Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 April 2025
March 2025 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of the Company’s
activities during the March 2025 Quarter, focusing on discovery and growing the gold resources at the Western
Queen Project, generating cash flow from the existing gold resources at Western Queen, advancing the emerging
world class Earaheedy Zinc-Lead-Silver Project and progressing the other exploration projects in the portfolio.
Highlights for the Quarter include:
WESTERN QUEEN PROJECT
1. Pathway to near term gold production – targeting late 2025
•
•
Term Sheet - Rumble has entered into a Term Sheet with Bain Global Resources (Bain) and MEGA
Resources (MEGA) to mine the open pit resources at Western Queen. Keys terms are:
o
Open Pits – the plan is to mine Western Queen South and potentially some of the small pits (Duke
and Princess)
o
Mining Services - MEGA will provide the open pit mining services
o
Funding – Bain will pay all costs up to a maximum of $25 million in development and working capital
(with a further $10 million cost overrun facility available), no investment required by Rumble.
o
Share cash flow - Rumble and Bain will share the free cashflow from the Western Queen open pits
after the initial development costs are recovered
Progress towards production:
o
Mine plan – a preliminary mining schedule has been prepared and a revised schedule is being
finalised
o
Ore sales - discussions ongoing with companies who operate gold processing plants proximal to
Western Queen
o
Mining Equipment - Bain/MEGA have purchased all the major pieces of mobile equipment for this
project, with arrival in Australia scheduled for mid-year
o
Permitting & Approvals - MEGA are managing the entire permitting and approval process and are
well advanced with all aspects of the project development
o
Definitive Agreements - the parties are currently negotiating the various agreements with the target
of signing these agreements by no later than 30 May 2025
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
1
2. Gold-tungsten discovery drilling – more high-grade gold and tungsten hits
Reverse Circulation drilling at the Duke Prospect just north of the Western Queen Central open pit returned best
gold intercepts of:
•
4m @ 6.27g/t Au from 77m (WQRC234)
o
•
including 1m @ 23.03g/t Au from 77m
3m @ 6.82g/t Au from 75m (WQRC224)
o
including 1m @ 18.61g/t Au from 76m
Initial sampling of the 78 historical diamond holes has returned multiple, highly significant high-grade tungsten
assay intersections. The best of these are:
•
11.5m @ 1.46% WO3 & 0.79g/t Au from 248.55m (MXDD003)
o
•
3.1m @ 1.13% WO3 & 0.61g/t Au from 239.95m (MXDD003)
o
•
including 0.3m @ 10.11% W03 from 239.95m
16m @ 0.50% WO3 & 2.22g/t Au from 148m (QND-38975-1)
o
•
including 0.55m @ 24.97% W03 & 0.11g/t Au from 248.55m
including 4.3m @ 0.88% WO3 & 1.74g/t Au from 154.8m (QND-38975-1)
11m @ 0.93% WO3 and 4.19g/t Au from 169m (WQSDD002)
o
including 1m @ 2.49% WO3 and 0.41g/t Au from 172m
3. Tungsten Metallurgy Testwork
A preliminary metallurgical testwork program has commenced following the collection of 500kg of scheelite
bearing material from mining bunds and waste dumps at Western Queen South late last quarter. Following
sample preparation and ore characterisation, mineralogical, whole ore gravity and ore sorting studies will be
performed.
EARAHEEDY ZN-PB-AG-CU PROJECT
During the Quarter, the Company commenced an internal scoping study on the Earaheedy Zn-Pb-Ag Project. This
study will provide the Company with an order of magnitude estimation of the potential project economics of
Earaheedy. This study is anticipated to be completed by Q3 2025.
THUNDERSTORM PROJECT
During the Quarter, the Company entered into an agreement to acquire the outstanding 70% interest in three
exploration tenements in the Fraser Range Province from joint venture partner IGO Limited to secure 100% of
the highly prospective Thunderstorm Gold Project.
Previous AC drilling between 2018-2020 completed by IGO over an area of approximately 40km by 20km on
1,500m line spacings, returned widespread gold anomalism within an extensive Eocene palaeodrainage system
with probable nearby potential basement gold sources.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
2
Better AC results from the Gazelle Gold Prospect include:
•
16m @ 6.69 g/t Au from 42m (20AFAC11321)
o
•
including 4m @ 22.2 g/t Au from 50m
6m @ 9.15 g/t Au from 48m (18AFAC30771)
CORPORATE
Cash Balance
•
Company had $4.1 million in cash at the end of the Quarter
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
3
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals.
Figure 1 - Location of the Company’s Projects
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
4
Western Queen Gold-Tungsten Project, Mt Magnet, Western Australia
Figure 1 - Western Queen mining licences and proximity to existing mills
Pathway to Production – together with Bain Global Resources and MEGA Resources
In line with the Company’s stated corporate strategy to generate early cashflow from Western Queen, in
November 2024 Rumble entered into an Indicative Non-Binding Term Sheet (Term Sheet) 1 with the Australian
entities of the large Indian mining contractor, BGR Mining & Infra Limited (BGR) to mine the open pit resources at
Western Queen. BGR are a large scale, Indian mine developer and operator with a current order book of
+US$10billion (see https://www.bgrmining.com ).
The Term Sheet is between Rumble and BGR’s Australian entities, Bain Global Resources Pty Ltd (Bain) and MEGA
Resources Pty Ltd (MEGA) and contemplates the formation of a joint venture between Rumble and Bain for the
development of the Western Queen Gold Project. The parties propose to undertake development by cutting back
and deepening the existing Western Queen South open pit (JORC Resource of ~1.42Mt @ 1.59 g/t for ~72.5koz
gold) 2 (refer Appendix 2) and some of the smaller open pits (i.e. Duke and Princess). The joint venture and
development proposal remains subject to executing the required binding definitive agreements, preparation of a
detailed mining plan and financial model, securing an ore tolling/ore sale agreement with a local gold process
plant, obtaining all the necessary approvals for mining and making the Final Investment Decision.
1
Refer to Rumble ASX release 28 November 2024 “Development of Western Queen Gold Project”
2
Refer to Rumble ASX release 15 October 2024 “Western Queen Resources increased 76% to 287koz at 2.02g/t”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
5
Key terms of the Term Sheet are as follows:
•
Joint Venture – Rumble and Bain propose to enter into a Joint Venture (JV) for the development and
operation of the Western Queen Gold Project (limited to the existing MRE that can be mined by open
pit methods) (Project). Bain will pay all costs up to a maximum of $25 million for development and
working capital (repayable from any future revenue generated from the Project). Rumble will not be
required to contribute funds below this $25 million threshold. Bain will also provide a Cost Overrun
Facility for an additional $10 million on commercial terms, if required.
•
Mining Services – MEGA (via a standalone Mining Services Agreement) will provide the open pit mining
services to the JV (at prevailing market rates).
•
Sharing of free cashflow – once the initial development costs, working capital and ongoing mining costs
outlaid by Bain has been recouped in full, all remaining free cashflow from the Project will be shared
between Bain and Rumble.
•
Other terms – other standard terms for an agreement of this nature including representations and
warranties, termination rights, etc.
Western Queen is located within a 100km radius of three gold processing plants (see Figure 2). The closest plant
is Dalgaranga (48km by road from Western Queen) which has a capacity of 2.5 Mtpa (currently on care and
maintenance). The Checkers plant (Mt Magnet) has a capacity of 1.9 Mtpa and the Tuckabianna plant has a
capacity of 1.2 Mtpa. These two facilities could provide the possibility for a near-term toll treating option.
Progress to date
Development activities are well underway with first ore on track to be mined before the end of this calendar
year. Solid progress has been made in the following areas:
•
Definitive Agreements - the Term Sheet contemplated a joint venture between Rumble and Bain. A joint
venture has been determined by both parties and their advisors to be a sub-optimal structure and the
parties have agreed to restructure the arrangement under three separate agreements:
o
Co-operation Agreement
o
Primary Facility Agreement (covering the working capital of up to $35 million)
o
Specific Security Deed
These agreements have all been drafted and the parties are in the process of agreeing to the final wording. This
process has taken longer than anticipated and therefore the parties have mutually agreed to extend the CPs to
execute these agreements until 30 May 2025, which should be sufficient time.
•
Ore tolling/ore purchase – discussions are underway with companies who operate gold processing
plants proximal to Western Queen
•
Mine scheduling – MEGA has prepared a preliminary mine schedule which has been shared with Rumble
to allow a preliminary economic model to be prepared. This schedule has also been shared with the
potential processors of the ore. A revised schedule is currently being prepared.
•
Permitting & Approvals – MEGA are managing the entire permitting and approval process and are well
advanced with all aspects of the project development
•
Equipment – Bain/MEGA have purchased all the major pieces of mobile equipment for this project, with
arrival in Australia scheduled for mid-year. The mobile equipment purchased by Bain/MEGA for this
project includes:
o
EX1200 brand new excavators
o
10 x Cat 777 brand new haul trucks
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
6
o
2 x Cat D10 dozers
o
1 x 16M Grader
One of the Cat D 10 Dozers acquired by Bain/MEGA for the Western Queen Project
Western Queen Drilling Program – Phase 2
Duke Gold Deposit
During the Quarter, 20 reverse circulation (RC) holes were completed at Duke for a total of 1,880m as part of the
Phase 2 drill program at Western Queen. A roughly 40m by 40m drill program was completed prospect area
ahead of planned open pit mining activities. The best assay intercepts returned to date include:
•
4m @ 6.27g/t Au from 77m (WQRC234)
o
•
3m @ 6.82g/t Au from 75m (WQRC224)
o
•
including 1m @ 23.03g/t Au from 77m
including 1m @ 18.61g/t Au from 76m
1m @ 4.53g/t Au from 42m (WQRC239)
The Duke mineralised position was intersected in all RC holes and is characterised by a zone of silicification,
quartz veining and pyrrhotite-tremolite alteration. Late-stage quartz-mica pegmatites crosscut throughout the
Duke area, and frequently intrude sub-parallel to, and within the mineralised lode position. Despite this,
mineralisation remains open at depth and down plunge.
Notably, an intercept in WQRC234 of 4m @ 6.27g/t Au from 77m represents a possible fourth high-grade lode
within the Duke Prospect (refer to Figure 3).
Following this drilling campaign the Company plans to complete a revision of the geological resource model at
Duke as part of a future gold Mineral Resource Estimate update.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
7
Figure 3 – Duke long section highlighting interpreted lodes
Western Queen and Princess diamond drilling
During the Quarter, the Phase 2 diamond drilling at Western Queen South (WQS) and Princess commenced and
was completed mid-April. A total of five holes were completed at WQS, with four holes targeting extensions to
the main high-grade southerly plunge and one hole targeting the sub-parallel interpreted lode beneath the main
WQS lode.
Visually, the first four holes completed at WQS intersected the mineralised position with moderate to intense
silicification, quartz veining and pyrrhotite-pyrite alteration. Additionally, three holes were completed at Princess
targeting a newly recognised lode reported in the Phase 1 RC drilling program 3. Visually, all three holes at Princess
have intersected the interpreted lode position with moderate quartz veining, silicification and pyrrhotite
alteration observed.
Several holes at both WQS and Princess have also intersected intervals of scheelite alteration of varying
intensities. All intervals of visible scheelite alteration and the expected gold mineralisation have been sampled
and all, but the final two drill holes have been delivered to the laboratory. Assay results will be reported during
the June quarter.
3
Refer to Rumble ASX release 17 February 2025 “High-grade gold and tungsten assays returned from Phase 1 drilling at Western Queen”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
8
Western Queen Tungsten
During the Quarter, the Company commenced tungsten sampling of the historical Western Queen diamond core.
In total, there are 78 historical diamond holes (totalling 7,823m) drilled at Western Queen by previous operators,
none of which have pXRF data and only very few have scarce laboratory assays for tungsten. Pleasingly, initial
sampling has returned multiple, highly significant high-grade tungsten assay intersections including:
•
11.5m @ 1.46% WO3 & 0.79g/t Au from 248.55m (MXDD003) 4
o
•
3.1m @ 1.13% WO3 & 0.61g/t Au from 239.95m (MXDD003)
o
•
including 0.3m @ 10.11% W03 from 239.95m
16m @ 0.50% WO3 & 2.22g/t Au from 148m (QND-38975-1)
o
•
including 0.55m @ 24.97% W03 & 0.11g/t Au from 248.55m
including 4.3m @ 0.88% WO3 & 1.74g/t Au from 154.8m (QND-38975-1)
11m @ 0.93% WO3 and 4.19g/t Au from 169m (WQSDD002)
o
including 1m @ 2.49% WO3 and 0.41g/t Au from 172m (see Figure 4)
•
0.6m @ 0.75% WO3 from 120.4m (WQSDD002)
•
0.6m @ 0.73% WO3 and 0.85g/t Au from 146.6m (WQSDD002)
Figure 4 – WQSDD002 from 172-173m grading 2.49% WO3 under UV light
The significant assay intersections received from the initial historical core sampling complement the previously
reported tungsten mineralisation within drillhole WQDD013 (refer to ASX announcement “High-grade Tungsten
Discovery at Western Queen” 6 August 2024) which returned a spectacular intersection of:
•
4
4.05m @ 4.58% WO3, 0.72 g/t Au from 174.85m
Refer to Rumble ASX release 16 April 2025 “Western Queen Mine Development and Exploration Update”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
9
o
including 2.05m @ 8.71% WO3; and 1.38 g/t Au from 176.85m;
including 0.65m @ 18.35% WO3, 2.97 g/t Au from 176.85m (see Figure 5).
and previously reported pulp assay intersections (refer to ASX announcement “Tungsten Discovery at Western
Queen Confirmed” 2 September 2024) including:
•
12m @ 0.56% WO3 and 0.46g/t Au from 69m in WQRC032;
o
•
including 2m @ 2.48% WO3 and 0.12g/t Au from 70m and 3m @ 0.69% WO3 from 90m
2m @ 1.55% WO3 from 159m in WQRC101.
Figure 5 - WQDD013 (0.65m @ 18.35 WO3) scheelite intersection under UV light
The Company is systematically reviewing every historic hole, completing pXRF analysis and sampling any
anomalous intervals containing visible scheelite under ultraviolet light. To date, the Company has checked 41
holes, with 28 being sampled (totalling 828 samples) for laboratory analysis for tungsten (via fusion XRF analysis).
The Company plans to complete the historical core sampling concurrently with the Phase 2 diamond drilling,
targeting both gold and tungsten, upon which time it will review the spatial data density of tungsten assays and
undertake a maiden JORC compliant Mineral Resource Estimate for tungsten.
Tungsten mineralisation at Western Queen remains open in all directions, with Western Queen South emerging
as a primary target area for tungsten mineralisation. During the Quarter, the Company also initiated a technical
study on the mineralisation styles and timing of the tungsten mineralisation, together with a preliminary
metallurgical testwork program using 500kg of scheelite bearing material collected from mining bunds and waste
dumps at Western Queen South.
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
During the Quarter, the Company commenced an internal scoping study on the Earaheedy Zn-Pb-Ag Project. This
study will provide the Company with an order of magnitude estimation of the potential project economics of the
Earaheedy mineral resource including the examination of a range of options and studies that will assist in
delivering in-pit designs, plant flowsheet and other infrastructure inputs for engineering design. A number of
independent consultants have been engaged including MACA Interquip Mintrex, Auralia Mining Consultants, SRK
Consulting, MBS Environmental, Peter O’Bryan and Associates.
It is anticipated that this study will be completed during Q3 of 2025, with the results informing the Company of
the best path forward for the Earaheedy Project.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
10
Thunderstorm Gold Project
During the Quarter, the Company entered into an agreement to acquire the outstanding 70% interest in three
exploration tenements in the Fraser Range Province from joint venture partner IGO Limited (IGO) to secure
100% of the highly prospective Thunderstorm Gold Project 5. The acquisition terms are as follows:
•
Purchase price of $300,000 to be paid in Rumble fully paid shares (“Consideration Shares”) at a deemed
issue price of the 5-day VWAP immediately prior to the Execution Date. The Consideration Shares will
be issued at completion of the acquisition, without Rumble shareholder approval using Rumble’s existing
placement capacity available under ASX Listing Rule 7.1.
•
1.05% Net Smelter Return (NSR) royalty over E28/2528, E28/2595, and E28/2529
The Thunderstorm Gold Project comprises six granted exploration licenses (E28/2528, E28/2529, E28/2595,
E28/3219, E28/3240 and E28/3384) for a total area of 348 km². The Project lies over a major northeast trending
terrane boundary (Newman Shear Zone) between the Fraser Zone (hosting the Nova Ni Deposit-IGO) and the
Nornalup Zone. The project area is completely under cover (mainly Eocene to Miocene) and sits on the edge of
the Eucla Basin (Cenozoic).
Previous exploration completed by IGO includes 530 vertical air core drill holes over an area of approximately
40km by 20km on 1,500m line spacings. Airborne geophysics including magnetics and EM (Spectrum EM survey)
complemented the drilling.
Figure 6 - Gazelle Gold Prospect Location and Drill Results Plan with Section AA
Results from the air core drilling returned widespread gold anomalism from within both the lower Cenozoic cover sequence
and the underlying gneissic rocks (see Figure 6). Higher tenor gold mineralisation discovered at Gazelle and Pion is inferred
to be associated with the earlier Eocene palaeodrainage systems and nearby potential basement gold sources.
5
Refer to Rumble ASX release 7 April 2025 “Rumble Acquires 100% of the Thunderstorm Gold Project”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
11
Gazelle Gold Prospect
Widespread gold mineralisation at Gazelle includes:
•
16m @ 6.69 g/t Au from 42m (20AFAC11321)
o
including 4m @ 22.2 g/t Au from 50m
•
6m @ 9.15 g/t Au from 48m (18AFAC30771)
•
8m @ 1.31 g/t Au from 58m (20AFAC11310) ⃰
•
4m @ 1.37 g/t Au from 70m (20AFAC11311) ⃰
Pion Gold Prospect
Six consecutive drillholes (1.2km along section) returned gold anomalism with the best result of:
•
4m @ 3.80 g/t Au from 86m (18AFAC20486) ⃰
⃰All Air Core Drilling Vertical – True Width
Other Gold, Base Metal & Lithium Projects, Western Australia
Wardawarra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
No significant exploration activities occurred at Braeside during the Quarter.
Munarra Gully Gold-Copper-Silver Project, Western Australia
No significant exploration activities occurred at Braeside during the Quarter.
Braeside Base Metal Project, East Pilbara, Western Australia
No significant exploration activities occurred at Braeside during the Quarter.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
No significant exploration activities occurred at Warroo during the Quarter.
CORPORATE
Cash and Investments
•
As at 31 March 2025, Rumble held $4.1 million in cash.
Appendix 5B – Quarterly Cashflow
•
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information
as disclosed in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $1.828
million.
•
Cash outflows for the December 2024 Quarter totalled $1.6 million across exploration activity (58%),
staff costs (31%), administration and corporate costs (11%).
•
Cash inflows for the December 2024 Quarter totalled $50k consisting of proceeds from interest received.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
12
Appendix 5B – Payments to related parties and their associates
•
Payments to related parties and their associates totalled $226k for the Quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, and
superannuation payments.
Tenement Holdings
•
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorisation
Authorised for release by the Board of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
LinkedIn: https://www.linkedin.com/company/rumble-resources-ltd
X: https://twitter.com/RumbleResources
About Rumble
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on
rapidly advancing the major Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery
in April 2021 broad spaced drilling has rapidly uncovered an emerging world class scale base metal system, with
interpretative geology and drilling continuing to make new discoveries and highlight multiple large-scale deposit
targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located
in Tier 1 regions of Western Australia. While the Company is undertaking metallurgical studies and internal
scoping studies on Earaheedy exploration activities have been focused on Western Queen where an opportunity
exists to grow the gold resources and potentially fast track the project into production.
Rumble’s board and management team has a successful track record in making discoveries and project
development.
Competent Persons Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects
is based on and fairly represents information compiled by Mr Luke Timmermans, who is a Member of the
Australian Institute of Geoscientists. Mr Timmermans is a full-time employee of Rumble Resources Limited, Mr
Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Timmermans consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX
market announcements released on the date noted in the body of the text where that reference appears. The previous market
announcements are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
13
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
14
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining
tenements.
1. The mining tenements held at the end of the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Braeside
E45/2032
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Earaheedy
E69/3815
Granted
Western Australia
100%
Earaheedy
E69/3842
Granted
Western Australia
100%
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
E69/3879
Granted
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Earaheedy
E69/4257
Application
Western Australia
100%
Earaheedy
E69/4265
Application
Western Australia
100%
Fraser Range
E28/3500
Application
Western Australia
100%
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
15
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Thunderbolt
E28/3219
Granted
Western Australia
100%
Thunderbolt
E28/3240
Granted
Western Australia
100%
Thunderbolt
E28/3384
Application
Western Australia
100%
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Warroo
E45/5366
Gr