Munarra Gully Drilling Returns High-Grade Gold-Copper Result
Released
Released
Announcement PDF
ASX:RTR
Munarra Gully reinterpretation
leads to high-grade drilling success
ASX RELEASE I 20 JULY 2026
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
Drilling at Munarra Gully returns intercept of 5m @ 55.60 g/t gold
Reinterpretation of historical data has revealed large undertested areas along the Amaryllis Shear Zone.
Targeted follow-up drilling in these zones has been highly successful.
Hole MGRC26011 targeted a 300m gap in the previous drilling and returned the following high-grade gold
intersection:
• 13m @ 21.64 g/t Au from 122m
o incl. 5m @ 55.56 g/t Au from 124m
o incl. 1m @ 221.00 g/t Au from 124m
o concurrent with 7m @ 0.52% Cu from 128m
Other holes returned further significant gold and copper results including:
• 7m @ 2.15 g/t Au from 132m
o concurrent with 4m @ 0.62% Cu from 132m
• 7m @ 3.86 g/t Au from 65m
o incl. 1m @ 26.10 g/t Au from 68m
• 1m @ 5.86 g/t Au from 149m
o concurrent with 6m @ 0.39% Cu from 140m
o incl. 1m @ 1.54% Cu from 140m
A diamond and reverse circulation drilling program is now being planned to follow up this successful program.
Peter Harold, Managing Director and CEO commented:
“Munarra Gully has been a bit of a sleeper for us. We always wanted to follow up some of the previous drilling
recognising that the tenement package was still very prospective for gold and copper.
Our exploration team has done an outstanding job to target a highly prospective area and get these bonanza gold
grades of 13 metres at 21.64 grams per tonne of gold including 5 metres at 55.56 grams per tonne and 1 metre of
221 grams per tonne in one of the RC holes. In addition to the gold there is 7 metres of 0.52% copper in that hole.
There were also other holes that intersected both gold and copper so we could be onto something here. More
drilling is planned at Munarra Gully in the not-too-distant future.”
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
2
Drill Program
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to report the results of a reverse
circulation and air core drilling program that was conducted in April and May 2026 at the Munarra Gully Gold Copper
Project (“Munarra Gully” or the “Project”) 50km north-northeast of Cue. The program consisted of 28 air core holes
(1933m) and 12 RC holes (1715m) for a total of 3648m.
Figure 1 – Drill collar locations along the Amaryllis Shear Zone at Munarra Gully
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
3
Amaryllis Reinterpretation
Recent interpretation by Rumble’s geological team revealed that historical drilling along the Amaryllis Shear Zone
was largely ineffective, often failing to reach fresh rock. This had led to unreliable targeting of the Amaryllis Shear
Zone under cover.
This drill program was designed to test the Amaryllis Shear Zone in two ways: by extending below historical holes
that failed to reach the fresh rock boundary and by infilling large untested sections of the known mineralised
structure (see Figure 1).
Supergene dispersion above the shear zone is inconsistent and locally exhibits strong upper saprolite depletion in
gold and other pathfinder elements that can be used to vector towards the shear zone. This reinforces the theory
that many sections remain undertested despite the historical drilling.
Reverse Circulation Drilling
Reverse circulation (RC) drilling was conducted on six sections along the Amaryllis Shear Zone, covering 2km of
the 2.6km of mineralised strike length identified so far, three of which are shown below. All RC drilling occurred on
Rumble’s 100% owned tenement E51/1919.
Figure 2 - Cross Section 1 through Amaryllis - 7,024,750N
Cross Section 1, 7,024,750N occurs in the middle of a 300m gap in effective drilling and returned the highest-grade
intercept at the Munarra Gully Project to date (see Figure 2). This result is the only fresh intercept through the shear
zone on this section.
Hole MGRC26011 intersected:
• 13m @ 21.64 g/t Au from 122m
o incl. 5m @ 55.56 g/t Au from 124m
o incl. 1m @ 221.00 g/t Au from 124m
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
4
Concurrent with the gold was a copper intercept of:
• 7m @ 0.52% Cu from 128m
The intercept was hosted in a sericite altered aphanitic dacite cut with small, stockwork quartz veins mineralised
with pyrite and chalcopyrite.
Hole MGRC26010 intersected the shear zone in the depleted saprolite and still returned:
• 7m @ 0.67 g/t Au from 77m
o incl. 1m @ 2.64 g/t Au from 77m
Figure 3 - Cross Section 2 through Amaryllis - 7,024,120N
Hole MGRC26007 was drilled beneath two historical holes that had intersected mineralisation within the depleted
saprolite zone (refer Figure 3). Immediately below the cover, it successfully encountered a zone of supergene
dispersion followed by strong mineralisation in fresh rock. Results include:
• Supergene: 16m @ 0.54 g/t Au from 40m (4m composites)
• Fresh Rock: 16m @ 1.32 g/t Au from 132m
o incl. 7m @ 2.15 g/t Au from 132m
Copper mineralisation overlapped the gold with an intersection of:
• 10m @ 0.39% Cu from 131m
o incl. 4m @ 0.62% Cu from 132m
o and 9m @ 0.19% Cu from 144m
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
5
Figure 4 - Cross Section 3 through Amaryllis - 7,022,900N
A fence of five holes successfully defined the southern extent of the Amaryllis Shear Zone (Figure 4). Critically,
fresh rock intercepts in holes MGRC26002 and MGRC26003 have identified the orientation of the mineralisation
for future drilling along strike.
Other standout results from the RC drilling program include MGRC26012:
• 14m @ 0.46 g/t Au from 48m
• 7m @ 3.86 g/t Au from 65m
o incl. 1m @ 26.10 g/t Au from 68m
• 13m @ 0.56 g/t Au from 90m
• 5m @ 0.65 g/t Au from 120m
And MGRC26006:
• 6m @ 0.56 g/t Au from 140m
• 1m @ 5.86 g/t Au from 149m
Which also contained significant copper grades of:
• 6m @ 0.39% Cu from 140m
o incl. 1m @ 1.54% Cu from 140m
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
6
Air Core Drilling
The air core drilling program consisted of three lines targeting potentially folded repetitions of the host lithology
interpreted from geophysical (magnetic) data. Two lines were to the west of the Amaryllis Shear Zone on E51/1677
while the third was to the north on E51/1927. No significant mineralisation was intersected in any of the air core
holes.
Next Steps at Munarra Gully
Drilling - Planning is underway for a targeted drilling campaign to build on the success of this program, with a
strong focus on MGRC26011. A diamond twin hole is planned to better determine the orientation of high-grade
veining within the system, whilst follow up RC drilling will focus on stepping out to define the extent of the high-
grade mineralisation.
Mineral Resource Estimate – Following the next phase of drilling Rumble intends to fast track the definition of a
maiden Gold-Copper Mineral Resource at the Amaryllis Prospect.
About Munarra Gully
The Munarra Gully Project consists of three tenements for a combined total area of 123km2. Rumble Resources
owns a 100% interest in two tenements (E51/1919 and E51/1927) and an 80% interest in E51/1677. The project
can be accessed from the Great Northern Highway, approximately 50km north-northeast of the Town of Cue within
the Murchison Goldfields.
Amaryllis is an early-stage prospect with 2600m of mineralised strike length that remains open in all directions. The
project area geology is dominated by dacitic to intermediate extrusive and high-level intrusive rocks of the Archean
Meekatharra Formation. Host rocks are feldspar phyric with mineralisation associated with intensely sheared
(mylonitic) sericite-muscovite-chlorite-silica zones partitioned throughout weakly foliated to massive dacite to
intermediate hosts. These rocks form part of the extensive Meekatharra-Wydgee Greenstone Belt. The regionally
significant Chunderloo Shear Zone crosses the western margin of the project.
Shear zone geometry is sub-vertical with a typical mineralised width of 20-50m and displaying strong continuity
down dip. The mineralisation assemblage is pyrite-chalcopyrite+/-pyrrhotite+/-sphalerite, alteration is carbonate
(ankerite) – epidote – K-feldspar – tourmaline. The generally low magnetic response of the host rocks in the area
has inhibited previous explorers from making detailed magnetic interpretations. The northern portions of the tenure
including much of E51/1927 is covered by transported alluvium and sheet wash material.
The style of mineralisation has characteristics similar to the Chibougamau Au-Cu-Ag shear vein style deposits
located in the eastern part of the Abitibi Greenstone Belt in Quebec, Canada. At Chibougamau, major (later)
shearing has overprinted earlier deformation within an area of high-level porphyries (Au-Mo-Cu) and minor VMS
systems that have intruded into early sediments and mafic intrusive complex rock types.
Previously reported results0F
1 from the Amaryllis Shear Zone include:
• 5m @ 11.67 g/t Au from 161m (AMRC008)
• 2m @ 13.45 g/t Au from 92m (AMRC012)
• 4m @ 6.21 g/t Au from 94m (AMRC006 – 4m composite)
• 4m @ 4.00 g/t Au, 0.15% Cu from 67m (AMRC041)
• 6m @ 2.29 g/t Au from 132m (AMRC051)
• 8m @ 1.94 g/t Au, 0.68% Cu, 9.5 g/t Ag from 142m (AMRC007)
• 8m @ 1.11% Cu, 0.88 g/t Au, 11.8 g/t Ag from 102m (AMRC003)
1
Refer to Rumble ASX releases:
• 18 November 2021 “Munarra Gully Project Exploration Update”
• 23 February 2021 “Drilling Expands Large-Scale Gold-Copper-Silver System”
• 23 April 2020 “Drilling Confirms Large-Scale Gold Copper Silver System”
• 11 February 2020 “Munarra Gully Project Large Scale Copper-Gold System Defined over 7km Strike”
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
7
• 2m @ 6.28 g/t Au, 0.32% Cu from 84m (AMRC016)
o and 10m @ 1.35 g/t Au, 0.62% Cu, 9.5g/t Ag from 108m
• 4.9m @ 0.82 g/t Au, 1.71% Cu, 21.2 g/t Ag from 139m (MHD045)
••
Figure 5 - Geology and structures of the Munarra Gully Project
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
8
Authorisation
This announcement was approved for release by the Board of Rumble Resources.
-END-
For further information please refer to the Company’s website www.rumbleresources.com.au or contact
the Company via email info@rumbleresources.com.au
About Rumble Resources
Rumble Resources is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold-Tungsten Project which is
being developed to deliver near term cash flow from the existing underground resources and resource growth
through future exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has
demonstrated the capabilities of the exploration team to find world class orebodies.
Competent Person Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly
represents information compiled by Mr Simon Davies, who is a Member of the Australian Institute of Geoscientists.
Mr Davies is an employee of Rumble Resources Limited. Mr Davies has sufficient experience relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Davies consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and
resources, production levels and rates, costs, prices, future performance or potential growth of Rumble Resources
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Rumble Resources
Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or
a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the
requirements of Australian securities laws, which may differ from the requirements of United States and other
country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or
incorporated by reference in this document have been, and will be, prepared in accordance with the JORC
classification system of the Australasian Institute of Mining and Metallurgy and Australian Institute of Geoscientists.
Peter Harold
MANAGING DIRECTOR & CEO
Peter Venn
TECHNICAL DIRECTOR
Trevor Hart
CHIEF FINANCIAL OFFICER
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
9
Table 1 – Drill Hole Location, Survey, and Gold Assay Results for Significant Intercepts
Table 2 – Drill Hole Location, Survey, and Copper Assay Results for Significant Intercepts
Previous ASX Announcements – Munarra Gully Project
• 27/02/2018 – Option Agreement to Acquire Munarra Gully Project
• 7/5/2018 – First Order Conductor Identified at Munarra Gully Project
• 28/6/2018 – Drilling Commences at Munarra Gully Targeting Cu-Au
• 30/8/2018 – Significant Copper-Gold Discovery at Munarra Gully
• 18/12/2018 – Drilling Commences at Munarra Gully Copper-Gold Project
• 12/2/2019 – New Copper-Gold Mineralisation Defined at Munarra Gully
• 25/3/2019 – Munarra Gully Project Update, Cleansing Notice & Appendix 3B
• 8/4/2019 – Drilling Commences at Munarra Gully Cu-Au Project
• 11/7/2019 – Cobalt Discovery and Cu-Au Mineralisation at Munarra Gully
• 26/11/2019 – Munarra Gully Project Update Major Structure Hosting Cu-Au-Co Mineralisation Identified
• 11/2/2020 – Munarra Gully Project Large Scale Copper-Gold System Defined over 7km Strike
• 5/3/2020 – Drilling Commenced at Munarra Gully Project Targeting High-Grade Cu-Au Mineralisation
• 23/4/2020 – Drilling Confirms Large-Scale Gold Copper Silver System
• 16/9/2020 – Drilling Commenced at Munarra Gully Project Targeting Large-Scale Au-Cu-Ag Deposits
• 23/2/2021 – Drilling Expands Large-Scale Gold-Copper-Silver System
• 18/11/2021 – Munarra Gully Project Exploration Update
Hole ID E MGA N MGA RL Depth (m) Dip Azi To (m) Width (m) Cu (%)
MGRC26006 616419 7023540 448 170 60 90 140 146 6 0.39
incl. 140 141 1 1.54
MGRC26007 616476 7024118 448 171 60 90 131 141 10 0.39
incl. 132 136 4 0.62
and 144 153 9 0.19
MGRC26011 616452 7024747 445 168 55 90 128 135 7 0.52
MGRC26012 616406 7022988 451 138 60 90 81 103 22 0.21
and 121 125 4 0.31
From (m)
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
10
Section 1 Sampling Techniques and Data
CRITERIA JORC CODE EXPLANATION COMMENTARY
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments,
etc.). These examples should not be taken
as limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Slim line Reverse circulation (SLRC)
sampling – Sampled to 4m interval
composites outside of the potential
mineralised zone. 1m samples intervals
were collected in the mineralised zone.
The potential mineralised zone was
defined at the field geologist’s discretion.
• All SLRC sample weights were targeting
3kg sub-sample from the drill rig. Meter
intervals of spoils were placed on the
ground in rows. Sample intervals scooped
into calico bag.
• Standards, blanks and duplicates inserted
at a total rate of 6%. 3% Standards, 1%
Blanks, 1% duplicates. Additional
standards, blanks and duplicates inserted
where required in the potential mineralised
zone.
• pXRF readings taken with a Vanta M
series device every metre on spoils pile. 3
beams with 15 second run times each.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
• Slim line Reverse Circulation (SLRC)
drilling with a face sampling 102mm
hammer.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Drill spoil placed in piles of 1m intervals.
• SLRC sample recovery and condition were
recorded by the field geologist or field
technician at the time of drilling.
• Sample weights were measured and
recorded by ALS laboratory.
• No analysis of relationship between
sample recovery and grade has been
completed at this time.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
• SLRC drill chips were collected in chip
trays, logged, and photographed. pXRF
completed of drill spoil.
• SLRC drill holes were geologically logged
for the entire drillhole including
mineralisation and country rock.
• The field geologists logging is qualitative.
Logging was completed in OCRIS software
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
11
CRITERIA JORC CODE EXPLANATION COMMENTARY
• The total length and percentage of the
relevant intersections logged.
including fields such as lithology, texture,
alteration, mineralisation, structure,
regolith, weathering and more. Logging is
imported into the database once validation
is complete.
• pXRF data was used to support logging.
• Chip trays are photographed post drilling.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• Sub-sampling from the drill rig was
achieved by scoop sampling
representatively through the spoils pile.
• Wet or dry samples noted at the time of
sampling based on visual estimation and
imported into the database.
• Field duplicates were taken at the same
time as primary sample. Duplicate samples
were treated the same at ALS
Laboratories. Duplicates were inserted at a
higher rate inside the mineralised zones.
• Sample sizes are considered sufficient for
the fine-grained mineralisation being
sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
• Sample preparation by crushing, splitting to
3kg sample if required, and pulverising of
up to 3kg.
• Each metre interval of drill spoil was
analysed by Vanta M Series pXRF, with 3
15 second beams.
• Blanks and standards are analysed at the
beginning of each usage of pXRF and
recorded in the database.
• For Gold (Au) assaying was completed by
50g charge Fire Assay with AA finish (total
digest).
• 34 elements were assayed by 4 acid digest
and ICP-AES finish.
• ALS Laboratories Perth prepared and
assayed the samples.
• Appropriate certified Gold and Copper
standards were industry CRMs from
OREAS which included low-grade and
high-grade along with blanks.
• Blanks and standards were inserted at
regular intervals during sampling at
discretion of the field geologist with
increased insertion in mineralised zones.
Verification
of sampling
and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Verification of significant intersections by
Rumble personnel.
• One SLRC hole twins a previous hole. No
review has yet been completed on data.
• All data and documentation are electronic,
backed up to company SharePoint or
Dropbox.
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
12
CRITERIA JORC CODE EXPLANATION COMMENTARY
• Logging using digital software package
OCRIS. pXRF, survey and other data
entered using excel.
• Complete hole data and assay results sent
to company database administrator to load
into online hosted database.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• SLRC drill-hole collars have been surveyed
using handheld GPS.
• No down-hole surveys completed.
• Data presented in GDA94 zone 50 grid.
Data
spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Data spacing is based on surface handheld
GPS drill hole pick-up.
• Drill hole spacing varies from 50m to
+300m
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Based on logging and known geological
trends the drilling is normal to the
mineralised trend. The dip of the
mineralisation is approximately 75° to the
west.
• Drilling was 55-60° to the east. and is
considered appropriately angled for this
orientation. Drilling orientation is not
considered to have introduced a sampling
bias.
Sample
security
• The measures taken to ensure sample
security.
• All samples are managed and transported
by Rumble personnel from drill site to
laboratory.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No audits completed.
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumblerresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Find us on
13
Section 2 Reporting of Exploration Results
CRITERIA JORC CODE EXPLANATION COMMENTARY
Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• E51/1919 and E51/1927 Granted (100%
Rumble)
• E51/1677 is granted and is a Joint Venture
(Rumble Managing) between Marjorie Ann
Molloy (20%) and Rumble (80%).
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• Current exploration solely completed by
Rumble Resources
Geology • Deposit type, geological setting and style
of mineralisation.
• Au-Cu-Ag mineralisation hosted in felsic to
intermediate volcaniclastics and porphyritic
intrusives. Mineralisation is orogenic gold
shear zone (mesothermal) overprinting
earlier dominant intermediate rocks with
low order VMS mineralisation.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• Table 1 - Drill Hole Location, Survey, and
Gold Assay Results for Significant
Intercepts.
• Table 2 - Drill Hole Location, Survey, and
Copper Assay Results for Significant
Intercepts.
Data
aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting
of metal equivalent values should be
• Weighted averaging (by length) of results
completed for all results.
• Gold Results – Intervals calculated using a
0.2g/t minimum grade cutoff and up to 2m
of contiguous int
Share your feedback