Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
30 October 2023
September 2023 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide
an update with respect to the Company’s activities during the September 2023 quarter,
focusing on advancing the emerging world class Earaheedy Zinc-Lead-Silver Project.
Highlights include:
Earaheedy Zn-Pb-Ag-Cu Project, Western Australia
Mato Prospect RC Drilling E69/3787 (100% RTR)
•
Initial RC drilling returned significant high-grade Zn-Pb mineralisation in RC
drill hole EHRC733 including:
o
•
16m @ 5.09% Zn + Pb from 153m (EHRC733)
Including 10m @ 7.05% Zn + Pb from 157m
Assay results from 17 holes from the preliminary broad spaced RC drill program
at Mato intercepted flat lying Zn-Pb mineralisation including:
o
9m @ 3.15% Zn + Pb from 165m (EHRC732)
o
46m @ 1.04% Zn + Pb from 104m (EHRC726)
o
14m @ 2.49% Zn + Pb from 154m (EHRC720)
Including 4m @ 5.16% Zn + Pb from 104m, and
•
Zn-Pb sulphide mineralisation is hosted within the Navajoh Unconformity Unit
and the Sweetwaters Well Dolomite, with near identical geological controls to
the Chinook, Tonka and Navajoh Deposits.
•
The width and tenor of mineralisation intercepted in EHRC733 indicates that
potential feeder faults exist at the Mato Prospect and confirms the
prospectivity of the 9km x 3km area to host high grade Zn-Pb sulphide
mineralisation.
Next Steps
•
Continue RC discovery drilling at the 9km x 3km Mato Prospect – testing highgrade feeder fault targets along strike and up-dip of drill hole EHRC733
•
Resource definition drilling – expand & upgrade the classification of existing
sulphide deposits at Chinook and Tonka
•
Metallurgical studies – planned diamond drilling at Chinook, Tonka-Navajoh to
provide further material for flotation optimisation and beneficiation studies
•
Scoping studies – review early development scenarios/options following
abovementioned metallurgical programs
Corporate
•
On 15 September the Company announced planned changes to the Board of
Directors. Following the quarter’s end the Company announced that highly
regarded mining executive and director Mr Peter Harold as the new
Managing Director and CEO to drive Rumble’s next exciting phase of growth.
•
Capital raising comprising of a strongly supported placement to institutional
investors plus a follow-on share purchase plan raised $8.6 million
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Venn
Interim Managing Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Steven Wood
Company Secretary
Mr Brett Keillor
Head of Technical
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
1.1
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna, Western Australia.
The Project includes granted tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals
Ltd (ASX: ZNC) 25% Joint Venture (“JV”) and E69/3787, E69/3862, ELA 69/4124, ELA69/4149 and ELA 69/4165,
which is 100% owned by Rumble (see Figure 1).
Exceptional Resource Growth Potential and Opportunities
The Project has exceptional growth potential with only two (Types 1 and 2 – see Figure 2) of the five identified
mineralised styles explored, and less than 35% of the 45km Navajoh Unconformity Unit effectively tested by drilling.
These untested and open extensions occur largely within Rumble’s recently granted 100% tenements E69/3787 and
E69/3862 - (See Figure 1).
Figure 1 – Earaheedy Project – Location of Deposits and Prospectivity Map
Rumble Resources Limited - ASX: RTR
Page | 2
Figure 2: Earaheedy District Mineralisation Styles
Mato Prospect RC drilling – E69/3787 (100% RTR)
During the quarter, the Company continued very broad spaced RC drilling at the Mato Prospect, within 100% RTR
tenements – E69/3787 and E69/3862. The initial RC program at the Mato Prospect was designed to test several high
priority targets along the prospective Navajoh Unconformity Unit within the 12km Sweetwater Trend, west of the
Chinook deposit – see Figure 1.
The Company has drilled 23 holes at Mato (see Figures 3 and 4), with the assay results received from the first 17
drill holes – refer to Rumble Resources Ltd ASX announcement dated 5 October 2023. The best result was returned
from EHRC733 and included 16m @ 5.09% Zn + Pb from 153m, and a higher grade internal zone of 10m @ 7.05%
Zn + Pb from 157m. This intersection is interpreted to occur within a potential high grade feeder structure.
Additionally, there are six holes with pending assays on the same drill traverse as, and immediately down-dip of
EHRC733, which have all intercepted visible Zn-Pb sulphide mineralisation recognised through portable X-Ray
Fluorescence (“XRF”) and logging.
Heritage clearance is currently being conducted which will allow Rumble to advance exploration of the Mato Prospect,
and importantly, allow the Company to test along strike and up-dip of EHRC733 within the previously outlined 9m x
3km area where multiple potential high grade feeder fault structures have now been interpreted.
Rumble Resources Limited - ASX: RTR
Page | 3
Figure 3 - Mato Prospect – Location plan with Drill Hole status and intersections
Figure 4 - Mato Prospect – EHRC733-740 geology section with significant assay results for EHRC733 highlighted
Rumble Resources Limited - ASX: RTR
Page | 4
Resource Expansion and Metallurgical Drilling Program
During the quarter, Rumble completed the necessary heritage surveys which will allow resource and metallurgical
drilling on E69/3464 to commence. Pending the receival of the final heritage report, the Company intends to
commence an approximate 1200m diamond drilling program in late October. This planned diamond drilling program
will provide sufficient metallurgical material for the Company to commence key beneficiation studies. The diamond
drilling will also target high-grade feeder fault related MVT type mineralisation underlying the Chinook, Navajoh and
Tonka deposits.
The heritage report will also provide the necessary clearance to complete infill and extension RC drilling and build
on the current global Mineral Resource Estimate (MRE) at the Chinook, Navajoh and Tonka deposits. This drilling
will occur concurrently with the ongoing discovery drilling at the highly prospective Mato Prospect.
Next Steps at the Earaheedy Project
•
Discovery and Resource drilling
o RC drilling aimed at defining the limits of the emerging world class Zn-Pb-Ag base metal system within
the Navajoh Unconformity Unit, with a focus on discovering new high-grade feeders (cf. Kalitan,
Chikamin, Colorado and Magazine Feeder Faults) within the currently outlined mineralised footprints in
E69/3464, and along the 12km Sweetwater Trend (ie. Mato Prospect) that occur within the 100% RTR
E69/3787 and E69/3862 tenements.
•
Metallurgical studies
o Variability and composite samples provided by diamond drilling will be collected to confirm the simple
and conventional flowsheet, and further improve the flotation performance. Additionally, value adding
beneficiation work (dense media separation and ore sorting) will commence once sufficient volumes
(>1000kg) of cored material have arrived from site.
•
Scoping studies
o Work will commence on initial supporting scoping studies for the Earaheedy Project following flotation
optimisation and beneficiation testing, which will review some of the early development
scenarios/options in 2024.
Maiden, pit constrained; Inferred Mineral Resource Estimate (MRE):
On the 19th April 2023, the Company released the maiden, pit constrained, Inferred Mineral Resource Estimate
(MRE) for the Earaheedy Zn-Pb-Ag Project. The maiden resource contained 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag
(at a 2% Zn+Pb cutoff) and was reported in accordance with the reporting requirements set out in the 2012 edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC
Code) (refer to Table A and ASX release 19 April 2023).
This maiden MRE confirmed the Earaheedy Project as one of the largest global zinc sulphide discoveries in the last
decade. The strength of the MRE is supported by a 41mt of higher-grade resources that could be part of a possible
early development scenario, and a much larger 462Mt resource that could potentially be upgraded via beneficiation,
providing the project with significant future flexibility.
Rumble Resources Limited - ASX: RTR
Page | 5
Table A: Maiden Inferred Mineral Resource tabulation for the Earaheedy Project.
Cut off
Zn+Pb
Inferred – Chinook
Inferred – Tonka and Navajoh
Inferred Total
Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag
%
Mt
%
%
%
g/t
Mt
%
%
%
g/t
Mt
%
%
%
g/t
0.5
334
1.3
0.9
0.4
2.3
128
1.5
1.2
0.2
1.9
462
1.3
1.0
0.3
2.2
1.0
135
2.1
1.5
0.6
3.4
59
2.3
2.0
0.4
2.6
194
2.2
1.6
0.5
3.1
2.0
63
3.0
2.1
0.8
4.6
31
3.3
2.8
0.5
3.4
94
3.1
2.4
0.7
4.2
2.5
39
3.4
2.4
0.9
5.2
25
3.5
3.0
0.5
3.6
65
3.4
2.6
0.8
4.5
3.0
24
3.8
2.7
1.1
5.7
17
3.9
3.3
0.6
3.8
41
3.8
3.0
0.9
4.9
4.0
7
4.7
3.3
1.5
6.8
5
4.9
4.1
0.8
4.3
12
4.8
3.6
1.2
5.7
Footnote: Inferred Mineral Resource is constrained within optimised pit shells and tabulated above at different economic Zn+Pb% cutoffs.
1.2
Other Projects, Western Australia
Braeside Base Metal Project, East Pilbara, Western Australia
Drilling has commenced at the Braeside Project targeting high grade Pb Zn Ag Au mineralisation. The program is
designed to test mineralisation extensions below coherent soil anomalies and gossans at the Barkers Well Prospect
where high grade shoots within pipe-like bodies have been delineated in earlier drilling campaigns.
The current exploration programme of slim line RC drilling will test strike extensions to known mineralised pipes
whilst diamond drilling will test for down-plunge extensions including a coincident chargeability and resistivity IP
anomaly. The IP anomaly is interpreted to represent disseminated pyrite and silica alteration associated with high
grade Pb Zn Ag Au mineralisation. Rumble looks forward to sharing the results of this drill campaign upon
completion and receipt of drillhole assay results.
No significant exploration activity was completed on the Company’s other regional projects (i.e., Fraser Range,
Warroo, Munarra Gully, Lamil and Western Queen). The Company continues to review opportunities for these
projects with the Company’s focus on rapidly advancing the emerging world class Earaheedy Zinc-Lead-Silver
Project.
2. CORPORATE
2.1 Managing Director Transition
On 15 September 2023 the Company announced changes to the Board of Directors as part of a planned transition
to the next stage of growth and development of the emerging world class Earaheedy Zn-Pb-Ag Project. The Company
noted that an executive search was well advanced for a new Managing Director, and the Company was very confident
of attracting a high-quality mining executive in the near term.
During the interim period respected geologist and mining professional Mr Peter Venn, was appointed as Interim
Managing Director to ensure focussed leadership and guidance.
On 25 October the Company announced the appointment of highly experienced mining executive and company
director Mr Peter Harold as the new Managing Director and CEO, effective from 12 February 2024.
Rumble Resources Limited - ASX: RTR
Page | 6
2.2 Cash and Investments
As at 30 September 2023, Rumble held $6.9 million in Cash.
Rumble announced a capital raising comprising of a $8.1 million placement to institutional investors, which resulted
in the issue of 54 million shares and a $3m Share Purchase Plan (SPP) – refer to ASX release dated 11 August
2023. Pursuant to the end of the quarter, the Company announced to the ASX on the 5th of October 2023, that the
SPP had raised $520k with the issue of 3.8 million shares. The Directors contributions in the capital raise will be
completed after approval is provided at the AGM on the 23rd November.
2.3 Appendix 5b – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling A$3.5 million.
Cash outflows for the September 2023 Quarter totalled $4.7 million across exploration activity (75%), staff costs
(15%), administration and corporate costs (10%).
Cash inflows for the September 2023 Quarter totalled $985k consisting of proceeds from the fuel tax credits (52),
Government grant funding (28%) and interest received (21%).
2.4 Appendix 5b – Payments to related parties and their associates
Payments to related parties and their associates totalled $148k for the September 2023 quarter, consisting of
Technical Management, Executive and Non-Executive Director fees and salaries, geological consulting, and
superannuation payments.
2.4 Tenement Holdings – Tenement Holdings
In accordance with ASX Listing Rule 5.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Peter Venn, Interim Managing Director of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble is firmly focussed on rapidly advancing the major Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since the major
Zn-Pb-Ag-Cu discovery in April 2021 scoping and broad spaced infill drilling has rapidly uncovered an emerging world class scale Zn-Pb-AgCu base metal system, with interpretative geology and drilling continuing to make new discoveries and highlight multiple large-scale deposit
targets. In April 2023, Rumble announced a maiden, pit constrained, Mineral Resource Estimate of 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a
2% Zn+Pb cutoff) at Earaheedy. The focus of the geological team remains the targeting, delineation and extension of the high-grade Zn-Pb
feeder zones that continue to be discovered contemporaneously with the evolving structural and geological understanding. Recent discoveries
of the high-grade Chikamin Feeder Zone and the results of the recent geophysical and geochemical surveys has greatly increased Rumble’s
confidence in defining multiple new high grade mineralised feeder zones within the Earaheedy Project’s boundaries. Rumble’s board and
management team has a successful track record in making discoveries and project development.
Rumble Resources Limited - ASX: RTR
Page | 7
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy and other Rumble Projects is based on and fairly represents
information compiled by Mr Luke Timmermans , who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is a full-time
employee of Rumble Resources Limited,. Mr Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources in relation to the Earaheedy Project is based on and fairly represents
information compiled under the supervision of Mr Mark Carder who is a Member of the Australian Institute of Geoscientists (AIG) and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is
undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. The Company confirms that it is not aware of any new information or data that materially affects the
Mineral Resource information included in the Announcements.
The Information in this announcement that relates to prior Exploration Results for the Earaheedy Project is extracted from the following ASX
announcements:
-
5th October 2023 – High Grade Zinc-Lead intersected at the Mato Prospect
17th July 2023 - Zinc Lead Mineralisation Discovered in Drilling
1st June 2023 - High impact drilling commences at the Earaheedy Project
3erd May 2023 - Heritage Clearance Received for Navajoh Southeast Trend
19th April 2023 - Maiden Mineral Resource - Earaheedy (Zn-Pb-Ag) Joint Venture
14th March 2023 - Chinook Zn-Pb Prospect expands to 8km strike.
16th February 2023 - Multiple New High-Grade Feeder Targets Defined
5th December 2022 - Drilling Results from Lamil Gold-Copper Project
17th November 2022 - Exceptional Metallurgical Results at Earaheedy Project
3rd November 2022- High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information included
in the Announcements. The Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the Announcements. The Company confirms that it is not aware of any information or data that materially affects
the information included in the relevant market announcement and all material assumptions and technical parameters underpinning the
estimates in the original announcement in respect of the Earaheedy MRE continue to apply and have not materially changed.
Rumble Resources Limited - ASX: RTR
Page | 8
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Thunderdome
E28/2366
Granted
Western Australia
30% Note 2
Thunderbolt
E28/2924
Granted
Western Australia
100%
Thunderbolt
E28/3062
Granted
Western Australia
100%
Thunderbolt
E28/3065
Granted
Western Australia
100%
Thunderbolt
E28/3240
Granted
Western Australia
100%
Thunderbolt
E28/3219
Granted
Western Australia
100%
Thunderbolt
E28/3220
Granted
Western Australia
100%
Thunderbolt
E28/3221
Granted
Western Australia
100%
Thunderbolt
E28/3313
Application
Western Australia
100%
Thunderbolt
E28/3344
Application
Western Australia
100%
Thunderbolt
E28/3352
Application
Western Australia
100%
Thunderclap
E28/2972
Granted
Western Australia
100%
Squall
E28/3155
Granted
Western Australia
100%
Braeside
E45/4873
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/2032
Granted
Western Australia
100%
Warroo
E45/5366
Granted
Western Australia
100%
Warroo
E45/5689
Granted
Western Australia
100%
Warroo
E45/5860
Application
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4063
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Rumble Resources Limited - ASX: RTR
Page | 9
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Earaheedy
E69/4138
Application
Western Australia
100%
Earaheedy
E69/4124
Granted
Western Australia
100%
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4165
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Earaheedy
E69/4178
Application
Western Australia
100%
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Western Queen
M59/0045
Granted
Western Australia
100%
Western Queen
M59/0208
Granted
Western Australia
100%
Western Queen
L59/40
Granted
Western Australia
100%
Western Queen
E20/0967
Granted
Western Australia
100%
Western Queen
E59/2443
Application
Western Australia
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Earaheedy
E69/4178
Application
Western Australia
100%
Thunderbolt
E28/3352
Application
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 10
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderbolt
E28/3344
Surrendered
Western Australia
100%
Rumble Joint Ventures - Notes
1. Earaheedy Project, Western Australia
E69/3464 75% RTR / 25% Zenith Minerals
M69/0150 75% RTR / 25% Zenith Minerals
L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
E28/2528, E28/2529, E28/2595, E28/2366 - IGO 70% / RTR 30%
3. Munarra Gully, Western Australia
E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
E45/5270, E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited - ASX: RTR
Page | 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Rumble Resources Limited
ABN
Quarter ended (“current quarter”)
74 148 214 260
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(720)
(720)
(e) administration and corporate costs
(488)
(488)
-
-
20
20
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
78
78
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(1,110)
(1,110)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(15)
(15)
(c) property, plant and equipment
(21)
(21)
(3,474)
(3,474)
(e) investments
-
-
(f)
-
-
(a) entities
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(3,510)
(3,510)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
7,844
7,844
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(553)
(553)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
7,291
7291
Cash and cash equivalents at beginning of
period
4,179
4,179
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,110)
(1,110)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(3,510)
(3,510)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
7,291
7,291
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
6,850
6,850
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
6,802
4,131
5.2
Call deposits
48
48
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6,850
4,179
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
148
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
68
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(1,110)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(3,474)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(4,585)
8.4
Cash and cash equivalents at quarter end (item 4.6)
6,850
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
6,850
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.49
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes, as per the Capital Raising Announcement dated 11 August 2023, the
Company completed the SPP on the 5 October 2023 and the Directors contributions
will be completed after approval is provided at the AGM in November.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, the Company is continuing to reviewing various funding options. Based on
previous capital raisings it believes any funding activities will be successful.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, based on the Company having the ability raise additional capital.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives
Share your feedback
Discover