Mato discovery continues to grow with new highgrade Zn-Pb sulphide mineralisation intersected
•
•
•
Further significant high-grade Zn-Pb sulphide mineralisation
intersected along strike of the exciting new Mato Prospect discovery
at Earaheedy.
The latest drilling highlights a potential 3km x 3km area of high-grade
Zn-Pb mineralisation at Mato, which is highly prospective, up dip to
the southwest and along strike, and likely to lead to additional
resource growth at Earaheedy.
Most recent assays include:
•
12m @ 6.07% Zn + Pb from 146m (EHRC776)
including 8m @ 8.71% Zn + Pb from 148m
•
19m @ 4.23% Zn + Pb from 119m (EHRC778)
including 12m @ 5.28% Zn + Pb from 119m
•
13m @ 3.31% Zn + Pb from 145m (EHRC783)
including 6m @ 6.95% Zn + Pb from 145m
•
12m @ 3.04% Zn + Pb from 122m (EHRC788)
including 7m @ 4.40% Zn + Pb from 124m
•
8m @ 2.91% Zn + Pb from 158m (EHRC777)
including 3m @ 6.65% Zn + Pb from 158m
•
The latest assay results compliment the original discovery section
drilling including:
• 16m @ 5.09% Zn + Pb from 153m (EHRC733)
including 10m @ 7.05% Zn + Pb from 157m
•
29m @ 3.12% Zn + Pb from 174m (EHRC734)
including 14m @ 5.04% Zn + Pb from 183m
•
9m @ 4.89% Zn + Pb from 180m (EHRC738)
including 4m @ 7.93% Zn + Pb from 183m
•
•
These results highlight that Mato has the hallmarks of a large
mineralising sulphide system and provides further support to
Earaheedy developing into a world class base metal camp.
Important outcomes from the Mato drilling program include:
•
•
•
•
high-grade Zn-Pb sulphide mineralisation being continuous over
1600m cross strike and 350m along strike to the northwest;
mineralisation remains open in all directions;
multiple high grade feeder structures have been interpreted both from
geophysics and through stratigraphic offsets along drill sections; and
the host and style of the Mato Zn-Pb mineralisation is near identical
to the Chinook-Tonka-Navajoh Zn-Pb deposits.
•
Heritage clearance recently received allowing future extensional drilling
throughout the outlined 3km x 3km Mato target area.
•
Further geological interpretation underway to maximise the 2024 drilling
campaigns, which will be focused on intersecting the high-grade mineralising
features within the Mato system.
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Joint Company Secretary
Mr Trevor Hart
CFO & Joint Company
Secretary
Rumble Resources Limited (ASX: RTR) (“Rumble” or “the Company”) is pleased to announce exciting new
high-grade assay results returned from extensional drilling at the Mato Prospect, Earaheedy Project (refer Figure
1), located 110 km northeast of Wiluna, Western Australia. The drill holes are the first extensional drilling since
the original high-grade discovery (refer ASX: RTR announcement 5 October 2023 and ASX: RTR announcement
31 October 2023). Significantly, high grade mineralisation now extends up to 1600m across strike and 350m
along strike from the original discovery drill section at Mato and remains open in all directions.
Figure 1 - Earaheedy Project – Location of Chinook and Tonka-Navajoh Deposits, and the Mato Prospect over
interpretive solid geology.
Mato Prospect RC Drilling – E69/3787 and E69/3862 - RTR 100%
Extensional drilling at the Mato Prospect, within the 100% Rumble tenements,E69/3787 and E69/3862, has
returned new high-grade Zn-Pb sulphide intersections in both the up-dip position of, and 350m along strike to
the northwest of the original Mato discovery drill section (refer Figure 2). The reverse circulation (RC) drill
program completed in December 2023 consisted of only 13 holes for a total of 2152m, five of which have returned
high-grade Zn-Pb sulphide intersections. The most recent assay results include:
•
•
•
12m @ 6.07% Zn + Pb, 7.86g/t Ag from 146m (EHRC776)
including 8m @ 8.71% Zn + Pb, 11.25g/t Ag from 148m
19m @ 4.23% Zn + Pb, 3.93g/t Ag from 119m (EHRC778)
including 12m @ 5.28% Zn + Pb, 4.55g/t Ag from 119m
13m @ 3.31% Zn + Pb, 3.3g/t Ag from 145m (EHRC783)
including 6m @ 6.95% Zn + Pb, 6.54g/t Ag from 145m
2
•
•
12m @ 3.04% Zn + Pb, 2.78g/t Ag from 122m (EHRC788)
including 7m @ 4.4% Zn + Pb, 2.84g/t Ag from 124m
8m @ 2.91% Zn + Pb, 2.19g/t Ag from 158m (EHRC777)
including 3m @ 6.65% Zn + Pb, 4.70g/t Ag from 158m
The latest drilling at the Mato Prospect has extended sulphide mineralisation to over 1600m along the
original discovery section and preliminary geological interpretation of the drilling has highlighted multiple
faults, interpreted to potentially represent feeder structures that control the distribution of higher grade Zn-Pb
sulphide mineralisation throughout the Mato Prospect area (refer Figure 3). The feeder faults and high-grade
mineralisation at the Mato Prospect is inferred to strike northwest, though further RC extensional drilling along
strike is required to confirm the trend.
Only two broad spaced RC drill holes, EHRC787 and EHRC786, were completed over 1100m along strike to the
southeast of the original discovery section. These holes were deeply oxidised, which has likely impacted the
tenor of the mineralisation intersected. A large structural repetition of the host Navajoh Unconformity Unit and
Sweetwater’s Well Dolomite stratigraphy is interpreted to occur to the south of this drilling as the interpreted dip
of stratigraphy throughout the 10km long Mato Mineralisation Corridor does not match its assumed surface
position identified from field mapping and geochemical sampling. Therefore, it is interpreted that drill holes
EHRC787 and EHRC786 are likely situated adjacent to the axis of a district scale fault, and that further drilling
is required to the south of the drilling to date to test for the potential repetition of high-grade mineralisation.
Figure 2 – Mato Prospect discovery area and location of Section 1 – RC drill hole locations and assay results.
In January 2024, a further heritage clearance was received which will allow the Company to undertake
extensional RC drilling beyond the currently reported drill holes and to properly scope out the core 3km x 3km
target area at Mato on an approximate 400x100m spacing. Further heritage surveys are being planned for
additional drilling along the Mato trend outside of this area i.e. up-dip to the southwest and along strike to the
southeast and northwest. Interpretation and targeting are currently underway to optimise drill hole positioning for
the 2024 drilling campaigns, targeting the multiple interpreted high-grade mineralisation trends.
3
The recently acquired interest into E69/3815 (see announcement ASX: RTR 24 October 2023) opens up
potential for further Zn-Pb deposits west and northwest of Mato (refer Figures 1 and 2). Geological and
geophysical interpretation has inferred up to 30km of additional prospective unconformity style lithologies,
favourable structures and potential Zn-Pb mineralisation.
Next Steps
•
Metallurgical studies
A successful PQ diamond drilling campaign was recently completed over the Chinook Zn-Pb
deposit (see announcement ASX: RTR 9 January 2024). Approximately two tonnes of sulphide
material has been delivered to the Auralia Metallurgy laboratory in Perth, for beneficiation
testwork (DMS/ore sorting) and to provide samples for further flotation flowsheet optimisation
studies. The program has commenced and results are due to be reported in the first half of 2024.
•
Discovery and Resource drilling
Future RC drilling programs will be aimed at defining the limits of the emerging world class ZnPb-Ag base metal system within the interpreted 70km long Navajoh Unconformity Unit, with
emphasis on discovering and infilling on new and existing high-grade zones (i.e. Kalitan,
Chikamin, Colorado and Magazine Feeder Faults). In the short term the focus of this work will be
concentrated on the JV tenement E69/3464 and 100% Rumble E69/3464 and E69/3787
tenements.
•
Scoping studies
Work will commence on initial supporting scoping studies for the Earaheedy Project following
flotation optimisation and beneficiation testing, to consider some of the possible future
development scenarios/options.
4
Figure 3 - Mato Prospect – Section 1 – Drill hole assays results and interpreted geology and structure. Note: see Figure 2 for Section 1 location
5
About the Earaheedy Project
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna in Western Australia,
with access to major highways, power (gas pipeline), rail, ports, airports and experienced mining workforce (refer
Figure 4). The Project includes tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals
Ltd (ASX: ZNC) 25% Joint Venture (“JV”), and tenements E69/3787, E69/3862 and newly added tenements E69/4124
and E69/4149, which are all 100% controlled by Rumble (refer Figures 1 and 4).
In addition to the above tenements, Rumble is acquiring 100% ownership in four granted exploration licences that lie
north and northwest of the existing tenure (refer to ASX:RTR release 24 October 2023). These tenements include
E69/3815, E69/3842, E69/3889 and E52/3879. The addition of the latest tenure will increase the Earaheedy Project
landholding to over 1760km² in area.
Rumble announced a major discovery on 19 April 2021 and two years later to the day on 19 April 2023, announced a
globally significant, pit constrained, maiden inferred Mineral Resource Estimate (MRE) of 94Mt @ 3.1% Zn+Pb and
4.1g/t Ag at a 2% Zn+Pb cutoff (refer to ASX:RTR release dated 19 April 2023). This maiden MRE confirmed the
Earaheedy Project as one of the largest global zinc sulphide discoveries in the last decade. The strength of the MRE
is supported by a 41Mt of higher-grade resources that could be part of a possible early development scenario, and a
much larger 462Mt resource that could potentially be upgraded via beneficiation, providing the project with significant
future flexibility.
The Earaheedy Zn-Pb-Ag Project has exceptional near-term growth potential with the deposits open in all directions.
The recent tenement additions has significantly increased the strike potential to over 70km, with less than 25%
of the host unconformity effectively tested. Drilling by Rumble has focused on the Navajoh Unconformity Unit (host
to the current resources) with the aim to find additional large shallow flat lying sulphide deposits (i.e. Chinook and
Tonka-Navajoh) amenable to large scale open cut mining, whilst none of the thick underlying geologically fertile
formations which could potentially host high-grade Mississippi Valley Type (MVT) deposits have yet to be tested.
The sheer scale, optionality, location and extraordinary growth potential of Earaheedy could see the Project stamp
itself as a world class, multi-decade production asset and play a key role in the future global renewable energy
transition.
Figure 4 - The Earaheedy Zn-Pb-Ag-Cu Project location and existing infrastructure within Western Australia
6
Authorisation
This announcement is authorised for release by Peter Harold, Managing Director and CEO of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Previous Drill Results
Drill hole results are ongoing and previous assays have been reported in earlier ASX announcements.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
ASX Release 23/8/2019 – 14 High Priority Targets and New Mineralisation Style
ASX Release 23/1/2020 – Large Scale Zn-Pb-Ag Discoveries at Earaheedy
ASX Release 19/4/2021 – Major Zinc-Lead Discovery at Earaheedy Project, Western Australia
ASX Release 2/6/2021 – Large Scale Zinc-Lead-Silver SEDEX Style System Emerging at Earaheedy
ASX Release 8/7/2021 – Broad Spaced Scout Drilling Has Significantly Increased the Zn-Pb-Ag-Mn footprint at
Earaheedy
ASX Release 23/8/2021 – Earaheedy Zn-Pb-Ag-Mn Project – Exploration Update
ASX Release 13/12/2021 - New Zinc-Lead-Silver Discovery at Earaheedy Project
ASX Release 21/12/2021 – Major Zinc-Lead-Silver-Copper Feeder Fault Intersected
ASX Release 20/1/2022 – Two Key Tenements Granted at Earaheedy Zn-Pb-Ag-Cu Project
ASX Release 31/1/2022 – Shallow High-Grade Zn-Pb Sulphides Intersected at Earaheedy
ASX Release 21/2/2022 – Further High-Grade Zn-Pb Results and Strong Grade Continuity
ASX Release 9/3/2022 – Major Expansion of Zn - Pb Mineralised Footprint at Earaheedy
ASX Release 26/5/2022 - Multiple New High-Grade Zn-Pb Zones defined at Earaheedy
ASX Release 18/7/2022 – Heritage Clearance Confirmed- Sweetwater drilling commenced
ASX Release 23/08/2022 – Significant Zones of Zn-Pb Sulphides Intersected
ASX Release 30/08/2022 – High grade Zn-Pb drill intercepts at Tonka
ASX Release 29/09/2022 – New 2.2km High Grade Chikamin Feeder Zone extends Chinook
ASX Release 3/11/2022 – High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
ASX Release 17/11/2022 – Exceptional Metallurgical Results at Earaheedy Project
ASX Release 16/02/2023 – Multiple New High-Grade Feeder Targets Defined
ASX Release 14/03/2023 – Chinook Zn-Pb Prospect expands to 8km strike
ASX Release 19/04/2023 – Maiden Resource Confirms Earaheedy's World Class Potential
ASX Release 03/05/2023 – Heritage Clearance Received for Navajoh Southeast Trend
ASX Release 01/06/2023 – High impact drilling commences at the Earaheedy Project
ASX Release 17/07/2023 – Zinc Lead Mineralisation Discovered in Drilling
ASX Release 5/10/2023 – High Grade Zinc-Lead intersected at the Mato Prospect
ASX Release 31/10/2023 – Mato Discovery Confirmed with Further High-Grade Zn-Pb Mineralisation
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was established
with the aim of adding significant value to its current mineral exploration assets and to look for suitable mineral acquisition
opportunities both in Australia and abroad. The discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the
capabilities of the team for find world class orebodies.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly represents
information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is
an employee of Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Timmermans consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
7
Previously Reported Information
The Information in this announcement that relates to Exploration Results and Mineral Resources for the Earaheedy Project is
extracted from the previous ASX announcements “Maiden Resource Confirms Earaheedy’s World Class Potential” released on
19 March 2023, “Chinook Zn-Pb Prospect expands to 8km strike” on 14 March 2023 and “Multiple New High-Grade Feeder
Targets Defined” on 16 February 2023. These announcements are available to view on the Company’s website at
www.rumbleresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects
the Exploration Results included in the relevant original market announcements. The Company confirms that the form and context
in which the Competent Person and Qualified Person’s findings are presented have not been materially modified from the relevant
original market announcements. The Company confirms in the case of Mineral Resources that all material assumptions and
technical parameters underpinning the estimates in the original release continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the relevant original market announcements.
Forward Looking Statements
This announcement may contain forward-looking information, including forward looking information within the meaning of
Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities
Litigation Reform Act of 1995 (collectively, forward- looking statements). These forward-looking statements are made as of the
date of this report and Rumble Resources Limited (the Company) does not intend, and does not assume any obligation, to update
these forward-looking statements. Forward-looking statements relate to future events or future performance and reflect Company
management’s expectations or beliefs regarding future events and include, but are not limited to: the impact of the discovery on
the Earaheedy Project’s capital payback; the Company’s strategy; the estimated timing of drilling at the Earaheedy Project; the
Company’s intended activities at the Earaheedy Project; and the success of future mining operations.
In certain cases, forward-looking statements can be identified by the use of words such as, “affords”, “anticipates”, “believe”,
“considered”, “continue”, “could”, “establishes”, “estimate”, “expected”, “future”, “interpreted”, “likely”, “looking”, “may”, “open”,
“plan” or “planned”, “potential”, “robust”, “targets”, “will” or variations of such words and phrases or statements that certain actions,
events or results may, could, would, might or will be taken, occur or be achieved or the negative of these terms or comparable
terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors
which may cause the actual results, performance or achievements of the Company to be materially different from any future
results, performance or achievements expressed or implied by the forward-looking statements.
Such factors may include, among others, risks related to actual results of current or planned exploration activities; whether
geophysical and geochemical anomalies are related to economic mineralisation or some other feature; obtaining appropriate
access to undertake additional ground disturbing exploration work at the Earaheedy Project; the results from testing various
anomalies; results of metallurgical test work Including results from other zones not tested yet, scaling up to commercial operations;
changes in project parameters as plans continue to be refined; changes in exploration programs and budgets based upon the
results of exploration, changes in commodity prices; economic conditions; grade or recovery rates; political and social risks,
accidents, labour disputes and other risks of the mining industry; delays or difficulty in obtaining governmental approvals,
necessary licences, permits or financing to undertake future mining development activities; changes to the regulatory framework
within which Rumble operates or may in the future; movements in the share price of investments and the timing and proceeds
realised on future disposals of investments, the impact of the COVID 19 pandemic as well as those factors detailed from time to
time in the Company’s interim and annual financial statements, all of which are filed and available for review at asx.com.au and
the Company’s website.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ
materially from those described in forward-looking statements, there may be other factors that cause actions, events or results
not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers
should not place undue reliance on forward-looking statements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth or
other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties,
as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and developments may differ
materially from those expressed or implied by these forward looking statements depending on a variety of factors. Nothing in this
report should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities. This document has been
prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United
States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or
incorporated by reference in this document have been, and will be prepared in accordance with the JORC classification system
of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geoscientists.
8
Table 1 – Drill Hole Location, Intersections and Assay Table – Mato Prospect
Hole ID
E MGA
N MGA
Depth
(m)
Dip
Azi
From
(m)
To
(m)
Width
(m)
0.5%
Zn+Pb
EHRC776
238228
7168454
180
-90
0
146
158
12
6.07
incl.
148
154
8
EHRC777
238336
7168628
192
-90
0
158
165
8
incl.
158
161
3
incl.
159
160
1
0
119
138
19
2%
Zn+Pb
4% Zn +
Pb
6% Zn +
Pb
8.71
2.91
6.65
11.37
4.23
Ag
g/t
S%
Zn
%
Pb
%
7.86
8.37
4.23
1.84
11.25
12.12
6.07
2.65
2.19
3.54
2.58
0.34
4.7
8.54
5.83
0.83
8.3
13.05
9.67
1.7
3.93
5.56
3.36
0.88
EHRC778
238125
7168280
156
-90
incl.
119
131
12
4.55
6.55
4.34
0.94
EHRC779
238048
7168106
144
-90
0
90
103
13
0.99
1.37
0.16
0.3
0.69
EHRC780
237939
7167991
120
-90
0
92
94
4
0.73
0.5
0.12
0.46
0.28
EHRC781
238439
7169428
210
-90
0
EHRC782
238072
7168835
210
-90
0
173
184
11
1.57
3.17
3.56
1.03
0.54
EHRC783
237853
7168489
174
-90
0
145
158
13
3.31
3.3
4.17
2.52
0.79
incl.
145
150
6
6.54
8.65
5.41
1.54
EHRC784
EHRC785
237652
237965
7168160
7168662
123
190
-90
-90
5.28
Other
NSA
6.95
0
85
104
19
incl.
100
103
3
0
159
173
14
incl.
165
166
1
8
0.59
0.59
EHRC786
239171
7167860
126
-90
0
98
106
EHRC787
239363
7168204
174
-90
0
152
155
3
EHRC788
237750
7168318
150
-90
0
122
134
12
incl.
124
131
7
incl.
124
126
2
0.97
2.13
1.01
2.2
3.04
4.4
6.13
9
6.08
1.5
0.55
0.42
11.03
2.46
1.01
1.12
2.29
1.55
0.68
0.33
6.4
5.86
1.49
0.71
0.43
0.15
0.34
0.25
2.7
3.9
0.05
0.54
2.78
3.5
2
1.04
2.84
4.44
3.09
1.32
4.15
9.01
4.79
1.34
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Commentary
RC sampling completed on 1m
intervals using Metzke Static cone
splitter is dry. If wet, sample
collected in large polywoven, then
allowed to dry for 24 hrs. Sampling
was by spear along inside of bag.
Weight of sample was on average
>2kg.
Samples sent to ALS, Malaga,
Perth, WA and are being assayed
using a four acid digest and read
by ICP-AES analytical instrument.
At total of 33 elements are
reported including Ag, Al, As, Ba,
Bi, Ca, Cd, Ce, Co, Cr, Cu, Fe, K,
La, Li, Mg, Mn, Mo, Na, Ni, P, Pb,
S, Sb, Sc, Sr, Th, Ti, Tl, U, V, W,
Zn.
pXRF analysis utilises a Vanta
Olympus XRF analyser and
involves a single shot every metre
(RC) with routine standards (CRM)
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.).
•
•
RC face hammer sampling (5.5in
diameter). Rig used was an Atlas
Copco 220 with 1250cfm air and
435psi compressor.
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
•
RC drilling cuttings were collected
as 1 metre intervals with
corresponding chip tray interval
kept for reference.
In general the dry sample versus
the wet sample weight did not vary
as the wet sample was collected in
a polyweave bag which allowed
excess water to seep and kept the
drill cutting fines intact in the bag.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
10
•
•
•
•
•
•
•
Each metre was geologically
logged with pXRF analysis.
All drill cuttings logged.
RC Drilling as below:
o Each metre was analysed
by a Vanta pXRF. The
Vanta used standards
(CRM).
o If the assay response was
>1000ppm Zn, a sample
(>2kg) was taken and
delivered to ALS for wet
analysis.
Criteria
JORC Code explanation
Commentary
o
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
Sampling QA/QC involved
a duplicate taken every
20m, and a standard taken
every 20m. 4 standards
(OREAS CRMs) levels
and one blank were used
randomly.
The
assigned
assaying
methodology (4 acid) is total digest.
As discussed, the Vanta pXRF
analyser was used to threshold the
collection of samples for wet
analysis.
In addition to Rumbles’ QA/QC
methods (duplicates, standards
and blanks), the laboratory has
additional checks.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
•
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structure
Share your feedback
Discover