond drilling commences at Earaheedy Project
About Rumble Resources Ltd
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing the major
Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced drilling has rapidly
uncovered an emerging world class scale base metal system, with interpretative geology and drilling continuing to make new discoveries
and highlight multiple large-scale deposit targets. In April 2023, Rumble announced a maiden, pit constrained, Mineral Resource Estimate
of 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) at Earaheedy.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1 regions of
Western Australia.
Rumble’s board and management team has a successful track record in making discoveries and project development.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly represents information
compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is an employee of
Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX market
announcements released on the date noted in the body of the text where that reference appears. The previous market announcements
are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcements. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production
levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth or other trend projections.
Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which
are beyond the control of Rumble Resources Ltd. Actual results and developments may differ materially from those expressed or implied
by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in
accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of
Geoscientists.
Table 1 – Chinook Diamond Drillhole Collar information –
Hole ID
E (GDA94 Z51)
N (GDA94 Z51)
EHD035
251776.82
7166209.59
EHD036
251027.16
7166114.74
EHD038
249489.63
7167450.26
213.5
EHD039
251858.43
7165947.1
EHD040
251048
7166553
EHD041
253921
7165767
EHD042
251387
7166323
EHD043
253060
7165553
EHD044
252916
7165704
EHD045
250769
7166853
170.1
5
Depth (m)
Dip
Azi
Area
180
-80
210
Chinook
104.6
-80
210
Chinook
-83
210
Chinook
101
-80
210
Chinook
149.4
-80
240
Chinook
138.3
-85
223
Chinook
167.1
-80
310
Chinook
125
-80
210
Chinook
113.7
-80
315
Chinook
-84
195
Chinook
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
•
•
•
•
•
•
pXRF analysis (Vanta Olympus
XRF Analyser) taken half metre. If
pXRF response is >1000ppm Zn +
Pb, then sample taken for wet
analysis
Weight of sample was on average
>2kg.
Diamond core drilling involved
PQ3 coring using 3m barrel. The
PQ core is cut in half (along long
axis) and then one half cut into
quarter core.
One quarter of the PQ3 is sampled
to geological domain boundaries
and/or pXRF assay data and sent
to ALS for laboratory analysis.
Laboratory assay analytical
methodology and results pending
Both the remaining quarter core
and half core was brought to Perth
and delivered to Auralia
Metallurgy laboratory to
commence testwork.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.).
•
Diamond core drilling is completed with
PQ3. Core is oriented if ground
conditions allow
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
•
Diamond core is cut subject to
recovery runs and
lithological/mineralisation boundaries
•
The core is marked up for recovery,
orientated and geologically logged.
pXRF analysis is also completed for
later interpretation and reference.
•
•
Diamond Core drilling:
Sub-sampling techniques are subject
to core recovery. Core cut by diamond
saw and sent as quarter core to
laboratory for ;laboratory analysis
Standards are routinely used with
blanks. If recoveries allow, duplicates
taken every 20m. In the case of
duplicates, the primary sample is
quarter core and the duplicate is
quarter core.
Logging
Subsampling
techniques
and sample
preparation
6
•
Criteria
JORC Code explanation
Commentary
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
•
Assay sampling methodology and
results pending
•
Assay sampling methodology and
results pending
•
All drill hole collar positions
surveyed by hand-held GPS.
•
•
Subject to results.
Assay sampling methodology and
results pending
•
Previous drilling (and historic) has
defined a consistent flat lying
sedimentary package.
Diamond core drilling was angled at 80° and at variable azimuths.
Mineralised horizon intersections are
expected to be close to true width of
the orebody.
•
• The measures taken to ensure sample security.
•
All sampling packaging and security
completed by Rumble personnel, from
collection of sample to delivery at
laboratory.
• The results of any audits or reviews of sampling
techniques and data.
•
No audits completed.
7
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral
tenement and
land
tenure
status
Commentary
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
Geology
• Deposit type, geological setting and style of
mineralisation.
Drill
hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths
and
intercept
lengths
•
•
•
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
8
•
The Earaheedy Project comprises of
E69/3464 (75% Rumble and 25%
Zenith Minerals – JV), E69/3787 and
E69/3862 (100% Rumble) and newly
acquired tenure E69/4124, E69/4165
and E69/4149 (all 100% Rumble)
•
All Tenements are in a state of good
standing and have no known
impediments to operate in the area.
•
•
Exploration solely completed by
Rumble Resources
The Earaheedy Project Deposit type is
considered to be a MVT variant (Irish
Style in part). Mineralisation is
predominantly stratiform sediment
unconformity hosted in both carbonate
and clastic flat lying lithologies.
Table 1 – Chinook Diamond Drillhole
Collar information
•
No Assaying Reported
•
Subject to final geological logging
and laboratory assay verification
Criteria
JORC Code explanation
Commentary
statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
•
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
•
Figure 1 – Chinook - Diamond
Drill Hole Locations
•
Figure 2. EHD043: interval 77.6m82.4m: Navajoh Unconformity Unit
host and coarse-grained
sphalerite, galena and pyrite
mineralisation
•
Figure 3: The Earaheedy Zn-PbAg Project location and existing
infrastructure within Western
Australia
•
Figure 4: Earaheedy Project –
Regional Geology – Earaheedy
Basin with Tenement Status
•
Balanced
reporting
•
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
Not applicable as no grades being
reported.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•
Airborne Gravity Gradiometry
Survey (Falcon) completed by
Xcalibur Multiphysics
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
Further work
•
•
9
•
•
Area over 400km2
Flight lines – 250m
RC scoping and targeted drilling
at the Mato Prospect
RC Drilling along the Navajoh
Southeast Trend
Aircore Drilling – Iroquois
Carbonate Member
Share your feedback