Commencement of Drilling at Western Queen
Released
Released
Announcement PDF
20 November 2024
Commencement of major drilling program at
Western Queen targeting high-grade gold
•
A major drill program has commenced at Western Queen consisting of up to
15,000m of RC and 5,000m of diamond drilling
•
The drill program will target the discovery of new high-grade plunging shoots and
has the potential to grow the resources beneath the Western Queen South, Princess,
•
T +61 8 6555 3980
Following the recently announced 76% increase in gold resources, the Western
F +61 8 6555 3981
Queen Resources are now 4.42Mt at 2.02g/t Au for 286,600oz1, with mineralisation
rumbleresources.com.au
The drilling is being undertaken by Topdrill under an arrangement whereby up to
ASX RTR
50% of the invoiced costs apportioned to actual drilling activities, at Rumble’s
Executives &
Management
election, can be converted to equity in Rumble, up to a maximum of $1 million
•
The Western Queen Resources are on granted Mining Licences located within
a 100km radius of three gold processing facilities
•
Historical mining recovered 880,000t at 7.6g/t Au for 215,000oz from the Western
Queen gold deposits and supports the potential for the discovery of further highgrade mineralisation similar to Spartan Resources Never Never discovery
•
Level 1, 16 Ord Street,
West Perth, WA 6005
Marquis, Duke and Western Queen Central deposits
open along strike and at depth within the main 2.7km strike zone
•
Rumble Resources Ltd
Drilling will also test high-grade tungsten mineralisation that occurs within and in
close proximity to the delineated gold resources
Peter Harold, Rumble Managing Director and CEO commented: “following the recent
two tranche placement to raise $7.1 million we are delighted that Topdrill has
commenced drilling at Western Queen. With the support of Bain Resources and their
associates together with new and existing shareholders who participated in the
placements we are now well funded and can aggressively explore Western Queen.
Given the previous high-grade production and the existing resources of close to
300,000ozs and the limited drilling below most of the known deposits there is a strong
possibility this drill program could result in an increase in the Western Queen gold
inventory.”
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Trevor Hart
CFO & Joint Company
Secretary
Mr Steven Wood Joint
Company Secretary
Figure 1 – Topdrill RC rig drilling at Western Queen South
1.Refer to Rumble ASX release 15 October 2024 “Western Queen Resources increased 76% to 287koz at 2.02g/t”
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to announce the commencement
of a 20,000m drill program at the Western Queen gold-tungsten project. Drilling will target areas containing multiple
high-grade zones and unexplored areas beneath the Western Queen South, Marquis, Duke, Princess and Western
Queen Central deposits, where exploration success could deliver increases to the recently upgraded Mineral
Resources of 286,600 oz @ 2.02g/t.
Figure 2 – Western Queen Gold Project – previous mining, previous drilling and near deposit exploration potential
Exploration Program
The total drill program will include up to 15,000m of reverse circulation (RC) and 5,000m of diamond core
drilling, and will be separated into two phases. The first phase consists of 7,500m of RC and 1,250m of
diamond drilling and is expected to be completed this calendar year. The second phase will commence early
in the new year and is expected to be completed during the first quarter of 2025 and will have the benefit of
the results of the first phase of drilling to further assist with targeting extensions to high-grade mineralisation.
The key focus of this drill program is to target high-grade down plunge extensions to previously intercepted
mineralisation along the main 2.7km project area within the granted mining leases, ML59/45 and ML59/208.
The drilling will be focused primarily beneath the Western Queen South, Princess, Duke and Western Queen
Central deposits. It is anticipated that this drilling will form the basis for a further Mineral Resource upgrade in
2025 off the back of the recently announced Mineral Resource Estimate of 4.42Mt @ 2.02g/t Au for
286,600ozwhich represented a 76% increase in the total resources within the Western Queen Project.
Importantly, the current drill program has been designed to target both high-grade gold and the recently
discovered tungsten mineralisation.
2
The priority areas for this drilling program are as follows (refer to Figure 2):
•
•
Princess - the Princess deposit area lies between Western Queen South (WQS) and Western
Queen Central (WQC) open pit. This area has seen extensive historical small scale shaft mining,
while only sparse exploration drilling has occurred below the upper oxide-transitional zone (50-80m
vertical depth). Previous exploration drilling at Princess returned high-grade gold intercepts
including:
o
11m @ 6.11g/t Au from 52m (WQJC-2)
o
3m @ 19.90g/t Au from 8m (WQRC011)
o
2m @ 40.37g/t Au from 4m (WQY-85)
o
2m @ 8.26g/t Au from 39m (WQRC088)
o
4m @ 49.73 g/t Au from 134m (QND-38975-1)
Western Queen South (WQS) - immediately below the WQS resource, multiple high-grade lodes
exist which are open at depth. Previous exploration drilling at WQS returned high-grade gold
intercepts including:
o
5m @ 38.76 g/t Au from 193m (WQRC188)
o
5m @ 5.02g/t Au from 216m (WQDD013) – potential new parallel lode
o
o
6.4m @ 36.09 g/t Au from 305.7m (WQD-1072)
6m @ 34.24 g/t Au from 354m (WQRC007D)
o
•
Western Queen Central (WQC) - beneath the WQC open pit and underground workings, multiple
high-grade lodes exist which remain open and untested at depth. Previous exploration drilling at
WQC returned high-grade gold intercepts including:
o
o
•
5m @ 22.00 g/t Au from 280m (WQRC150)
11.8m @ 16.08 g/t Au from 340.4m (WQD-1089)
Duke - below the Duke deposit, immediately north of WQC, high-grade gold mineralisation is open
at depth. Previous exploration drilling at Duke returned intercepts including:
o
8m @ 26.27 g/t Au from 14m (WQRC155)
o
o
7m @ 60.60 g/t Au from 70m (WQJC-32)
6m @ 37.34 g/t Au from 50m (QNC-10310-1)
o
•
17m @ 5.70 g/t Au from 221m (WQRC188)
6m @ 25.87 g/t Au from 48m (WQRC157)
Marquis - below the Marquis Prospect, only 500m south of WQS, gold mineralisation has been
intercepted in wide spaced drilling and is open at depth. Previous exploration drilling at Marquis
returned intercepts including:
o
o
6m @ 4.30 g/t Au from 108m (WQRC159)
4m @ 5.67 g/t Au from 70m (WQRC052)
Drill for Equity Arrangement
Topdrill is undertaking this drill program for Rumble under a drill for equity arrangement. The arrangement
allows the Company, at Rumble’s election, to satisfy up to 50% of the invoiced drilling costs apportioned to
actual drilling activities for each monthly invoice through the issue of ordinary shares in the Company, up to a
maximum of $1,000,000.
The issue price is to be determined by the 5-day volume weighted average price (“VWAP”) that the Company’s
shares trade at immediately preceding each invoice date. Shares issued under the drill for equity agreement
are to be voluntarily escrowed for six months from the invoice date.
3
About Western Queen
The Western Queen Project is located within a 100km radius of three gold processing plants (refer to Figure
3). The closest is at Dalgaranga, 48km by road from Western Queen, which has a capacity of 2.5Mtpa
(currently on care and maintenance). The Checkers plant, at Mt Magnet, has a capacity of 1.9Mtpa and the
Tuckabianna plant, near Cue, has a capacity of 1.2Mtpa. These two operating plants provide the potential for
a near term toll treating option for Western Queen ore.
Figure 3 – Western Queen mining licences and proximity to existing gold processing plants
Authorisation
This announcement is authorised for release by board of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Peter Harold
Peter Venn
Trevor Hart
Managing Director & CEO
Technical Director
Chief Financial Officer
Rumble Resources Limited.
Rumble Resources Limited
Rumble Resources Limited
info@rumbleresources.com.au
About Rumble
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for suitable
mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold Project which has the potential
to deliver near term cash flow from the existing open pit resources and resource growth through future exploration
success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the capabilities of the
exploration team to find world class orebodies.
4
Table 1 - Mineral Resource Estimate Tabulation for the Western Queen Project broken down by Resource Area and split of
Indicated and Inferred Resources for reported Open Pit and Underground economic cut-offs
Refer Rumble ASX release 15 October 2024 “Western Queen Resources increased 76% to 287koz at 2.02g/t”
Prospect
WQ
Central
Mining
Method
Cut-off
g/t
OC
0.5
UG
1.5
Classification
Tonnes
(t)
Au g/t
Contained
Metal
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
480,201
162,172
642,373
113,336
471,388
584,724
593,537
633,560
1,227,097
1,314,113
102,338
1,416,451
250,672
476,306
726,978
1,564,785
578,644
2,143,429
51,834
65,598
117,432
714
714
51,834
66,312
118,146
177,575
487,825
665,400
187,262
187,262
177,575
675,087
852,662
74,042
74,042
74,042
74,042
2,023,723
891,975
2,915,698
364,008
1,135,670
1,499,678
2,387,731
2,027,645
4,415,376
1.77
1.19
1.62
8.78
3.00
4.12
3.11
2.54
2.81
1.62
1.23
1.59
2.71
2.00
2.24
1.79
1.86
1.81
4.23
2.70
3.38
2.23
2.23
4.23
2.70
3.37
0.92
1.04
1.01
2.17
2.17
0.92
1.35
1.26
1.39
1.39
1.39
1.39
1.66
1.24
1.53
4.60
2.44
2.97
2.11
1.91
2.02
27,255
6,228
33,483
32,006
45,490
77,496
59,261
51,718
110,979
68,460
4,046
72,506
21,821
30,561
52,381
90,281
34,607
124,887
7,046
5,698
12,744
51
51
7,046
5,749
12,795
5,248
16,276
21,524
13,073
13,073
5,248
29,349
34,597
3,299
3,299
3,299
3,299
108,009
35,548
143,557
53,826
89,175
143,001
161,836
124,723
286,558
TOTAL
WQ
South
OC
0.5
UG
1.5
TOTAL
Duke
OC
0.5
UG
1.5
TOTAL
Princess
OC
0.5
UG
1.5
TOTAL
Cranes
OC
0.5
UG
1.5
TOTAL
Total
OC
0.5
UG
1.5
TOTAL
Note: Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
All Mineral Resources figures reported in the table above represent estimates at October, 2024. Mineral Resource estimates
are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. OC is Open Cut for Resources above the 245mRL and
UG is Underground for Resources below the 245mRL.
5
Previous ASX Announcements – Western Queen Gold Project
• 6/8/2019 – Option to Acquire High-Grade Western Queen Gold Project
• 4/11/2019 – Western Queen Gold Project – Multiple Targets to be Drilled
• 22/11/2019 – Drilling Commenced at Western Queen Gold Project
• 17/2/2020 – High Grade Gold Discovery at the Western Queen Project
• 25/2/2020 – Drilling Commenced at the Western Queen Gold Project
• 14/4/2020 – Exploration Update – Three Drill Programmes Completed
• 20/5/2020 – Drilling Identifies Multiple High-Grade Gold Shoots
• 9/6/2020 – Major Drill Programme to Commence – Western Queen Gold Project
• 24/6/2020 – Major Drill Programme Commenced at The Western Queen Gold Project
• 16/7/2020 – 500% Increase in Landholding Extends Western Queen Project
• 31/8/2020 – Option Exercised to Acquire the Western Queen Gold Project
• 10/9/2020 – 100% Acquisition of Western Queen Gold Project Complete
• 4/11/2020 – Discovery High-Grade Gold Shoots and Shear Zone Extension
• 3/2/2021 – High-Grade Gold Shoots at Western Queen South Deposit
• 2/8/2021 – Western Queen Resource Upgrade to 163,000oz
• 29/4/2024 – Drilling to test High-Grade Gold Zones at Western Queen
• 29/5/2024 – Western Queen Drilling Commenced
• 16/7/2024 – Western Queen Drilling Update
• 6/8/2024 – High-Grade Tungsten Discovery at Western Queen
• 2/9/2024 – Tungsten Discovery at Western Queen Confirmed
• 27/09/2024 - Rumble welcomes new Strategic Investor
• 15/10/2024 – Western Queen Gold Resources increased 76% to 287koz
Competent Persons Statement
The information in this report that relates to exploration data, geological Interpretation and sampling information informing the Mineral
Resource Estimate and potential for eventual economic extraction of the Mineral Resources is based on and fairly represents information
compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is an employee of
Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX market
announcements released on the date noted in the body of the text where that reference appears. The previous market announcements
are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcements. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production
levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth or other trend projections.
Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which
are beyond the control of Rumble Resources Ltd. Actual results and developments may differ materially from those expressed or implied
by these forward-looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in
accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of
Geoscientists.
6
Share your feedback
Discover