Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
•
31 July 2023
June 2023 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide
an update with respect to the Company’s activities during the June 2023 quarter,
focusing on rapidly advancing the emerging world class Earaheedy Zinc-Lead-Silver
Project. Highlights include:
Earaheedy Zn-Pb-Ag-Cu Project, Western Australia
Maiden, pit constrained; Inferred Mineral Resource Estimate (MRE)
•
•
•
94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) constrained within
optimised pit shells
Contained metal - 2.2Mt zinc, 0.6Mt lead and 12.6Moz silver
Represents one of the largest zinc sulphide discoveries globally in the last
decade
Sweetwater Trend – ‘Mato Prospect’
•
•
•
RC drilling commenced testing a potential 9km x 3km area. 7.5km west of
the Chinook Deposit, named the Mato Prospect
First five RC drill holes intersecting visible Zn-Pb sulphide mineralisation
Early exploration success results in newly named Mato Prospect
Chinook Deposit – EIS funded Diamond Drilling
•
EIS co-funded diamond drilling hole at Chinook West has intersected a broad
zone of visible sphalerite, galena, and minor chalcopyrite
Navajoh Southeast Trend – Drilling Commences
•
RC drilling commenced testing 9km trend southeast of the Navajoh deposit
New Tenement Applications Increase Earaheedy Project by 170%
•
New tenement applications interpreted to have the potential to host high grade
MVT deposits have been lodged, increasing the Earaheedy Project tenure by
170% to 1,154km2
Next Steps
•
•
•
•
Continue RC discovery drilling – testing high-grade feeder fault targets
generated along the 9km Mato Prospect and 9km Navajoh Southeast and
Resource definition drilling – expand & upgrade classification of deposits
Metallurgical studies – further optimise flotation and commence testing
beneficiation techniques
Scoping studies – review early development scenarios/options
Corporate
•
Cash position of $4.2 million plus $220k in AIC Shares at the end of the quarter
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Shane Sikora
Managing Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Peter Venn
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Steven Wood
Company Secretary
Mr Brett Keillor
Head of Technical
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
1.1
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna, Western Australia.
The Project includes granted tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals
Ltd (ASX: ZNC) 25% Joint Venture (“JV”) and E69/3787, E69/3862, ELA 69/4124, ELA69/4149 and ELA 69/4165,
which is 100% owned by Rumble (see Figure 2).
Maiden, pit constrained; Inferred Mineral Resource Estimate (MRE):
The Company released the maiden Mineral Resource Estimate (MRE) for the Earaheedy Zn-Pb-Ag Project. The
Resource was reported in accordance with the reporting requirements set out in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code) (refer to Table
A and ASX release 19 April 2023).
• 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) constrained within optimized pit shells
• Contained metal of 2.2Mt zinc, 0.6Mt lead and 12.6Moz silver
• Represents one of the largest zinc sulphide discoveries globally in the last decade
Exceptional resource growth and Tier 1 scale potential
• The Chinook, Tonka and Navajoh deposits remain open downdip and along strike, demonstrating the
potential for significant resource growth in the future
• Less than 35% of the targeted 45km, shallow and flat lying mineralised Unconformity Unit that hosts
the potentially open pittable Zn-Pb-Ag resources, has been effectively drill tested
• Recently reported gravity survey has defined numerous higher grade feeder structure targets
along strike to the northwest, and southeast within RTR’s 100% EL’s
• Significant potential to discover high grade MVT & structurally controlled deposits in the fertile
underlying carbonate formations which are yet to be tested
Excellent metallurgical results
• Previously reported sighter flotation metallurgical results have highlighted the potential for a clean highly
marketable bulk concentrate with Zn cleaner recoveries up to 87%, and grades to 64% Zn+Pb.
Simple and conventional process flowsheet with low capital/operational cost potential
Project Optionality
• The pit constrained MRE hosts a 41Mt higher-grade component above a 3% Zn+Pb cut-off grade, and
a very large 462Mt component above 0.5% Zn+Pb cut-off grade that has the potential to be upgraded
through beneficiation, providing the Earaheedy Project with significant optionality for future
development
Rumble Resources Limited - ASX: RTR
Page | 2
Table A: Maiden Inferred Mineral Resource tabulation for the Earaheedy Project.
Inferred – Chinook
Cut off
Zn+Pb
Inferred – Tonka and Navajoh
Inferred Total
Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag
%
Mt
%
%
%
g/t
Mt
%
%
%
g/t
Mt
%
%
%
g/t
0.5
334
1.3
0.9
0.4
2.3
128
1.5
1.2
0.2
1.9
462
1.3
1.0
0.3
2.2
1.0
135
2.1
1.5
0.6
3.4
59
2.3
2.0
0.4
2.6
194
2.2
1.6
0.5
3.1
2.0
63
3.0
2.1
0.8
4.6
31
3.3
2.8
0.5
3.4
94
3.1
2.4
0.7
4.2
2.5
39
3.4
2.4
0.9
5.2
25
3.5
3.0
0.5
3.6
65
3.4
2.6
0.8
4.5
3.0
24
3.8
2.7
1.1
5.7
17
3.9
3.3
0.6
3.8
41
3.8
3.0
0.9
4.9
4.0
7
4.7
3.3
1.5
6.8
5
4.9
4.1
0.8
4.3
12
4.8
3.6
1.2
5.7
Footnote: Inferred Mineral Resource is constrained within optimised pit shells and tabulated above at different economic Zn+Pb% cutoffs.
n
%
rade Tonnage
ur e
ul hide
o ains
600
60
1
1
1
00
0
0
0
00
t
1
300
30
rade
ass
1
1
0
200
1
1
1
1
1
1
1
1
1
20
1
1
1
11
10
100
10
1
1
0
1
1
0
Tonnes
0
38
36
3
32
30
28
26
%
2
18
n
22
16
rade
20
1
ut o
12
11
10
09
08
07
06
0
0
03
02
00
00
n
%
Figure 1: Earaheedy Zn+Pb grade – tonnage plot for the pit constrained sulphide mineralisation
Rumble Resources Limited - ASX: RTR
n
%
0
Page | 3
Exceptional Resource Growth Potential and Opportunities
The Project has exceptional growth potential with only two (Types 1 and 2 – refer to Figure 3) of the five identified
mineralised styles explored, and less than 35% of the 45km Unconformity Unit effectively tested by drilling. These
untested and open extensions occur largely within Rumble’s recently granted 100% tenements E69/3787 and
E69/3862 - (See Figure 2).
Figure 2 – Earaheedy Project – Location of Deposits and Prospectivity Map
Figure 3: Earaheedy Mineralisation Styles
Rumble Resources Limited - ASX: RTR
Page | 4
Sweetwater Trend – Newly na ed ‘ ato Prospect’ - E69/3787 100%
During the quarter, the Company commenced RC drilling along the Sweetwater Trend, testing targets identified from
airborne gravity and multielement soil sampling surveys.
Subsequent to the end of the Quarter, RC drilling, testing a new area 7.5km west of the Chinook Deposit, has
intersected Zn-Pb sulphide mineralisation in the first five drill holes at the newly named ‘Mato Prospect’.
Geological logging of the drill holes importantly indicates that the Zn-Pb mineralisation occurs within the Navajoh
Unconformity Unit and has similar geological controls that host the Chinook, Tonka, and Navajoh deposits.
Further interpretation of the Airborne Gravity Gradiometry (FalconTM) Survey (AGG) completed in 2022 has
highlighted multiple new gravity targets at the Mato Prospect that could potentially represent high-grade feeders.
This initial drill testing along with coincident Zn-Pb soil geochemistry has outlined a potential 9km long x 3km area
(Mato Prospect) that could host a significant new Zn-Pb sulphide deposit and add to the emerging world class base
metal system at Earaheedy. Refer ASX release 17 July 2023 and Figure 2.
Chinook Deposit – E69/3787 (100% RTR) – EIS Diamond Drilling
During the Quarter, the Company commenced an EIS co-funded deep (~700m) diamond drill hole at Chinook West.
At the end of the quarter, the Company announced that the drilling had intersected a broad zone of visible sphalerite,
galena, and minor chalcopyrite within the Navajoh Unconformity Unit and underlying Sweetwater’s Well Dolomite.
Refer ASX release 17 July 2023 and Figure 2.
Ongoing geological logging and interpretation of this diamond drill hole will assist Rumble with vectoring towards
potential high-grade feeder faults in the underlying carbonate members and altered basement lithologies below
Rumbles’ Chinook, Tonka and Navajoh deposits.
Navajoh Southeast Trend E69/3787 100%
During the quarter, wide spaced RC scoping drilling has been completed to test several high priority gravity targets
which are considered analogous structural zones to known mineralisation at the Tonka and Navajoh deposits within
E69/3464. Twenty-one (21) drill holes have been completed to date, intersecting wide-spread base metal anomalism
and structural zones considered to be good pathways for mineralised fluids. This drilling has intersected stratigraphic
units that underlie the known mineralised hosts at the Chinook, Tonka and Navajoh deposits, which are considered
less favourable to host economic base metal mineralisation.
A Heritage Survey request has been submitted for additional drilling to extend the drill lines northeast of the current
drilling, where it is expected that drilling will intersect the more favourable upper Sweetwaters Well Dolomite and
Navajoh Unconformity Unit which are the recognised lithologies to the Chinook, Tonka and Navajoh resources.
Additionally, interpretation of the completed Navajoh Southeast Trend drilling has highlighted the existing heritage
cleared drill hole traverses could also target structurally controlled, high-grade MVT related mineralisation within the
underlying Iroquois Carbonate Member, which has been intercepted at shallower depths than expected. Refer ASX
release 17 July 2023 and Figure 2.
New Tenure Applications at Earaheedy Project
During the quarter and following a major geological targeting campaign, Rumble recently applied (100% RTR) for
three prospective exploration licences, ELA69/4124, ELA69/4149 and ELA69/4165, which are contiguous with the
existing Earaheedy Project tenure. The new tenure applications increase the overall Earaheedy Project area by 170%
to 1154km2. Refer ASX release 17 July 2023 and Figure 2.
Rumble Resources Limited - ASX: RTR
Page | 5
Significantly, the new tenure applications cover the interpreted basal Iroquois Carbonate Member contact with the
Archean granite/granodiorite basement, proximal to a major interpreted northwest striking structure. This
stratigraphic position is considered favourable to host similar high-grade MVT related mineralisation to that
intersected at the recent Iroquois discovery (including 4m @ 27.0% Zn and 19.9g/t Ag) by Strickland Metals (ASX:
STK, refer ASX announcement 17 May 2023).
Initial geological field reconnaissance work of the new applications has been completed utilising existing tracks, and
has confirmed Rumble’s interpretation that the basal Earaheedy Basin contact is further south than previously
interpreted, and has highlighted several high priority areas for geochemical sampling and field mapping once the
tenure is granted
Next Steps at the Earaheedy Project
•
Discovery drilling – Aimed at identifying new high grade feeder faults from advanced targets highlighted
along the 9km Mato Prospect, 9km Navajoh Southeast Trend and extending the high-grade feeder structures
within and between the Chinook, Tonka and Navajoh deposit areas.
•
Resource definition drilling – Infill RC, diamond and sonic drilling is planned to improve the confidence and
classification of the existing MRE.
•
Metallurgical studies – Diamond and sonic drilling variability and composite samples will be collected to
confirm the simple and conventional flowsheet, and further improve the flotation performance. Additionally,
value adding beneficiation work (dense media separation and ore sorting) will commence once the required
volumes of cored material have arrived from site.
• Scoping studies – Work will commence late in 2023 on initial supporting scoping studies for the Project,
which will review some of the early development scenarios/options.
1.2
Other Projects, Western Australia
No significant exploration or activity completed on the Company’s other regional projects (i.e., Fraser Range,
Braeside, Warroo, Munarra Gully, Lamil and Western Queen). The Company continues to review opportunities for
these projects with the Company’s focus on rapidly advancing the emerging world class Earaheedy Zinc-Lead-Silver
Project.
2. Corporate
2.1 Cash and Investments
As at 30 June 2023, Rumble held $4.2 million in Cash and circa $220k in AIC listed Shares.
2.2 Appendix 5b – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling A$1.9 million.
Cash outflows for the June 2023 Quarter totalled $3 million across exploration activity (63%), staff costs (23%),
administration and corporate costs (13%).
Cash inflows for the March 2023 Quarter totalled $225k consisting of proceeds from the fuel tax credits (5%), GST
refunded (46%), Government grant funding (41%) and interest received (8%).
Rumble Resources Limited - ASX: RTR
Page | 6
2.3 Appendix 5b – Payments to related parties and their associates
Payments to related parties and their associates totalled $180k for the March 2023 quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, and superannuation
payments.
2.4 Tenement Holdings – Tenement Holdings
In accordance with ASX Listing Rule 5.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Shane Sikora, Managing Director of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble is firmly focussed on rapidly advancing the major Zinc-Lead discovery at the Earaheedy Project in Western Australia. Since the major
Zn-Pb-Ag-Cu discovery in April 2021 scoping and broad spaced infill drilling has rapidly uncovered an emerging world class scale Zn-Pb-AgCu base metal system, with interpretative geology and drilling continuing to make new discoveries and highlight multiple large-scale deposit
targets. In April 2023, Rumble announced the Maiden MRE. The focus of the geological team remains the targeting, delineation and extension
of the high-grade Zn-Pb feeder zones that continue to be discovered contemporaneously with the evolving structural and geological
understanding. The recent discovery of the high-grade Chikamin Feeder Zone and the results of the recent geophysical and geochemical
surveys has greatly increased Rumble’s confidence in defining multiple new high grade mineralised feeder zones within the Earaheedy
Project’s boundaries Rumble’s board and management team has a successful track record in making discoveries and project development
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy Project is based on and fairly represents information compiled
by Mr Luke Timmerman , who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is a full-time employee of Rumble
Resources Limited,. Mr Timmerman Venn has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” Mr Timmerman consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources in relation to the Earaheedy Project is based on and fairly represents
information compiled under the supervision of Mr Mark Carder who is a Member of the Australian Institute of Geoscientists (AIG) and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is
undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” The Company confirms that it is not aware of any new information or data that materially affects the
Mineral Resource information included in the Announcements.
The Information in this announcement that relates to prior Exploration Results for the Earaheedy Project is extracted from the following ASX
announcements:
-
17 July 2023 - Zinc Lead Mineralisation Discovered in Drilling
1June 2023 - High impact drilling commences at the Earaheedy Project
3 May 2023 - Heritage Clearance Received for Navajoh Southeast Trend
19 April 2023 - Maiden Mineral Resource - Earaheedy (Zn-Pb-Ag) Joint Venture
14 March 2023 - Chinook Zn-Pb Prospect expands to 8km strike.
16 February 2023 - Multiple New High-Grade Feeder Targets Defined
5 December 2022 - Drilling Results from Lamil Gold-Copper Project
17th November 2022 - Exceptional Metallurgical Results at Earaheedy Project
3rd November 2022- High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information included
in the Announcements. The Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the Announcements. The Company confirms that it is not aware of any information or data that materially affects
the information included in the relevant market announcement and all material assumptions and technical parameters underpinning the
estimates in the original announcement in respect of the Earaheedy MRE continue to apply and have not materially changed.
Rumble Resources Limited - ASX: RTR
Page | 7
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement Number
Status
Location
Beneficial Percentage Interest
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Thunderdome
E28/2366
Granted
Western Australia
30% Note 2
Thunderbolt
E28/2924
Granted
Western Australia
100%
Thunderbolt
E28/3062
Granted
Western Australia
100%
Thunderbolt
E28/3065
Granted
Western Australia
100%
Thunderbolt
E28/3240
Application
Western Australia
100%
Thunderbolt
E28/3219
Application
Western Australia
100%
Thunderbolt
E28/3220
Application
Western Australia
100%
Thunderbolt
E28/3221
Application
Western Australia
100%
Thunderbolt
E28/3313
Application
Western Australia
100%
Thunderbolt
E28/3344
Application
Western Australia
100%
Thunderclap
E28/2972
Granted
Western Australia
100%
Squall
E28/3155
Granted
Western Australia
100%
Braeside
E45/4873
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/2032
Granted
Western Australia
100%
Warroo
E45/5366
Granted
Western Australia
100%
Warroo
E45/5689
Granted
Western Australia
100%
Warroo
E45/5860
Application
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4063
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Rumble Resources Limited - ASX: RTR
Page | 8
Earaheedy
E69/4138
Application
Western Australia
100%
Earaheedy
E69/4124
Application
Western Australia
100%
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4165
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Western Queen
M59/0045
Granted
Western Australia
100%
Western Queen
M59/0208
Granted
Western Australia
100%
Western Queen
L59/40
Granted
Western Australia
100%
Western Queen
E20/0967
Granted
Western Australia
100%
Western Queen
E59/2443
Application
Western Australia
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4165
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Thunderbolt
E28/3344
Application
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 9
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Thunderclap
E28/2968
Surrendered
Western Australia
100%
Thunderclap
E28/2971
Surrendered
Western Australia
100%
Thunderclap
E28/2973
Surrendered
Western Australia
100%
Surrendered
Western Australia
100%
Surrendered
Western Australia
100%
Thunderclap
Thunderclap
E28/3125
E39/2345
Rumble Joint Ventures - Notes
1. Earaheedy Project, Western Australia
E69/3464 75% RTR / 25% Zenith Minerals
M69/0150 75% RTR / 25% Zenith Minerals
L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
E28/2528, E28/2529, E28/2595, E28/2366 - IGO 70% / RTR 30%
3. Munarra Gully, Western Australia
E51/1677 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
E45/5270, E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited - ASX: RTR
Page | 10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Rumble Resources Limited
ABN
Quarter ended (“current quarter”)
74 148 214 260
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(703)
(2,761)
(e) administration and corporate costs
(407)
(1,434)
1.3
Dividends received (see note 3)
1
3
1.4
Interest received
18
78
1.5
Interest and other costs of finance paid
(2)
(3)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
104
237
1.8
Other (provide details if material)
102
418
1.9
Net cash from / (used in) operating
activities
(887)
(3,462)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(30)
(100)
(c) property, plant and equipment
(19)
(24)
(1,864)
(11,048)
(e) investments
-
-
(f)
-
-
(a) entities
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(1,913)
(11,172)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
905
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
905
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
6,979
17,908
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(887)
(3,462)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,913)
(11,172)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
905
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
4,179
4,179
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
4,131
6,931
5.2
Call deposits
48
48
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,179
6,979
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
142
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
27
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,864)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(2,751)
8.4
Cash and cash equivalents at quarter end (item 4.6)
4,179
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
4,179
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.52
(887)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes, additional capital will be required to be raised.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, the Company is currently reviewing various funding options. It is expected that
the Company will be successful in its future fund-raising activities.
ASX Listing Rules Appendix 5B (17/07/20)
Share your feedback
Discover