High Grade Gold Intercept Extends Western Queen Central
Released
Released
Announcement PDF
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 1
ASX ANNOUNCEMENT
28 April 2026
Diamond drilling further extends high-grade shoot at
Western Queen Central
Drilling at Western Queen Central returns excellent intercept of 9.45m @ 11.16 g/t gold
• Infill diamond drilling at Western Queen Central has successfully extended a previously delineated
high-grade shoot. The intercept confirms mineralisation continues down-plunge from historical
underground workings, including 9.45m @ 11.16 g/t Au from 331.55m in hole WQDD063
• This result further validates a series of standout high-grade intercepts from the ongoing diamond
program, including:
o 5.8m @ 30.72g/t Au from 315m (WQDD052)1
o 6.3m @ 24.88g/t Au from 305m (WQDD057)2
o 6.9m @ 24.81g/t Au from 290m (WQDD059)3
• These results will be integrated into the upcoming Mineral Resource Estimate update, which is on
schedule for delivery mid-year
Peter Harold, Managing Director and CEO commented:
“Great to see more high-grade intersections at Western Queen Central which should lead to a substantial
upgrade of the resources at Central. Importantly, the more Indicated resources we can report the more
potential there is to convert this into a Mining Inventory at Central.
The Feasibility Study is well underway and on track to be delivered mid-year along with the updated Mineral
Resource Estimate. We are expecting now to incorporate material from both Western Queen South and
Central which should result in a much larger mining inventory than the production target outlined in the
November 2025 Scoping Study.”
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to provide an update on the
diamond drilling program that commenced in October 2025 to grow and upgrade the mineral resources outlined
at the Western Queen Gold and Tungsten Project (“Western Queen” or the “Project”). The drilling program
finished in mid-April 2026 with a total of 17,225m drilled.
Western Queen is located in Western Australia, approximately 40 km northwest of Ramelius’s Dalgaranga Gold
Project and 90km northwest of Mt Magnet. Western Queen contains resources of 370,000oz Au at 3.1g/t Au4
and
13.2kt of WO3 at 0.31% WO3.5
1
Refer Company ASX Release dated 12 February 2026
2
Refer Company ASX Release dated 14 January 2026
3
Refer Company ASX Release dated 14 March 2026
4
Refer Company ASX Release dated 23 July 2025
5
Refer Company ASX Release dated 11 August 2025
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 2
Western Queen Central – Gold mineralisation
Following the recently reported high-grade intercepts of 5.8m @ 30.72g/t Au from 314.6m (WQDD052), 6.3m @ 24.88
g/t Au from 305m (WQDD057) and 6.9m @ 24.81 g/t Au from 290.1m (WQDD059) further drilling results have been
received for two holes including a fourth high-grade intercept of:
• 9.45m @ 11.16 g/t Au from 331.55m (WQDD063)
Hole WQDD063 was drilled as a 40m down-plunge step-out from WQDD052, successfully extending high-grade
mineralisation (>50 gram x metres Au) to a depth of more than 200m below the historical Western Queen Central
underground workings. This result suggests the potential for alternative lode orientations, which are currently being
assessed as part of the ongoing litho-structural interpretation and modelling (see Figure 1).
Further down plunge WQDD062 encountered the mineralised position but did not return a significant intercept.
Figure 1 – Western Queen Central and Princess gram x metre contours with selected drill hole intersections - longitudinal section
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 3
Next Steps for Western Queen
Gold
• Assay Results - Final infill and extension diamond drilling results from drilling at Western Queen
South are expected in May.
• Metallurgical testwork - Six diamond holes from the current infill program were selected to provide
samples for the metallurgical testwork program to validate the previous high metallurgical recoveries
from Western Queen South. That program has now been completed and will be reported in early
May.
• Resources update - Report an updated gold Mineral Resource Estimate mid-year.
• Feasibility Study - Complete the Feasibility Study. On track for mid-year.
Tungsten
• Final assays - Expected in May.
• Resources update - Report an updated tungsten Mineral Resource Estimate mid-year.
• Scoping Study - Complete a mine plan and Scoping Study on the WO3 material from Western Queen
which could potentially be mined concurrently with the gold.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 4
About Western Queen
The Western Queen Gold and Tungsten Project (“Western Queen” or the “Project”) is 90km NW of Mt Magnet within the
Yalgoo mineral field of Western Australia. The Project comprises of two contiguous mining leases (M59/45 and M59/208)
for a total area of 9.8 km². In addition to the mining leases, it includes L59/40 (Miscellaneous License) which covers a portion
of the original haul road between Western Queen and Dalgaranga.
The Dalgaranga Plant processed the historical ore reserves from the Western Queen Central Deposit. The original haul road
is still open and is the main access into the project. Rumble holds 100% equity in the project. Surrounding Western Queen
is the Wardawarra Project (100% Rumble). The Wardawarra Project consists of a single granted exploration license (E20/967)
and two exploration licence applications (E59/2816 and E59/3012).
Western Queen is strategically located within 200km of five gold processing plants (see Figure 2).
Figure 2 - Location Plan of the Western Queen Gold Project
The two deposits mined at Western Queen had a combined historical production of 880,000t @ 7.6 g/t Au for 215,000oz.
The Western Queen Central Mine produced 660,000t @ 8.9 g/t Au for 189,500oz and the Western Queen South Mine (from
two stages) produced 220,000t @ 3.6 g/t Au for 25,500oz.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 5
Gold
In July 2025, Rumble announced an updated Mineral Resource Estimate (Indicated and Inferred) of 3.72Mt @ 3.1 g/t Au for
370,000 oz.
Within both the Western Queen Project area and the surrounding Wardawarra Project there is high potential to add
significantly to the current resource. Gold mineralisation is associated with a structural jog zone within a major orogenic
shear which trends north-south along the Wardawarra Greenstone Belt (see Figure 4).
The structural jog cuts across amphibolite (after basalt and dolerite) and ultramafic lithologies. At the Western Queen Central
deposit, a very high-grade gold skarn has developed within the ultramafic rocks, with an average grade of 8.9g/t Au recorded
in historical production.
At the Western Queen South deposit, high-grade gold occurs within potassic altered quartz-sulphide lodes that have
developed in fine to medium grain amphibolite and plunges moderately to the south.
Tungsten
High-grade tungsten (scheelite) mineralisation was first discovered within the Western Queen South Deposit in August 2024,
with drill hole WQDD013 returning 4m @ 4.58% WO3 and 0.72 g/t Au from 174.85m. Twelve months later, Rumble
announced a maiden tungsten Mineral Resource Estimate of 4.31Mt @ 0.31% WO3 for 13.2kt WO3. The tungsten
mineralisation occurs within a prograde skarn stage that lies closely adjacent to the gold mineralisation. Tungsten
mineralisation at Western Queen remains open in all directions.
Figure 3 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 6
Authorisation
This announcement is authorised for release by the Board of the Company.
-Ends-
For further information visit rumbleresources.com.au or contact info@rumbleresources.com.au
Peter Harold
Managing Director & CEO
Rumble Resources Limited
Peter Venn
Technical Director
Rumble Resources Limited
Trevor Hart
Chief Financial Officer
Rumble Resources Limited
About Rumble
Rumble Resources is an Australian based exploration company, listed on the ASX in July 2011. Rumble was established with
the aim of adding significant value to its selected mineral exploration assets and to search for suitable mineral acquisition
opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold-Tungsten Project which is being
developed to deliver near term cash flow from the existing underground resources and resource growth through future
exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the capabilities of the
exploration team to find world class orebodies.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly represents
information compiled by Mr Simon Davies, who is a Member of the Australian Institute of Geoscientists. Mr Davies is an
employee of Rumble Resources Limited. Mr Davies has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Davies consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s
ASX market announcements released on the date noted in the body of the text where that reference appears. The
previous market announcements are available to view on the Company's website or on the ASX website (www.
asx.com.au). The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and
resources, production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd,
industry growth or other trend projections. Such statements are not a guarantee of future performance and involve
unknown risks and uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual
results and developments may differ materially from those expressed or implied by these forward-looking statements
depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of
an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless
otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this
document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute
of Mining, and Metallurgy and Australian Institute of Geoscientists.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 7
Table 1 - Drill Hole Location, Survey, and Gold Assay Results
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 8
Previous ASX Announcements – Western Queen Gold Project
• 6/8/2019 – Option to Acquire High-Grade Western Queen Gold Project
• 4/11/2019 – Western Queen Gold Project – Multiple Targets to be Drilled
• 22/11/2019 – Drilling Commenced at Western Queen Gold Project
• 17/2/2020 – High Grade Gold Discovery at the Western Queen Project
• 25/2/2020 – Drilling Commenced at the Western Queen Gold Project
• 14/4/2020 – Exploration Update – Three Drill Programs Completed
• 20/5/2020 – Drilling Identifies Multiple High-Grade Gold Shoots
• 9/6/2020 – Major Drill Program to Commence – Western Queen Gold Project
• 24/6/2020 – Major Drill Program Commenced at The Western Queen Gold Project
• 16/7/2020 – 500% Increase in Landholding Extends Western Queen Project
• 31/8/2020 – Option Exercised to Acquire the Western Queen Gold Project
• 10/9/2020 – 100% Acquisition of Western Queen Gold Project Complete
• 4/11/2020 – Discovery High-Grade Gold Shoots and Shear Zone Extension
• 3/2/2021 – High-Grade Gold Shoots at Western Queen South Deposit
• 2/8/2021 – Western Queen Resource Upgrade to 163,000oz
• 29/4/2024 – Drilling to test High-Grade Gold Zones at Western Queen
• 29/5/2024 – Western Queen Drilling Commenced
• 16/7/2024 – Western Queen Drilling Update
• 6/8/2024 – High-Grade Tungsten Discovery at Western Queen
• 2/9/2024 – Tungsten Discovery at Western Queen Confirmed
• 27/09/2024 - Rumble welcomes new Strategic Investor
• 15/10/2024 – Western Queen Gold Resources increased 76% to 287koz
• 20/11/2024 – Commencement of Drilling at Western Queen
• 28/11/2024 – Development of Western Queen Gold Project
• 11/12/2024 – High-Grade Tungsten Assays Highlights Resource Potential at WQ
• 17/2/2025 – High-grade Gold and Tungsten Assays from Phase 1 Drilling
• 28/2/2025 – Development of Western Queen Gold Project.
• 4/2/2025 – High Grade Tungsten from Historical Core
• 16/4/2025 – Western Queen - Mine Development and Exploration Update
• 30/5/2025 – Western Queen Gold Mine Development
• 4/6/2025 – High-grade Gold and Tungsten at Western Queen Project
• 23/7/2025 – Significant Increase to Western Queen Gold Resources.
• 4/8/2025 – High-Grade Tungsten Assays at Western Queen.
• 11/8/2025 – Maiden Tungsten Resource at Western Queen Project
• 01/10/2025 – Western Queen Exploration and Development Update
• 22/10/2025 - Western Queen Drilling and Development Update
• 27/11/2025 - Western Queen South Scoping Study Highlights Robust Underground Mining Project
• 22/12/2025 - Western Queen Drilling & Mine Development Update
• 14/01/2026 - Multiple high-grade gold intercepts at Western Queen including 30.72g/t Au over 5.8 metres
• 12/02/2026 - High-grade gold intercept extends Western Queen South mineralisation to over 500m down plunge
• 12/03/2026 - Western Queen continues to deliver high-grade gold and tungsten intercepts including 24.81g/t Au over 6.9m
• 25/03/2026 - Excellent Metallurgical Results for Western Queen Gold and Tungsten Project
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 9
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases, more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Diamond Core Sampling - Sampled to
visible mineralisation or lithological
boundaries. Otherwise to 1m intervals.
• Diamond core sampling is ½ core or ¼
core when sample is required for
metallurgical test work for NQ2 and ¼
core for HQ3.
• Standards, blanks and duplicates inserted
at a rate of 8%. 4% Standards, 2% Blanks,
2% duplicates. Additional standards,
blanks and duplicates inserted where
required.
• pXRF readings taken with a Vanta M series
device every metre on clean
representative core. 2 beams with 10
second run times each.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc.).
• Diamond Rigs are Sandvik DE880s.
• Collars are drilled with mud rotary to
refusal. HQ3 then NQ2 core is drilled.
• Core is oriented using a downhole AXIS ori
tool.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Diamond core sample collected in trays,
orientated, logged, pXRF, and
photographed on site. Core was cut and
sampled by Rumble staff onsite.
• 100% core recovery was obtained.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
• The total length and percentage of the relevant intersections
logged.
• Diamond core is geologically, structurally
and geotechnically logged with full
orientation and photography. Core
recovery is calculated based on 1m
intervals. Entire diamond core logged
including mineralisation and country rock.
• pXRF data will be used to refine logging of
units, particularly using the Ti/Zr ratio.
• Core photographed post marking up dry
and wet.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
• size of the material being sampled.
• Diamond core was orientated and marked
based on 1 metre or geological
boundaries. The core was cut 30 degrees
off the orientation mark line (retaining in
tray the orientation mark).
• For duplicates (approximately every 20
samples), sample is split at the crushing
stage at ALS Laboratories. At all times, half
or quarter core was retained for future
reference.
Quality of
assay data
and
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
• Sample preparation by crushing, splitting
to 3kg sample if required, and pulverising
of up to 3kg.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 10
Criteria JORC Code explanation Commentary
laboratory
tests
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
• Each metre of core was analysed by Vanta
M Series pXRF, with 2 10 second beams.
• Blanks and standards analysed at the
beginning of each usage of pXRF.
• For Gold (Au) assaying was completed by
50g charge Fire Assay with AA finish (total
digest).
• Certified Gold standards were industry
CRMs from OREAS and Geostats which
included low-grade and high-grade along
with blanks.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Verification of significant intersections by
Rumble personnel.
• No twinned holes completed.
• All data and documentation are
electronic, backed up to company
SharePoint or Dropbox.
• Logging using digital software package.
pXRF, survey and other data entered using
excel.
• Complete hole data and assay results sent
to company database administrator to
load into online hosted database.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Diamond drill-hole collars have been
surveyed using handheld GPS. DGPSsurvey
completed at end of program.
• Rumble has flown a high-resolution DEM
to ascertain topographic control for
collars where the natural surface still
exists.
• Down-hole surveys were completed by
Gyro every 20 to 30 m.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Data spacing is based on surface DGPS
drill hole pick-up including RL, and
historical survey data.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
• Structural orientation of mineralisation is
well known. Most historical drilling is
appropriately angled for this orientation.
• Drilling orientation is not considered to
have introduced a sampling bias.
Sample
security
• The measures taken to ensure sample security. • All samples are managed and transported
by Rumble personnel from mining lease to
laboratory.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• No audits completed.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 11
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known
impediments to obtaining a licence to
operate in the area.
• The Western Queen Project comprises two mining licences
(M59/45 and M59/208), one exploration license E20/967
and two exploration licence applications (ELA59/2816 and
ELA59/3021).
• Rumble owns 100% of the project.
• The mining licenses and exploration licence E20/967 are
granted, in a state of good standing and have no known
impediments. Exploration licences ELA59/2816 and
ELA59/3021 are under application.
• Production royalties for gold include $20/oz on existing
resources with $8/oz on new open pit resources and $6/oz
on new underground resources.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• RC and Diamond core drilling completed by Rumble 2020-
2025.
• Previous drilling and surface sampling work by numerous
other parties conducted 1980s to 2010s.
• Small scale mining conducted 1900s to 1930s.
• Modern mining conducted 1999-2012 by multiple parties.
Geology
• Deposit type, geological setting and style of
mineralisation.
• Deposit type is scheelite pyroxene endoskarn considered to
be an early event which has been overprinted by an
orogenic shear hosted gold system in Archaean greenstones
of the Yilgarn Craton.
• The mineralised system at the Western Queen is hosted in
sheared amphibolite. It is associated with sulphidic quartz
veins and has an overall steep WNW dip. The mineralised
zone is strongly recrystallised and massive.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should clearly
explain why this is the case.
• Table 1 - Drill Hole Location, Survey, and Gold Assay Results
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high-grade results and longer
lengths of low-grade results, the procedure
• Weighted averaging (by length) of results completed for all
results.
• Gold Results – Intervals calculated using a 0.5g/t minimum
grade cutoff and up to 2m of contiguous internal waste.
Intervals with at least 5 gram metres (g/t Au x interval
width) were reported.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 12
Criteria JORC Code explanation Commentary
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• No maximum cutoffs were used.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important
in the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
• The dip of the gold mineralisation zone is inferred
approximately 70° to the west.
• Geological interpretation of assay results indicates they are
close to true width.
Diagrams
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to, a plan view of drill hole collar
locations and appropriate sectional views.
• Figure 1 – Western Queen Central and Princess gram x
metre contours with selected drill hole intersections -
longitudinal section
• Figure 2 - Location Plan of the Western Queen Gold Project
• Figure 3 - Western Queen Shear Zone Prospectivity over TMI
Airborne Magnetics
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Table 1 - Drill Hole Location, Survey, and Gold Assay Results
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• All diamond samples col