ASX ANNOUNCEMENT
29 January 2026
December 2025 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of activities
conducted during the December 2025 Quarter. The Company is focused on growing the gold and tungsten
resources at Western Queen, moving into production to generate cash flow, advancing the emerging world class
Earaheedy Zinc-Lead-Silver Project and progressing the other exploration projects in the portfolio.
WESTERN QUEEN GOLD-TUNGSTEN PROJECT
1. Major diamond drilling campaign reported multiple high-grade intersections
· The 20,000m diamond drilling program is well underway, primarily targeting high-grade down plunge
gold extensions to the Western Queen South and Western Queen Central deposits
· The first diamond drill hole completed at Western Queen Central has returned an exceptional
intercept of 5.8m @ 30.72g/t Au from 314.6m1 beneath the historical underground stopes
· Drilling at Western Queen South returned multiple high-grade gold intercepts including:
• 7m @ 3.24g/t Au from 317m
• 22.7m @ 2.84g/t Au from 203.3m
o including 7.2m @ 6.00g/t Au from 213.8m
• 11m @ 3.00g/t Au from 247m
o including 4m @ 6.70g/t Au from 247m
• 12m @ 3.40g/t Au from 283m
o including 3m @ 7.03g/t Au from 288m
• 11m @ 3.99g/t Au from 284m
o including 5m @ 6.99g/t Au from 286m
• 7.97m @ 3.12g/t Au from 279m
• 3.48m @ 4.28g/t Au from 224.52m
• 6m @ 5.05g/t Au from 242m
1
Refer to Rumble ASX release 14 January 2026 “Multiple high-grade gold intercepts at Western Queen including 30.72g/t Au over 5.8m”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 2
· The current drilling program aims to:
o Grow the Western Queen Gold Mineral Resource Estimate (MRE) of 3.72Mt @ 3.1g/t Au for
370,000 oz Au2
o Infill the existing Western Queen South MRE of 2.32Mt @ 2.66g/t Au for 198,900 oz2
with the goal
of reclassifying a significant portion of the Inferred Resources to the Indicated category
o Grow and upgrade the Western Queen Tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2kt WO3
3
2. Tungsten Resource
· In August 2025 the Company announced the maiden Western Queen Tungsten MRE of 4.31Mt @ 0.31%
WO3 for 13.2kt WO3 at a 0.1% WO3 cutoff was announced
· Continuous high-grade cores exist within the global mineral resource estimate totalling 1.44Mt @
0.51% WO3 for 7.4kt WO3 at a 0.3% WO3 cutoff
· The majority of the tungsten MRE is situated at the Western Queen South deposit
· Tungsten mineralisation remains open along strike and at depth within the granted Western Queen
mining leases
· A detailed metallurgical testwork program commenced to determine the optimum processing flowsheet
and metallurgical recoveries that can be achieved for the tungsten mineralisation
· Recent geological interpretation has identified multiple additional high priority target areas
prospective for tungsten endoskarn type mineralisation across the broader Western Queen Project,
with a reconnaissance field program underway
3. Mine Development
· The underground mining scoping study on Western Queen South only, was delivered in November
2025, showing very attractive metrics4
:
Production target of 617kt at 2.95g/t for 58.5koz contained gold
Robust economics with free cash flow of $133M, an NPV (at 8% discount rate) of $112M and
an IRR of 370% at a gold price of A$5,540/oz (compared to current spot gold price of
~A$7,400/oz
All in sustaining costs of A$2,970 per oz gold
Simple underground mine design utilising uphole stoping due to simple, steep-dipping deposit
geometry
Very low upfront predevelopment capital of less than $10M
Only 29% of the Western Queen South MRE is included in the Production Target providing
opportunity to extend the life of mine (LOM) production
2
Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au”
3
Refer to Rumble ASX release 11 August 2025 “Maiden Tungsten Resource at Western Queen Project”.
4
Refer to Rumble ASX release 27 November 2025 “Western Queen South Scoping Study Highlights Robust Underground Mining Project”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 3
· Third party ore processing
o Non-binding MoU signed with Gylden Resources in October 2025 to potentially process Western
Queen ore through Gylden’s Kirkalocka operation5
o A toll treating agreement is being negotiated with Gylden
· Permitting
o All necessary documentation for approval of underground mining operations submitted to relevant
government departments
· Gold royalty
o Discussions ongoing with an interested party on increasing the gold production royalty at Western
Queen for an upfront cash payment
EARAHEEDY ZINC-LEAD-SILVER PROJECT
Metallurgical testwork has commenced to optimise the concentrate specifications from the various Earaheedy
mineral types
DDH1 rig drilling at Western Queen in October 2025
5
Refer to Rumble ASX release 22 October 2025 “Western Queen Drilling & Development Update”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 4
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals (refer to Figure 1).
Figure 1 – Location of Company’s Projects
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 5
Western Queen Gold -Tungsten Project, Mt Magnet, Western Australia
The Western Queen Project is located within a 200km radius of five gold processing plants (refer to Figure 2).
Rumble has signed a non-binding MoU with Gylden Resources to potentially process Western Queen ore through
Gylden’s Kirkalocka plant which has a capacity of 2Mtpa and is circa 180km by road from Western Queen.
Figure 2 - Western Queen mining leases location and proximity to existing mills
Exploration at Western Queen
The Company commenced a major diamond drilling program at Western Queen in October 2025. By 31
December 2025 a total of 25 holes had been drilled, 23 at Western Queen South and two at Western Queen
Central for a total of 9,212m. The program is estimated to be completed late in Q1 CY26.
• Drill results to date
o The first diamond drill hole completed at Western Queen Central intersected high-grade gold
mineralisation beneath the historical underground stopes, returning an exceptional intercept of:
• 5.8m @ 30.72g/t Au from 314.6m (WQDD052) – see Figure 3
·
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 6
·
Figure 3 – Western Queen Central and Princess longitudinal section showing gram x metre contours, select drill
hole intersections and drill intersection awaiting assay results
o Drilling at Western Queen South returned multiple high-grade gold intercepts (see Figure 4)
including:
• 7m @ 3.24g/t Au from 317m (WQDD032)
• 22.7m @ 2.84g/t Au from 203.3m (WQDD033)
o including 7.2m @ 6.00g/t Au from 213.8m
• 11m @ 3.00g/t Au from 247m (WQDD034)
o including 4m @ 6.70g/t Au from 247m
• 12m @ 3.40g/t Au from 283m (WQDD036)
o including 3m @ 7.03g/t Au from 288m
• 11m @ 3.99g/t Au from 284m (WQDD037)
o including 5m @ 6.99g/t Au from 286m
• 7.97m @ 3.12g/t Au from 279m (WQDD038)
• 3.48m @ 4.28g/t Au from 224.52m (WQDD040)
• 6m @ 5.05g/t Au from 242m (WQDD041)
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 7
Figure 4 – Western Queen South longitudinal section showing gram x metre contours, select drill hole
intersections and drill intersections awaiting assay results
• Objectives of the current drill program
1. Discover and grow gold Resources - the primary focus is to target high-grade, down plunge extensions
to the Western Queen South and Central deposits to grow the Western Queen gold Mineral Resource
Estimate (MRE) of 3.72Mt @ 3.1g/t Au for a total of 370,000 oz Au.
2. Upgrade Inferred to Indicated Resources - a portion of the program is aimed at infilling the existing
Western Queen South MRE (refer to Figure 5) which currently stands at 2.32Mt @ 2.66g/t Au for
198,900 oz. The aim is to convert existing Inferred to Indicated Resources ahead of the commencement
of mining operations, subject to permitting, ore sale or an ore toll milling agreement and all other
necessary conditions required for a Financial Investment Decision.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 8
Figure 5 – Long Section showing drill target areas below Western Queen South and Central Deposits
3. Discover and grow tungsten Resources – discover additional high-grade tungsten lodes, which are
spatially adjacent, and sub-parallel to, the high-grade gold lodes with the aim of growing the previously
announced maiden Western Queen tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2Kt WO3. The drill
program will also further assist in developing the understanding of the controls and timing of the
tungsten mineralisation at Western Queen and provide critical information that can be applied to the
targeting of the tungsten potential at a local and district scale.
4. Geotechnical review – core from two holes has been used to understand the geotechnical conditions
in the area where the portal and decline is proposed.
5. Metallurgy – six of the holes drilled to date have been used to provide samples for a metallurgical test
work program across both the Western Queen South and Central deposits to further validate the
previously achieved high gold recoveries of +93% from prior mining by Equigold, Harmony and Ramelius.
The metallurgical test work sample for Western Queen South was collated and sent to the laboratory in
December and the testwork commenced in January.
The drill program should provide the basis for a revised Western Queen MRE in 2026.
Potential Mine Development
Mining Studies
• Western Queen underground Scoping Study and development upside
Following a revised mining schedule that showed a much higher working capital investment requirement for the
open pit development, an underground mine Scoping Study (or “the “Study”) was undertaken by an independent
mining consultant, Baybridge Mining Services, with the results of the Study released in November 20256
.
The Study is based on initially mining only a portion of the defined Western Queen South Resource from
underground and processing the ore at a third-party processing facility.
6
Refer to Rumble ASX release 27 November 2025 “Western Queen South Scoping Study Highlights Robust Underground Mining Project”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 9
The outcome of the Study indicated that the underground mining project had superior economics to the various
open pit options presented by MEGA Resources Pty Ltd (MEGA) and consequently the Company decided to
pursue underground mine development as the preferred option.
Key findings from the Study are as follows:
• The Production Target for Western Queen South is 617kt at 2.95g/t for 58.5koz contained gold
• Robust economics with free cash flow of $133M, an NPV (at 8% discount rate) of $112M and an IRR of
370% at a gold price of A$5,540/oz (compared to the current spot gold price of circa A$7,400/oz)
• All in sustaining costs of A$2,970 per oz gold
• Simple underground mine design utilising uphole stoping due to simple, steep-dipping deposit geometry
• Very low upfront pre-development capital of less than $10M
• Importantly, only 29% of the current Mineral Resource at Western Queen South is included in the
production target, providing additional opportunities to extend the mine life)
In addition to the abovementioned Production Target, there is the opportunity to bring more of the Western
Queen South Resources and Central Resources into the underground mine plan by converting Inferred Resources
into the Indicated Category. One of the aims of the current drilling program is to achieve this outcome. The
Company is confident that additional resource ounces within the Western Queen South and Central mine
resource inventory outlined in the conceptual design (refer to Figure 6) will ultimately be upgraded and included
in an updated mining inventory during CY2026.
Figure 6 – Conceptual underground mine design to mine the bulk of the defined WQ South and Central resource inventory
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 10
Third Party Processing
The Company signed a non-binding Memorandum of Understanding with Gylden Resources Pty Ltd (Gylden) in
October 20257
in relation to the potential to treat Western Queen ore through Gylden’s Kirkalocka plant, located
approximately 180km by road from Western Queen (refer Figure 2). Gylden is planning to refurbish the Kirkalocka
plant and recommence operations, processing third party ores, in the second half of CY2026 processing third
party ores.
Gylden has provided a draft ore tolling agreement to Rumble and a final form agreement is being negotiated.
The Scoping Study assumes a processing and haulage cost of $100 per tonne, which is based upon conversations
between the Company and consultants with knowledge of other third-party milling agreements in the Eastern
Goldfields and the terms provided by Gylden in the draft ore tolling agreement.
Permitting
Given the decision to switch to an underground operation the Company withdrew the open pit Mining Proposal
and Mine Closure Plan submissions.
Following receipt of updated geotechnical and surface/groundwater studies the Company submitted a new
Mining Development and Closure Proposal (MDCP) in mid-January 2026.
The Groundwater Licence, Works Approval and Native Vegetation Clearing Permit applications are with the
relevant government department undergoing assessment.
Additional Gold Royalty
The existing gold royalty applicable to any future gold production from Western Queen is a very modest A$6-20
per ounce of gold mined. Consequently, there is an opportunity for Rumble to sell an additional gold production
royalty for an upfront payment. This strategy would provide Rumble with working capital whilst having only a
minor impact on the future cashflow from the gold project.
Discussions are ongoing with an interested party on increasing the gold production royalty at Western Queen for
an upfront cash payment
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
During the quarter a bulk sample of the various mineral types was prepared in preparation for the metallurgical
testwork program aimed at optimising the concentrate specifications. This testwork program commenced in
January 2026.
Other Gold, Base Metal & Lithium Projects, Western Australia
Warda Warra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
• No significant exploration activities occurred at Warda Warra during the quarter.
Munarra Gully Gold-Copper-Silver Project, Western Australia
• No significant exploration activities occurred at Munarra Gully during the quarter.
Braeside Base Metal Project, East Pilbara, Western Australia
• No significant exploration activities occurred at Braeside during the quarter.
7 Refer to Rumble ASX release dated 22 October 2025 “Western Queen Drilling & Development Update”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 11
Thunderstorm Gold Project, Fraser Range, Western Australia
• No significant exploration activities occurred at Thunderstorm during the quarter.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
• No significant exploration activities occurred at Warroo during the quarter.
Lamil Copper-Gold and Base Metal Project, Patterson Province, Western Australia
• No significant exploration activities occurred at Warroo during the quarter.
CORPORATE
Bain Resources Holding exits its Rumble shareholding
Bain Resources Holding (Bain) recently exited as a significant shareholder in the Company via an off-market
transfer to a number of existing strategic shareholders. The Board and management wish to express their sincere
appreciation to Bain for their support of the Company when the open pit mining of Western Queen was first
considered. Given that the Company has transitioned from the open pit development to an underground mining
strategy it no longer made sense for Bain to remain as a shareholder, hence the sell down.
Capital Raising
During the quarter the Company completed the capital raising announced on the 9 September 2025, with the
Entitlement Issue and the second tranche shares issued.
Annual General Meeting
The Company held its Annual General Meeting on 28 November 2025, with all resolutions being passed.
Cash and Investments
As at 31 December 2025, Rumble held approximately $5.6 million in cash.
Appendix 5B – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as
disclosed in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $2,058k.
Cash outflows for the December 2025 Quarter totalled $3.3 million across exploration activity (62%), staff costs
(22%), administration and corporate costs (16%).
Cash inflows for the December 2025 Quarter totalled $83.2k consisting of proceeds from interest received (70%)
and Government rebates (30%).
Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $338k for the Quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, and superannuation
payments.
Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorisation
Authorised for release by the Board of the Company
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 12
.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
LinkedIn: https://www.linkedin.com/company/rumble-resources-ltd
X: https://twitter.com/RumbleResources
About Rumble
Rumble Resources is an Australian based exploration and mine development company, listed on the ASX in July 2011.
Rumble was established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia. Rumble has a unique suite of resources projects including the
Western Queen Gold-Tungsten Project which is being developed to deliver near term cash flow from the existing underground
resources and resource growth through future exploration success.
In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the capabilities of the exploration team to find
world class orebodies.
Competent Persons Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects is based on
and fairly represents information compiled by Peter Venn and Simon Davies, who are Members of the Australian Institute of
Geoscientists. Mr Venn and Mr Davies are full-time employee of Rumble Resources Limited, Mr Venn and Mr Davies have
sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which
they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Venn and Mr Davies consent to the inclusion in the report
of the matters based on this information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported resources and exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference appears.
The previous market announcements are available to view on the Company's website or on the ASX website (www.
asx.com.au). The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 13
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining
tenements.
1. The mining tenements held at the end of the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Braeside E45/2032 Granted Western Australia 100%
Braeside E45/4368 Granted Western Australia 100%
Copper Hill E46/1614 Application Western Australia 100%
Copper Hill E46/1626 Application Western Australia 100%
Earaheedy E69/3464 Granted Western Australia 75% Note 1
Earaheedy E69/3787 Granted Western Australia 100%
Earaheedy E69/3815 Granted Western Australia 100%
Earaheedy E69/3862 Granted Western Australia 100%
Earaheedy E69/4062 Application Western Australia 100%
Earaheedy E69/4099 Application Western Australia 100%
Earaheedy L69/0058 Application Western Australia 75% Note 1
Earaheedy M69/0150 Application Western Australia 75% Note 1
Irregully E08/3841 Application Western Australia 100%
Lamil E45/5271 Granted Western Australia 50%Note 4
Munarra Gully E51/1677 Granted Western Australia 80% Note 3
Munarra Gully E51/1919 Granted Western Australia 100%
Munarra Gully E51/1927 Granted Western Australia 100%
Saltbush E45/6975 Application Western Australia 100%
Talbot E46/1604 Application Western Australia 100%
Thunderbolt E28/3219 Granted Western Australia 100%
Thunderbolt E28/3240 Granted Western Australia 100%
Thunderbolt E28/3384 Application Western Australia 100%
Thunderbolt E28/3500 Application Western Australia 100%
Thunderbolt E45/5366 Granted Western Australia 100%
Thunderstorm E28/2528 Granted Western Australia 30%Note 2
Thunderstorm E28/2529 Granted Western Australia 30%Note 2
Thunderstorm E28/2595 Granted Western Australia 30%Note 2
Warroo E45/5366 Granted Western Australia 100%
Warroo E45/5689 Granted Western Australia 100%
Western Queen E20/967 Granted Western Australia 100%
Western Queen E59/2816 Application Western Australia 100%
Western Queen E59/3021 Application Western Australia 100%
Western Queen L59/40 Granted Western Australia 100%
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 14
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Western Queen M59/45 Granted Western Australia 100%
Western Queen M59/208 Granted Western Australia 100%
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 15
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Fraser Range –
Thunderbolt
E28/3500 Granted - 23 December 2025 Western Australia 100%
Fraser Range E28/3566 Application – 13 October 2025 Western Australia 100%
Copper Hill E46/1626 Granted – 21 November 2025 Western Australia 100%
· One tenement Granted
· No tenements were acquired
· Two applications were made
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Earaheedy E69/4257 Application Western Australia 100%
Braeside E45/4874 Granted Western Australia 100%
RUMBLE JOINT VENTURES - NOTES
1. Earaheedy Project, Western Australia
· E69/3464 75% RTR / 25% Zenith Minerals
· M69/0150 75% RTR / 25% Zenith Minerals
· L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
· E28/2528, E28/2529, E28/2595, - IGO 70% / RTR 30% - Refer ASX release 7 April 2025 “Rumble acquires
100% of the Thunderstorm Gold Project”
3. Munarra Gully, Western Australia
· E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
· E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 16
Appendix 2
Table 1 – Mineral Resource Estimate Tabulation for the Western Queen Project broken down by Resource Area
and split of Indicated and Inferred Resources for reported Open Pit and Underground economic cut-offs.
Indicated Inferred Total
Prospect Tonnage Au Au Tonnage Au Au Tonnage Au Au
kt g/t Oz kt g/t Oz kt g/t Oz
Cranes 70 1.4 3,300 70 1.4 3,300
Duke 30 7.2 6,900 4 6.4 800 34 7.1 7,700
WQC 250 7.2 56,600 560 3.8 67,300 800 4.8 124,000
Princess 100 1.9 5,900 380 2.5 30,300 480 2.3 36,200
WQS 830 3.0 78,600 1,490 2.5 120,200 2,320 2.7 198,900
Total 1,210 3.8 148,000 2,510 2.8 222,000 3,720 3.1 370,000
Notes: Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of
Ashmore Advisory and a Member of the AIG. Mr. Searle has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify as a
Competent Person as defined in the JORC Code (2012).
All Mineral Resources figures reported in the table above represent estimates as at July 2025. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the
location, shape and continuity of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Cranes Mineral Resource figures are derived from the 2024 Mineral Resource estimate.
Open Pit optimisations and preliminary underground Mining Shape Optimisations (MSO) have shown that a large
proportion of the resource has the potential to be mined economically, and further mining studies are warranted
to further progress the project. Mineral Resources that are not Ore Reserves have not demonstrated economic
viability at this point. The estimate of Mineral Resources may be materially affected by environmental,
permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
Table 2 - Inferred Mineral Resource tabulation for the Earaheedy Project.
Cut off Inferred – Chinook Inferred – Tonka and Navajoh Inferred Total
Zn+Pb Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag
% Mt % % % g/t Mt % % % g/t Mt % % % g/t
0.5 334 1.3 0.9 0.4 2.3 128 1.5 1.2 0.2 1.9 462 1.3 1.0 0.3 2.2
1.0 135 2.1 1.5 0.6 3.4 59 2.3 2.0 0.4 2.6 194 2.2 1.6 0.5 3.1
2.0 63 3.0 2.1 0.8 4.6 31 3.3 2.8 0.5 3.4 94 3.1 2.4 0.7 4.2
2.5 39 3.4 2.4 0.9 5.2 25 3.5 3.0 0.5 3.6 65 3.4 2.6 0.8 4.5
3.0 24 3.8 2.7 1.1 5.7 17 3.9 3.3 0.6 3.8 41 3.8 3.0 0.9 4.9
4.0 7 4.7 3.3 1.5 6.8 5 4.9 4.1 0.8 4.3 12 4.8 3.6 1.2 5.7
Footnote: Inferred Mineral Resource is constraine