ASX ANNOUNCEMENT
31 October 2025
September 2025 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of the
Company’s activities during the September 2025 Quarter, focusing on discovery and growing the gold and
tungsten resources and generating cash flow from the Western Queen Project, advancing the emerging world
class Earaheedy Zinc-Lead-Silver Project and progressing the other exploration projects in the portfolio.
Highlights for the Quarter include:
WESTERN QUEEN GOLD-TUNGSTEN PROJECT
1. Major diamond drilling campaign commenced at Western Queen Gold-Tungsten Project
• Up to 20,000m of diamond drilling program has commenced primarily targeting high-grade down
plunge gold extensions to the Western Queen South and Western Queen Central deposits
• The drilling is being undertaken by DDH1 Drilling, who is supplying two diamond rigs for the program
• The drill program aims to grow the Western Queen gold Mineral Resource Estimate (MRE) of 3.72Mt @
3.1g/t Au for a total of 370,000 oz Au1
• This drilling will also infill the existing Western Queen South MRE of 2.32Mt @ 2.66g/t Au for 198,900
oz1
with the aim of reclassifying a significant portion of the Inferred Resources to the Indicated category
• This drilling has also been designed to grow and upgrade the recently announced maiden Western
Queen Tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2kt WO3
2
2. Maiden Tungsten Resource at Western Queen Project
• Western Queen Tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2kt WO3 at a 0.1% WO3 cutoff announced
• Open and continuous high-grade cores within the global mineral resource estimate total 1.44Mt @
0.51% WO3 for 7.4kt WO3 at a 0.3% WO3 cutoff
• Tungsten skarn mineralisation occurs as a series of lodes subparallel to the recently upgraded high-
grade gold resource (3.72Mt @ 3.1g/t Au for 370,000oz at Western Queen and has been identified
over a 1500m strike between the Western Queen South and Central open pits
• Tungsten mineralisation remains open along strike and at depth within the granted Western Queen
mining leases
• Preliminary metallurgical testwork has indicated that a meaningful revenue stream could potentially be
generated from the tungsten bearing material
1
Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au”
2
Refer to Rumble ASX release 11 August 2025 “Maiden Tungsten Resource at Western Queen Project”.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 2
• The majority of the maiden tungsten MRE is situated at the Western Queen South deposit
• Recent geological interpretation has identified multiple additional high priority target areas
prospective for tungsten endoskarn type mineralisation across the broader Western Queen Project,
with a reconnaissance field program underway
3. Mine Development
• Potential mine development
o Underground mining project demonstrates superior economics over the open pit project
o Underground mining scoping study well advanced
• Third party ore processing
o Non-binding MoU signed with Gylden Resources to potentially process Western Queen ore through
Gylden’s Kirkalocka
o A draft toll treating agreement has been received from Gylden
• Permitting
o The Mining Proposal, Mine Closure Plan, Ground Works Approval and other ancillary permits
required for the open pit mine development have been submitted
• Additional gold royalty
o The Company continues to explore the opportunity to increase the gold royalty for an upfront cash
payment
EARAHEEDY ZINC-LEAD-SILVER PROJECT
The Company is close to completing an internal scoping study on the Earaheedy Zn-Pb-Ag Project study, which
aims to provide the Company with an order of magnitude estimation of the potential project economics of the
Earaheedy mineral resource at a range of commodity prices
The study will be completed during Q4 CY2025 and will assist the Company and its Joint Venture partner, Zenith
Minerals Ltd, to determine the best path forward for the Earaheedy Project
CORPORATE
The Company recently raised approximately $9 million (before costs) via a combination of a well-supported two-
tranche placement and an oversubscribed 1 for 12 entitlement offer.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 3
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals (refer to Figure 1).
Figure 1 – Location of Company’s Projects
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 4
Western Queen Gold -Tungsten Project, Mt Magnet, Western Australia
The Western Queen Project is located within a 200km radius of five gold processing plants (refer to Figure 2).
These include Kirkalocka which has a capacity of 2Mtpa, Dalgaranga 2.5Mtpa capacity, Checkers with a current
capacity of 1.9Mtpa, Tuckabianna 1.2Mtpa capacity and Golden Range 0.8Mtpa capacity.
Figure 2 - Western Queen mining leases location and proximity to existing mills
Western Queen Exploration
The Company recently commenced a major diamond drilling program at Western Queen of up to 20,000m of
NQ/HQ core drilling. The first rig arrived on site in early October and the second rig is due early November. The
program is estimated to be completed during Q1 CY26.
• Objectives of the drilling
1. Discover more Gold Resources - The key focus of the drill program is to target high-grade, down plunge
extensions to the Western Queen South and Central deposits (refer to Figure 3) to grow the Western
Queen gold Mineral Resource Estimate (MRE) of 3.72Mt @ 3.1g/t Au for a total of 370,000 oz Au.
2. Upgrade Inferred to Indicated Resources - A small portion of the program will infill the existing Western
Queen South MRE (refer to Figure 4) which currently stands at 2.32Mt @ 2.66g/t Au for 198,900 oz.
The aim is to convert existing Inferred to Indicated Resources ahead of the commencement of mining
operations, subject to permitting, ore sale or an ore toll milling agreement and all other necessary
conditions required for a Financial Investment Decision.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 5
Figure 3 –Long Section showing drill target areas below Western Queen South and Central Deposits
Figure 4 – Western Queen South longitudinal section showing gram x metre contours, select drill hole
intersections and proposed extensional drilling (red circles, below the current MRE) and proposed infill
resource conversion drilling (blue circles)
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 6
3. Discover more Tungsten Resources – Drilling to discover more high-grade tungsten lodes, which are
spatially adjacent, and sub-parallel to, the high-grade gold lodes with the aim of growing the recently
announced maiden Western Queen tungsten MRE. The drill program will also further assist in
developing the understanding of the controls and timing of the tungsten mineralisation at Western
Queen and provide critical information that can be applied to the targeting of the tungsten potential at
a local and district scale.
4. Geotechnical review - Two holes will be drilled to understand the geotechnical conditions in the area
where the underground portal and decline is proposed.
5. Metallurgy - Selected diamond holes will be used to provide samples for a metallurgical testwork
program across both the Western Queen South and Central deposits to further validate the previously
achieved high gold recoveries of +93% from prior mining by Equigold, Harmony and Ramelius.
The drill program should provide the basis for a revised Western Queen MRE in early 2026.
During the quarter a maiden tungsten MRE was announced at the Western Queen Project. The MRE is 4.31Mt
@ 0.31% WO3 for 13.2Kt WO3 at a 0.1% WO3 cut-off and contains a higher-grade portion of 1.44Mt @ 0.51%
WO3 for 7.4Kt WO3 at 0.3% WO3 cut off (refer to Figure 5). The MRE is classified as Inferred Resources and is
reported in accordance with the Australasian Code of Reporting of Identified Mineral Resources and Ore Reserves
(JORC Code 2012), and all the resources are located within granted Mining Leases M59/208 and M59/45.
Figure 5 – Maiden Western Queen Tungsten MRE showing extents of WO3 lodes and diagrammatic contoured block
grades displaying emerging high-grade trends and select significant WO3 intercepts
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 7
Potential Mine Development
Mining Studies
• Western Queen Open Pit Option
During the quarter, MEGA Resources Pty Ltd (MEGA) updated the mining schedule for the Western Queen South
open pit taking into consideration the 23 July 2025 MRE upgrade. The revised schedule showed production over
a two-year period from a combination of Western Queen South, Princess and Cranes.
The revised schedule resulted in a working capital investment by Bain Global Resources (Bain) in excess of the
$35 million ($25 million working capital facility and up to $10 million cost overrun facility) referred to in the 28
November 2024 Term Sheet3
(Term Sheet).
MEGA subsequently prepared a smaller Western Queen South open pit option. This option could allow for open
pit mining ahead of, or in conjunction with underground mining.
• Western Queen South and Central Underground Option
In light of the much higher working capital requirement for the larger open pit project, Rumble initiated a “proof
of concept” underground mining study. The outcome of this initial internal study indicated that the underground
mining project had superior economics to the various open pit options presented by MEGA and consequently
the Company has decided to pursue the underground mine development as the preferred option.
• Western Queen South and Central Underground Option – Scoping Study
A Scoping Study on mining both Western Queen South and Central from underground was commenced during
the quarter and is on track to be delivered during the December 2025 quarter.
Third Party Processing
Discussions continued with the owners of the various gold processing plants in the vicinity of Western Queen.
These companies were provided with the updated open pit mining schedule (May 2025) and the preliminary
underground mining study (August 2025).
On the 22 October 2025, the Company announced the signing of a non-binding Memorandum of Understanding
with Gylden Resources Pty Ltd, in relation to the potential to treat Western Queen ore through their Kirkalocka
plant. Gylden has also provided a draft ore tolling agreement which is currently being reviewed.
Permitting
During the quarter the Mining Proposal, Mine Closure Plan, Works Approval and ancillary permits required for
the open pit mine development were submitted by MEGA Resources on behalf of Rumble. The Company is
reviewing what minor amendments to the permitting process are likely to be required for the preferred
underground mine development option.
Bain/MEGA Co-operation Agreement
The Term Sheet signed with Bain and MEGA expired on 30 September 2025.
3
Rumble ASX release date 28 November 2024
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 8
Additional Gold Royalty
The existing gold royalty applicable to any future gold production from Western Queen is a very modest A$6-20
per ounce of gold mined. Consequently, there is an opportunity for Rumble to sell an additional gold royalty of
1-2% Net Smelter Return (NSR) for an upfront payment. This strategy would provide Rumble with working capital
whilst having only a minor impact on the future cashflow from the gold project. The Company is continuing to
pursue this avenue to raise funds for the Western Queen development.
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
During the Quarter, the Company continued with the work on the internal scoping study on the Earaheedy Zn-
Pb-Ag Project.
The study aims to provide the Company with an order of magnitude estimation of the potential project
economics of the Earaheedy mineral resource at a range of commodity prices. The following consultants were
engaged to work on the study:
• MACA Interquip Mintrex
• Auralia Mining Consultants
• SRK Consulting
• MBS Environmental
• Peter O’Bryan and Associates
The study will be completed during Q4 CY2025 and will assist the Company and its Joint Venture partner, Zenith
Minerals Ltd, to determine the best path forward for the Earaheedy Project.
Other Gold, Base Metal & Lithium Projects, Western Australia
Warda Warra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
• No significant exploration activities occurred at Warda Warra during the quarter.
Munarra Gully Gold-Copper-Silver Project, Western Australia
• No significant exploration activities occurred at Munarra Gully during the quarter.
Braeside Base Metal Project, East Pilbara, Western Australia
• No significant exploration activities occurred at Braeside during the quarter.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
• No significant exploration activities occurred at Warroo during the quarter.
Lamil Copper-Gold and Base Metal Project, Patterson Province, Western Australia
• A moving-loop electromagnetic (MLEM) survey was completed by GEM Geophysics in September 2025 at
Lamil with is approximately 20km SW of the Telfer Gold Mine. The survey was planned to traverse a
prospective 300° trending structure with the aim of detecting bedrock conductors indicative of copper
sulphide mineralisation. Unfortunately, no discrete anomalies were detected.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 9
CORPORATE
Board Updates
Mr Geoff Jones was appointed Non-Executive Chairman effective 14 October 2025. Geoff joined the Rumble
board as a non-executive director in June 2022 and has an excellent working knowledge of the Company’s assets
and the corporate strategy.
Capital Raising
During the quarter the Company announced a $9 million capital raising comprising a two-tranche placement to
raise $7.0 million and an one for 12 Entitlement Offer to raise a further $1.9 million.
On 1 October the Company announced the completion of the Entitlement Offer advising a total of over $3.8
million was received, of which $1,839,177 was scaled back in accordance with the policy detailed in the Offer
Document.
Following the General Meeting of the Company held on the 24 October 2025 the Company announced the
completion of the capital raising (refer ASX release 9 September 2025) with the issue of the Tranche 2 Placement
shares on the 29 October 2025.
Annual General Meeting
As announced on the 6 October 2025, the Company’s Annual General Meeting (AGM) will be held on the on
Friday, 28 November 2025.
Cash and Investments
• As at 30 September, Rumble held approximately $5 million in cash.
• Subsequent to the end of the quarter the Company received funds from the Entitlement Offer and the
Tranche 2 Placement totally approximately $4 million (before costs).
Appendix 5B – Quarterly Cashflow
• The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information
as disclosed in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $684K.
• Cash outflows for the September 2025 Quarter totalled $1.55 million across exploration activity (44%),
staff costs (36%), administration and corporate costs (20%).
• Cash inflows for the September 2025 Quarter totalled $4.6k consisting of proceeds from interest
received.
Appendix 5B – Payments to related parties and their associates
• Payments to related parties and their associates totalled $292k for the Quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, and
superannuation payments.
Tenement Holdings
• In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorisation
Authorised for release by the Board of the Company.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 10
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
LinkedIn: https://www.linkedin.com/company/rumble-resources-ltd
X: https://twitter.com/RumbleResources
About Rumble
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing
the major Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced
drilling has rapidly uncovered an emerging world class scale base metal system, with interpretative geology and drilling
continuing to make new discoveries and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1
regions of Western Australia. While the Company is undertaking metallurgical studies and internal scoping studies on
Earaheedy exploration activities have been focused on Western Queen where an opportunity exists to grow the gold
resources and potentially fast track the project into production.
Rumble’s board and management team has a successful track record in making discoveries and project development.
Competent Persons Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects is based on
and fairly represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of
Geoscientists. Mr Timmermans is a full-time employee of Rumble Resources Limited, Mr Timmermans has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported resources and exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference appears.
The previous market announcements are available to view on the Company's website or on the ASX website (www.
asx.com.au). The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 11
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining
tenements.
1. The mining tenements held at the end of the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Braeside E45/2032 Granted Western Australia 100%
Braeside E45/4368 Granted Western Australia 100%
Braeside E45/4874 Granted Western Australia 100%
Buningonia E28/3500 Application Western Australia 100%
Earaheedy E69/3464 Granted Western Australia 75% Note 1
Earaheedy E69/3787 Granted Western Australia 100%
Earaheedy E69/3815 Granted Western Australia 100%
Earaheedy E69/3862 Granted Western Australia 100%
Earaheedy E69/4062 Application Western Australia 100%
Earaheedy E69/4099 Application Western Australia 100%
Earaheedy E69/4257 Application Western Australia 100%
Earaheedy L69/0058 Application Western Australia 75% Note 1
Earaheedy M69/0150 Application Western Australia 75% Note 1
Hardey E08/3841 Application Western Australia 100%
Lamil E45/5271 Granted Western Australia 50%Note 4
Munarra Gully E51/1677 Granted Western Australia 80% Note 3
Munarra Gully E51/1919 Granted Western Australia 100%
Munarra Gully E51/1927 Granted Western Australia 100%
Saltbush E45/6975 Application Western Australia 100%
Saltbush E46/1604 Application Western Australia 100%
Saltbush E46/1614 Application Western Australia 100%
Thunderbolt E28/3219 Granted Western Australia 100%
Thunderbolt E28/3240 Granted Western Australia 100%
Thunderbolt E28/3384 Application Western Australia 100%
Thunderstorm E28/2528 Granted Western Australia 30%Note 2
Thunderstorm E28/2529 Granted Western Australia 30%Note 2
Thunderstorm E28/2595 Granted Western Australia 30%Note 2
Warroo E45/5366 Granted Western Australia 100%
Warroo E45/5689 Granted Western Australia 100%
Western Queen E20/967 Granted Western Australia 100%
Western Queen E59/2816 Application Western Australia 100%
Western Queen E59/3021 Application Western Australia 100%
Western Queen L59/40 Granted Western Australia 100%
Western Queen M59/45 Granted Western Australia 100%
Western Queen M59/208 Granted Western Australia 100%
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 12
2. Mining tenements acquired during the quarter and their location:
• No tenements were granted
• No tenements were acquired
• 4 applications were made and are pending
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Saltbush E46/1604 Application Western Australia 100%
Saltbush E46/1614 Application Western Australia 100%
Warramboo E59/3021 Granted Western Australia 100%
Hardey E08/3841 Granted Western Australia 100%
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Western Queen E59/2926 Application Western Australia 100%
Warramboo E59/2943 Application Western Australia 100%
Earaheedy E52/3879 Granted Western Australia 100%
Earaheedy E52/3842 Granted Western Australia 100%
RUMBLE JOINT VENTURES - NOTES
1. Earaheedy Project, Western Australia
• E69/3464 75% RTR / 25% Zenith Minerals
• M69/0150 75% RTR / 25% Zenith Minerals
• L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
• E28/2528, E28/2529, E28/2595, - IGO 70% / RTR 30% - Refer ASX release 7 April 2025 “Rumble acquires
100% of the Thunderstorm Gold Project”
3. Munarra Gully, Western Australia
• E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
• E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 13
Appendix 2
Table 1 – Mineral Resource Estimate Tabulation for the Western Queen Project broken down by Resource Area
and split of Indicated and Inferred Resources for reported Open Pit and Underground economic cut-offs.
Indicated Inferred Total
Prospect Tonnage Au Au Tonnage Au Au Tonnage Au Au
kt g/t Oz kt g/t Oz kt g/t Oz
Cranes 70 1.4 3,300 70 1.4 3,300
Duke 30 7.2 6,900 4 6.4 800 34 7.1 7,700
WQC 250 7.2 56,600 560 3.8 67,300 800 4.8 124,000
Princess 100 1.9 5,900 380 2.5 30,300 480 2.3 36,200
WQS 830 3.0 78,600 1,490 2.5 120,200 2,320 2.7 198,900
Total 1,210 3.8 148,000 2,510 2.8 222,000 3,720 3.1 370,000
Notes: Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of
Ashmore Advisory and a Member of the AIG. Mr. Searle has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify as a
Competent Person as defined in the JORC Code (2012).
All Mineral Resources figures reported in the table above represent estimates as at July 2025. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the
location, shape and continuity of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Cranes Mineral Resource figures are derived from the 2024 Mineral Resource estimate.
Open Pit optimisations and preliminary underground Mining Shape Optimisations (MSO) have shown that a large
proportion of the resource has the potential to be mined economically, and further mining studies are warranted
to further progress the project. Mineral Resources that are not Ore Reserves have not demonstrated economic
viability at this point. The estimate of Mineral Resources may be materially affected by environmental,
permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
Table 2 - Inferred Mineral Resource tabulation for the Earaheedy Project.
Cut off Inferred – Chinook Inferred – Tonka and Navajoh Inferred Total
Zn+Pb Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag
% Mt % % % g/t Mt % % % g/t Mt % % % g/t
0.5 334 1.3 0.9 0.4 2.3 128 1.5 1.2 0.2 1.9 462 1.3 1.0 0.3 2.2
1.0 135 2.1 1.5 0.6 3.4 59 2.3 2.0 0.4 2.6 194 2.2 1.6 0.5 3.1
2.0 63 3.0 2.1 0.8 4.6 31 3.3 2.8 0.5 3.4 94 3.1 2.4 0.7 4.2
2.5 39 3.4 2.4 0.9 5.2 25 3.5 3.0 0.5 3.6 65 3.4 2.6 0.8 4.5
3.0 24 3.8 2.7 1.1 5.7 17 3.9 3.3 0.6 3.8 41 3.8 3.0 0.9 4.9
4.0 7 4.7 3.3 1.5 6.8 5 4.9 4.1 0.8 4.3 12 4.8 3.6 1.2 5.7
Footnote: Inferred Mineral Resource is constrained within optimised pit shells and tabulated above at different economic Zn+Pb%
cutoffs.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Rumble Resources Limited
ABN Quarter ended (“current quarter”)
74 148 214 260 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
-
1.1 Receipts from customers
1.2 Payments for
-
(a) exploration & evaluation -
(b) development - -
(c) production - -
(d) staff costs (553) (553)
(e) administration and corporate costs (314) (314)
1.3 Dividends received (see note 3) - -
1.4 Interest received 5 5
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(862) (862)
2. Cash flows from investing activities
-
2.1 Payments to acquire or for:
(a) entities -
(b) tenements (283) (283)
(c) property, plant and equipment - -
(d) exploration & evaluation (401) (401)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
-
(a) entities -
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current asset