Western Queen Gold Resources increased 76% to 287koz
Released
Released
Announcement PDF
15 October 2024
Western Queen Gold Resources increased 76% to
287koz @ 2.02g/t
Rumble Resources Ltd
•
The Western Queen Gold Project Mineral Resource Estimate (MRE) has been
upgraded to 4.42Mt at 2.02g/t for 286,600 oz for 123,200oz an increase of 76%
in the Indicated and Inferred Resources compared to the August 2021 MRE
•
Diamond drilling completed in June 2024 prompted a comprehensive lithostructural
F +61 8 6555 3981
remodelling of the MRE
rumbleresources.com.au
Indicated Resources have increased by 142%, representing 56% of the total MRE
•
The Western Queen MRE is contained within granted Mining Licences,
M59/208 and M59/45, and located within a 100km radius of three gold processing
facilities, the closest being Spartan’s Dalgaranga Mill (48km by road)
Historical mining has produced 880,000t at 7.6g/t Au for 215,000 oz from the
Western Queen gold deposits
•
Mineralisation remains open along strike and at depth along the 2.7km Western
Queen Shear Zone and shows strong potential for additional high-grade resource
growth.
•
T +61 8 6555 3980
review and reinterpretation of the Western Queen Gold Project and led to the
•
•
Level 1, 16 Ord Street,
West Perth, WA 6005
Further drilling aimed at significantly increasing the new MRE is planned in the
coming months with up to 12,000m of RC and diamond drilling to test these
underexplored areas
ASX RTR
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Peter Harold, Rumble Managing Director and CEO commented: “We believe that
Western Queen is one of the most underexplored high-grade gold projects in
Western Australia. The 76% increase in in contained ounces is an extremely
positive development for Rumble and highlights the quality of the resources at
Western Queen. We now have 286,600 ounces of gold averaging just over 2
grams per tonne on granted mining leases, within trucking distance of existing
operating gold plants, historical production of 215,000 ounces together with
significant exploration prospectivity. The exploration team is to be complemented
on this work and we look forward to more positive newsflow from Western Queen
including the results from the next phase of drilling as we move towards production
from Western Queen South.”
Mr Brett Keillor
Technical Consultant
Mr Trevor Hart
CFO & Joint Company
Secretary
Mr Steven Wood Joint
Company Secretary
Rumble Resources Limited (ASX:RTR) (“Rumble” or the “Company”) is pleased to announce a 76% increase
to the Company’s Mineral Resource Estimate (MRE) for the Western Queen Gold Project that was previously
announced on 2 August 2021.The revised MRE is 4.42Mt @ 2.02 g/t Au for a total of 286,600 ounces for
the Western Queen Gold Project. The MRE includes Indicated and Inferred Resource classifications in
accordance with the Australasian Code of Reporting of Identified Mineral Resources and Ore Reserves (JORC
Code 2012), with all the resources located within granted Mining Leases. Indicated Resources are 2.39Mt @
2.11g/t Au for 163,800 ounces, which is a 142% increase compared to the August 2021 MRE1, and
represents 56% of the total MRE. The combined open cut and underground resource for the Western Queen
Gold Project is presented in Table 1.
Diamond drilling completed by the Company in June 2024 provided further geological understanding of the
controls on the mineralised system and prompted a comprehensive geological review of the Western Queen
Project. This review led to a lithostructural reinterpretation that incorporated new zones of mineralisation that
were not previously wireframed as part of the resource modelling exercise in 2021 as well as the extensions
provided by the recent drill programs.
The updated Western Queen Project Mineral Resource Statement includes all reverse circulation (RC) and
diamond drilling results from July 2024 and the new wireframes modelled and supplied by Rumble, whilst the
MRE was prepared by Ashmore Advisory Pty Limited (Ashmore). Ashmore undertook the MRE using Ordinary
Kriging estimation methodology constrained by interpreted domain wireframes and was depleted for all
resources contained inside of existing open pit and underground mining voids prior to reporting. The Western
Queen Resource is reported at a 0.5g/t Au cut-off for open cut resources above the 245mRL level and 1.5g/t
Au cut-off below the 245mRL level for underground resources. The 245mRL level was chosen as it is the base
level of the Western Queen Central Open Pit, which has historical reconciled production of 660kt at 8.9g/t Au
for 190,000 ounces.
The deposits remain open at depth and the Company believes there is significant near-term exploration
potential at the Western Queen Gold Project. In particular, the Princess Deposit area, between the Western
Queen Central and South Open Pits has only previously been sparsely drilled below the oxide-transitional
zone, 50-80m below surface (refer to Figure 1). Additionally, significant exploration potential also exists along
strike to the north and to the south along the recently reinterpreted position of the Western Queen Shear Zone
(WQSZ). Figure 3 displays the previous significant drillhole intercepts and recently inferred position of the
WQSZ that remains largely untested.
1. Refer to Rumble Resources Limited ASX announcement “Western Queen Gold Project - Resource Upgrade by 35% to 163,200oz Au” dated 2 August 2021
2
Figure 1 - Western Queen Gold Project – longitudinal section of resources, previous mining and near deposit
exploration potential
The Western Queen Project located within a 100km radius of three gold processing mills (refer to Figure 2).
The closest mill is the Dalgaranga Mill (48km by road) which has a capacity of 2.5 Mtpa. The Checkers Mill
has a capacity of 1.9 Mtpa and the Tuckabianna Mill has a capacity of 1.2 Mtpa. These facilities provide the
possibility for a near term toll treating option.
Figure 2 – Western Queen tenure and location with neighboring Gold Processing Facilities
3
Proposed Exploration Program
The Company is prioritising a significant drill program for commencement in early November at Western
Queen. The program will include up to 10,000m reverse circulation and 2,000m diamond core drilling.
Preliminary discussions with drilling contractors indicate that a significant portion of the program will be
completed under a “drill for equity” style arrangement. The initial priority areas for the upcoming drilling program
are as follows:
ML59/45 and ML59/208 (refer Figures 1 and 3)
•
Whilst the Princess deposit area between Western Queen South (WQS) and Western Queen
Central (WQC) open pit has seen extensive historical small scale shaft mining, only sparse
exploration drilling has occurred below the upper oxide-transitional zone.
•
Immediately below the WQS Resource, multiple high-grade lodes exist which are open at depth.
Previous exploration drilling at WQS returned intercepts including:
•
o
4m @ 49.73 g/t Au from 134m (QND-38975-1)
o
17m @ 5.7 g/t Au from 221m – (WQRC188)
o
5m @ 38.76 g/t Au from 193m - (WQRC188)
o
5m @ 5.02g/t Au from 216m – (WQDD013)– newly recognised lode
Directly below the WQC open pit and underground workings where multiple high-grade lodes exist
which remain open and untested at depth.
Previous exploration drilling at WQC returned intercepts including:
o
o
o
o
•
•
•
6.4m @ 36.09 g/t Au from 305.7m (WQD-1072)
6m @ 34.24 g/t Au from 354m (WQRC007D)
5m @ 22.00 g/t Au from 280m (WQRC150)
11.8m @ 16.08 g/t Au from 340.4m (WQD-1089)
Below the Duke Deposit, where mineralisation is open at depth. Previous exploration drilling at Duke
returned intercepts including:
o
8m @ 26.27 g/t Au from 14m (WQRC155)
o
7m @ 60.6 g/t Au from 70m – (WQJC-32)
o
6m @ 25.87 g/t Au from 48m (WQRC157)
o
6m @ 37.34 g/t Au from 50m – (QNC-10310-1)
Over the 2km strike between the Duke and Cranes deposits;
o
Limited RAB drilling with an average end of hole depth of less than 20m and three RC holes
is the only drilling that exists between Duke and Cranes.
o
Cranes has a small gold in laterite and oxide Inferred Resource of 3,314oz @ 1.39g/t (refer
to Tables 1 and 3).
o
Limited previous drilling at Cranes returned 14m @ 4.87 g/t Au from surface and 11m @
1.85 g/t Au from surface.
Further northeast of Cranes the position of the WQSZ has been reinterpreted using detailed airborne
magnetics flown by Rumble and remains untested.
4
Figure 3 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
Western Queen Mineral Resources Summary
The deposits have been interpreted as a structurally controlled shear hosted mineralisation focused along
the main Western Queen Shear Zone (WQSZ) that strikes NE-SW and dips steeply 70o to the west. Structural
geology logging information collected as part of the June 2024 diamond drilling program indicates that highgrade gold mineralisation is controlled in part by a shallow to moderate (30°-40°) south dipping plunge control.
This observation matches the overall grade distribution of the Western Queen South (WQS) and Western
Queen Central (WQC) ore bodies.
The Mineral Resources have been constrained by mineralisation domains built using Leapfrog software
based on interval selection interpretation for mineralised zones above certain grade thresholds. The
Mineral Resource block models were created and estimated in Surpac using Ordinary Kriging grade
interpolation.
For open cut mineralisation modelling (above the 245mRL level) the following criteria were used:
•
•
•
•
maximum of 3m internal waste;
composite gold grade interval greater than 0.3g/t;
zones extended up and down-dip halfway to the nearest hole in well-drilled areas of no more
than 40 m in sparsely drilled areas; and
Mineralised domains situated in the upper oxide zone were either modelled as flat lying supergene
zones or steeply dipping zones if they were interpreted to represent the in-situ portion of an
underlying hypogene zone.
5
For underground mineralisation modelling (below the 245mRL level), the following criteria were used:
•
•
•
maximum of 3m internal waste;
composite gold grade interval greater than 1.0g/t; and
zones extended up and down-dip halfway to the nearest hole in well-drilled areas of no more
than 40 m in sparsely drilled areas.
Table 1: Mineral Resource Estimate Tabulation for the Western Queen Project
Prospect
Cranes
Duke
WQC
Princess
WQS
Total
Tonnage
kt
Indicated
Au
g/t
Au
Ounces
50
590
180
1,560
2,390
4.23
3.11
0.92
1.79
2.11
7,000
59,300
5,200
90,300
161,800
Tonnage
kt
70
70
630
680
580
2,030
Inferred
Au
g/t
1.39
2.70
2.54
1.35
1.86
1.91
Au
Ounces
3,300
5,700
51,700
29,300
34,600
124,700
Tonnage
kt
70
120
1,230
850
2,140
4,420
Total
Au
g/t
1.39
3.37
2.81
1.26
1.81
2.02
Au
Ounces
3,300
12,800
111,000
34,600
124,900
286,600
Notes:
Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis. Refer to Table 3 for a comprehensive
breakdown of Resources by Area
All Mineral Resources figures reported in the table above represent estimates as at October 2024. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape
and continuity of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
The pit optimisations have shown that a large proportion of the resource has the potential to be mined economically, and
further mining studies are warranted to further progress the project. Mineral Resources that are not Ore Reserves have not
demonstrated economic viability at this point. The estimate of Mineral Resources may be materially affected by
environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
6
Table 2 – Grade-Tonnage breakdown of the Western Queen Resource for varying economic cut-off grades
Total Resource above
245mRL
Tonnage
Au
Au
(t)
(g/t)
Ounces
Total Resource below
245mRL
Tonnage
Au
Au
(t)
(g/t) Ounces
0.0
3,621,463
1.31
152,208
3,810,757
1.69
207,004
0.3
3,501,177
1.34
151,271
3,714,350
1.73
206,355
0.5
2,915,699
1.53
143,557
3,379,240
1.86
202,105
0.7
2,285,138
1.79
131,447
3,073,401
1.99
196,241
1.0
1,526,057
2.26
111,044
2,344,144
2.34
176,104
1.2
1,209,625
2.57
99,898
1,915,774
2.61
160,903
1.5
856,578
3.08
84,786
1,499,678
2.97
143,001
1.8
651,755
3.53
73,923
1,115,797
3.42
122,668
2.0
552,937
3.82
67,918
910,560
3.76
110,168
2.5
408,930
4.38
57,564
529,827
4.89
83,299
Cut-off
Grade
(g/t)
Note: The Western Queen Resource has been reported at a 0.5g/t cut off grade for Resources above the 245mRL and
1.5g/t for Resources below the 245mRL. The corresponding reported numbers are highlighted in the table..
Historical Open Pit and Underground Mine Production at Western Queen
Oldest known historical production from Western Queen was between 1936-1937, when 9,991tonnes at
an average grade of 17.3 g/t Au for 5,550 oz Au was mined. Subsequently the Western Queen mine
produced 660,000 tonnes at 8.9 g/t Au for 188,800 oz Au. The high-grade orebody was mined initially
via open pit (Equigold NL October 1998 to March 2001), then via a small underground mine (2001 - 2002)
developed from a decline in the pit.
During the underground mining period, 82,907 tonnes of ore was mined in two stages and sent to the
Dalgaranga Mill. The first stage completed was for 8,355 tonnes at 10.32 g/t Au. The second stage, 74,552
tonnes was processed as the Dalgaranga Mill (Equigold) when the mill was shutting down, and
consequently the reconciliation of grade is uncertain (although it was thought to be more than 10 g/t Au).
There are only two stope models in the historic underground workings’ wireframes (refer Figure 4). This
means there is potential for high-grade mineralisation in unmined areas of the underground, such as the
crown pillar, between levels 1 and 2, and beneath level 2.
A historic mine report (dated 2001) wrote that the ore had been closed out on the Level 2 northern drive
by an antiformal fold which plunges to the north and appears to dip at about 60 to 70°. There is also a
cross-cutting pegmatite potentially closing off the ore. It was noted in the report that there was potential
for additional tonnes below the 3 Level, and that the area is poorly understood both in terms of
mineralisation and the position of the pegmatite, due to lack of holes.
7
Figure 4 - Western Queen Central Base of Pit and Underground workings
The Western Queen South open pit has been previously mined and the ore hauled to the Checkers Mill in
Mt Magnet in two separate mining campaigns by Harmony Gold (Harmony) in 2007 and Ramelius
Resources Limited (Ramelius) in 2014. A total of 226,727 tonnes at 3.74 g/t Au for 27,238 oz Au was
mined.
The first mining campaign by Harmony commenced on 12 July 2007 and finished on 20 November 2007
with a pit wall failure ending production when the pit was 42 m deep. A total of 61,660 tonnes at 3.46 g/t
Au for 6,859 oz Au was mined in this period. The second campaign by Ramelius commenced on 1 March
2013 and finished on 12 March 2014 with a pit wall failure ending production when the pit was 90m deep.
A total of 165,067 tonnes at a grade of 3.84 g/t Au for 20,378 oz Au was mined during this time.
The following is a summary of additional material information used to estimate the Mineral Resource, as
required by Listing Rule 5.8.1 and JORC 2012 Reporting Guidelines.
History
The Western Queen Project has undergone numerous ownership changes in the past. The most recent
transfer of ownership was from Ramelius (wholly-owned entity Mt Magnet Gold Pty Ltd) to Rumble in
August 2019.
Mineral Title Status
There are two contiguous mining leases (M59/45 and M59/208, total area 9.8 km2) within the project area
and both are wholly-owned by Rumble Resources Limited. Both mining leases are in good standing. In
addition, there are three exploration tenements (E20/0967, ELA59/2816 and ELA59/2926) over the area,
covering the northern and southern strike extent of the mineralised Western Queen Shear Zone (WQSZ)
in the Warda Warra greenstone belt.
Geology and Geological Interpretation
The Western Queen tenements lie within the Archaean Warda Warra Greenstone Belt, a north trending
enclave within the Murchison Province of the Yilgarn Craton.
8
The Western Queen and Western Queen South deposits are within the Kylie Mining Group and are the
largest known deposits within the Warda Warra Greenstone Belt. The Warda Warra Greenstone Belt is
approximately 35 km in length, and at the southern end near the Western Queen deposit it is 2 km wide,
while at the northern end it is up to 7 km wide. The north striking and steeply west dipping Warda Warra
Greenstone Belt is a layered sequence that has been metamorphosed to amphibolite grade and is
enveloped by recrystallised granitoids.
At Western Queen, the geology is steep westerly dipping and comprises intercalated sheared amphibolites
of mafic to ultramafic composition with thin iron formation horizons, komatiitic basalt, dolerite sills, and talc
chlorite schists. Later dolerite and pegmatitic felsic intrusives cut across the amphibolites and gold
mineralisation.
Mineralisation is associated with sheared silica-sulphide zones with an ultramafic footwall and a mafic
hanging wall. The mineralised zone is strongly recrystallised and massive, comprising phlogopite- chloritetremolite-talc schist, amphibolite with lenticular quartzo-feldspathic layering and quartz- muscovite-biotitesillimanite schist. Pyrite, pyrrhotite, chalcopyrite, molybdenite and scheelite are present. Depth of complete
oxidation is approximately 30m to 60m with depth to fresh rock approximately 45 to 80m. A zone of
lacustrine sediments up to 45m thick overlies the WQS deposit.
Sampling and Sub-Sampling Techniques
Sampling procedures followed by historic operators are assumed to be in line with industry standard
practice at the time. Since 2019, RC drilling by RTR was used to obtain 1 m samples which were split cone
splitter at the rig to produce a 1.5 – 2.5kg sample. The samples were transported to the laboratory (ALS
Perth) for analysis via 30g Fire Assay.
Diamond drilling completed by Rumble was sawn as ½ core (for NQ) and sampled. Previous companies
have conducted diamond drilling with mostly ½ core or rarely ¼ core taken.
Drilling Techniques
The Western Queen deposit has been sampled using Rotary Air Blast (RAB), Air Core (AC), Reverse
Circulation (RC) and Diamond (DD) drilling over numerous campaigns by several operators. The RC
drilling for resource definition and grade control used a nominal 5 ½ inch diameter face sampling hammer.
AC drilling used a conventional 3 ½ inch face sampling blade to a refusal or a 4 ½ inch face sampling
hammer to a nominal depth. The diamond drilling was undertaken as diamond tails to the RC holes or
diamond core from surface, using NQ2 sized equipment. RAB and AC drilling has been excluded from the
estimate.
RC sample recovery was visually assessed and recorded where significantly reduced. Very little sample
loss was noted. The diamond drilling recovery was excellent with very little or no core loss identified. RC
samples were visually checked for recovery, moisture and contamination. A cyclone and splitter were used
to provide a uniform sample and these were routinely cleaned. DD drilling was undertaken and the core
measured and orientated to determine recovery, which was generally 100%.
Classification Criteria
The Western Queen Mineral Resource was classified as Indicated and Inferred Mineral Resource based
on data quality, sample spacing, and lode continuity. The Indicated Mineral Resource was defined within
areas of close spaced RC and DD drilling of predominantly 25m by 20m, and where the continuity and
predictability of the lode positions was good. The Inferred Mineral Resource was assigned to areas where
drill hole spacing was greater than 25m by 20m, where small, isolated pods of mineralisation occur outside
the main mineralised zones, and to geologically complex zones.
Sample Analysis Method
9
Historical gold assays were carried out by a combination of Aqua regia and Fire assay. For the most recent
drilling carried out by Rumble, samples were assayed at ALS Perth by Fire Assay. The sample was
crushed, a 250g split was taken and pulverised. Assaying for gold was via a 30g charge lead collection
Fire Assay with AAS finish.
Estimation Methodology
The mineralisation was constrained by wireframes prepared using a 0.2g/t gold cut-off grade and
generated in Leapfrog software. Following a review of the population histograms and log probability plots,
it was determined that the application of high-grade cuts was required, with cuts ranging between 10 and
70g/t gold. A total of 81 composites were cut.
The block model parent block dimensions used were 10m NS by 5m EW by 5m vertical with sub-cells of
0.625m by 0.625m by 0.625m and the model was rotated on a bearing of 020° to match the approximate
strike of the mineralisation. In addition, where grade control spaced drilling existed, the estimation parent
cell size was reduced to 5m NS by 2.5m EW by 2.5m vertical. The parent block size dimension was
selected on the results obtained from Kriging Neighbourhood Analysis that suggested this was the optimal
block size for the dataset.
The Mineral Resource block model was created and estimated in Surpac using Ordinary Kriging (“OK”)
grade interpolation. An orientated ‘ellipsoid’ search was used to select data and adjusted to account for
the variations in lode orientations, however all other parameters were taken from the variography. Up to
four passes were used for each domain. First pass had a range of 30m, with a minimum of 8 samples.
For the second pass, the range was extended to 60m, with a minimum of 4 samples. For the third pass,
the range was extended to 150m, with a minimum of 2 samples. A final pass was used to estimate the
remaining unestimated blocks. A maximum of 16 samples was used for all passes, with a maximum of 6
samples per hole.
Bulk densities used for the Western Queen Mineral Resource estimate was based on 171 measurements
completed by RTR on rock core samples using the water displacement method, as well as known values
from historical mining. The following bulk densities as tonnes per cubic metre (t/m3) were used:
•
Oxide: 1.9t/m3
•
Transition: 2.56t/m3
•
Fresh: 2.87t/m3
Cut-off Grade
The Mineral Resource has been reported at 0.5g/t Au cut-off above the 245mRL for open pit mining and
at a 1.5g/t Au cut-off below the 245mRL for underground mining. The 245mRL is the maximum depth of
the Western Queen Central mined pit. In addition, pit optimisation work conducted by consultant mining
engineers supports this approach.
The reporting cut-off parameters were selected based on assumed economic cut-off grades for the Project.
Mining and Metallurgical Methods and Parameters
The deposit has previously been mined using selective open pit mining methods and small-scale
underground development.
Metallurgical test work was undertaken by previous operators. Historic production has demonstrated that
good gold recovery can be expected from conventional processing methods. The average processing
recovery used for the pit optimisations was 93%, which is supported by actual production.
10
Authorisation
This announcement is authorised for release by the Board of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Peter Harold
Peter Venn
Trevor Hart
Managing Director & CEO
Technical Director
Chief Financial Officer
Rumble Resources Limited.
Rumble Resources Limited
Rumble Resources Limited
info@rumbleresources.com.au
About Rumble
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for suitable
mineral acquisition opportunities in Western Australia. Rumble has a unique suite of resources projects including the
Western Queen Gold Project which has the potential to have near term cashflow and resource growth through future
exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project in 2021 has demonstrated the
capabilities of the exploration team to find world class orebodies.
11
Table 3 - Mineral Resource Estimate Tabulation for the Western Queen Project broken down by Resource Area and split of
Indicated and Inferred Resources for reported Open Pit and Underground economic cut-offs
Prospect
WQ
Central
Mining
Method
Cut-off
g/t
OC
0.5
UG
1.5
TOTAL
WQ
South
OC
0.5
UG
1.5
TOTAL
Duke
OC
0.5
UG
1.5
TOTAL
Princess
OC
0.5
UG
1.5
TOTAL
Cranes
OC
0.5
UG
1.5
TOTAL
Total
OC
0.5
UG
1.5
TOTAL
Classification
Tonnes (t)
Au g/t
Contained
Metal
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
480,201
162,172
642,373
113,336
471,388
584,724
593,537
633,560
1,227,097
1,314,113
102,338
1,416,451
250,672
476,306
726,978
1,564,785
578,644
2,143,429
51,834
65,598
117,432
714
714
51,834
66,312
118,146
177,575
487,825
665,400
187,262
187,262
177,575
675,087
852,662
74,042
74,042
74,042
74,042
2,023,723
891,975
2,915,698
364,008
1,135,670
1,499,678
2,387,731
2,027,645
4,415,376
1.77
1.19
1.62
8.78
3.00
4.12
3.11
2.54
2.81
1.62
1.23
1.59
2.71
2.00
2.24
1.79
1.86
1.81
4.23
2.70
3.38
2.23
2.23
4.23
2.70
3.37
0.92
1.04
1.01
2.17
2.17
0.92
1.35
1.26
1.39
1.39
1.39
1.39
1.66
1.24
1.53
4.60
2.44
2.97
2.11
1.91
2.02
27,255
6,228
33,483
32,006
45,490
77,496
59,261
51,718
110,979
68,460
4,046
72,506
21,821
30,561
52,381
90,281
34,607
124,887
7,046
5,698
12,744
51
51
7,046
5,749
12,795
5,248
16,276
21,524
13,073
13,073
5,248
29,349
34,597
3,299
3,299
3,299
3,299
108,009
35,548
143,557
53,826
89,175
143,001
161,836
124,723
286,558
Note: Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
All Mineral Resources figures reported in the table above represent estimates at October 2024. Mineral Resource estimates
are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. OC is Open Cut for Resources above the 245mRL and
UG is Underground for Resources below the 245mRL.
12
Previous ASX Announcements – Western Queen Gold Project
• 6/8/2019 – Option to Acquire High-Grade Western Queen Gold Project
• 4/11/2019 – Western Queen Gold Project – Multiple Targets to be Drilled
• 22/11/2019 – Drilling Commenced at Western Queen Gold Project
• 17/2/2020 – High Grade Gold Discovery at the Western Queen Project
• 25/2/2020 – Drilling Commenced at the Western Queen Gold Project
• 14/4/2020 – Exploration Update – Three Drill Programmes Completed
• 20/5/2020 – Drilling Identifies Multiple High-Grade Gold Shoots
• 9/6/2020 – Major Drill Programme to Commence – Western Queen Gold Project
• 24/6/2020 – Major Drill Programme Commenced at The Western Queen Gold Project
• 16/7/2020 – 500% Increase in Landholding Extends Western Queen Project
• 31/8/2020 – Option Exercised to Acquire the Western Queen Gold Project
• 10/9/2020 – 100% Acquisition of Western Queen Gold Project Complete
• 4/11/2020 – Discovery High-Grade Gold Shoots and Shear Zone Extension
• 3/2/2021 – High-Grade Gold Shoots at Western Queen South Deposit
• 2/8/2021 – Western Queen Resource Upgrade to 163,000oz
• 29/4/2024 – Drilling to test High-Grade Gold Zones at Western Queen
• 29/5/2024 – Western Queen Drilling Commenced
• 16/7/2024 – Western Queen Drilling Update
• 6/8/2024 – High-Grade Tungsten Discovery at Western Queen
• 2/9/2024 – Tungsten Discovery at Western Queen Confirmed
Competent Persons Statement
The information in this release that relates to Mineral Resources is based on information compiled by Mr Shaun Searle who is a Member
of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and independent consultant to Rumble
Resources Limited. Mr Searle has sufficient experience, which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Searle consents to the inclusion in
this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to exploration data, geological Interpretation and sampling information informing the Mineral
Resource Estimate and potential for eventual economic extraction of the Mineral Resources is based on and fairly represents information
compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is an employee of
Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined