Western Queen Exploration and Development Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
1 October 2025
Western Queen Exploration and
Development Update
Key points
•
•
•
•
Exploration
o
Diamond drilling on track to commence this week
o
The drill program is primarily designed to grow the 23 July 2025 Mineral Resource Estimate
(MRE) upgrade of 370,000 ozs at 3.1g/t gold 1 and is on track to commence this week
Potential Mine Development
o
A preliminary assessment on underground mine development at Western Queen South and
Central demonstrated a potentially compelling option, a scoping study is now being progressed
o
MEGA continue to look at open pit options
Third party ore processing
o
Discussions with potential ore purchasing parties ongoing
o
A draft toll treating agreement has been received
Potential tungsten revenue stream
o
Maiden tungsten MRE of 13.2kt of WO3 2 reported in August 2025
o
Metallurgical testwork planned to determine if a tungsten revenue stream can be generated in
combination with the potential gold revenue stream
Peter Harold, Managing Director and CEO commented:
“Following the recent capital raising the Company is now well funded to progress Western Queen with the
dual aims of growing the gold and tungsten resources and moving the project into production.
Resource extensional drilling is on track to commence this week with up to 20,000 metres of diamond drilling
planned below the current known mineralisation at Western Queen South and Central. We will also be looking
to grow the recently reported tungsten resources given the tungsten mineralisation is spatially adjacent, and
sub-parallel to, the high-grade gold.
Optimisation of the proposed Western Queen South open pit has been completed to incorporate the new
resource estimate announced in July 2025. A preliminary underground mining study of both the Western
Queen South and Central deposits was positive, and we are now undertaking a more detailed scoping study.
While we progress towards gold production targeting late calendar year 2026 we recently released the
maiden Western Queen tungsten Resource and will now complete a metallurgical testwork program to
determine how we can unlock a revenue stream from the tungsten.”
1 Refer Company’s ASX release dated 23 July 2025
2 Refer Company’s ASX release dated 5 August 2025
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
1
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) provides this update on the upcoming
exploration program and potential development of the Western Queen Gold Project.
Exploration – diamond drill program on track to commence this week
•
Gold exploration – infill and extension diamond drilling
The Company is planning a diamond drill program of up to 20,000m at Western Queen which is on track to
commence this week. The drilling contact has been awarded to well-known Western Australia drilling contractor
DDH1 Drilling (DDH1) and the first rig is being mobilised to site this week. DDH1 will supply two diamond rigs,
and it is anticipated that the program will be completed by February 2026.
Figure 1 – Western Queen South longitudinal section showing gram x metre contours, select drill hole
intersections and proposed extensional drilling (red circles, below the current MRE) and proposed infill
resource conversion drilling (blue circles)
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
2
The key focus of this diamond drill program is to target high-grade down plunge extensions at Western Queen
South (refer to Figure 1) and Western Queen Central deposits (refer to Figure 2) to grow the recently updated
Western Queen gold Mineral Resource Estimate (MRE) of 3.72Mt @ 3.1g/t Au for a total of 370,000 oz Au. A
small portion of the proposed drilling program will infill the existing Western Queen South MRE which currently
stands at 2.32Mt @ 2.66g/t Au for 198,900 oz 3, with the aim of converting a portion of the existing Inferred
Resources to Indicated Resources in support of the ongoing underground mining scoping study. It is anticipated
that the proposed drilling will provide the basis for a future update of the Western Queen MRE in early 2026.
Figure 2 – Western Queen Central and Princess longitudinal section showing gram x metre contours,
select drill hole intersections and proposed extensional drilling (red circles, below the current MRE) and
proposed infill resource conversion drilling (blue circles)
The proposed diamond drilling program will also be used to target tungsten skarn lodes, which are spatially
adjacent, and sub-parallel to, the high-grade gold lodes. The Company recently announced a maiden Western
Queen tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2Kt WO3 at a 0.1% WO3 cut-off which contains a highergrade portion of 1.44Mt @ 0.51% WO3 for 7.4Kt WO3 at 0.3% WO3 cut off (see Figure 3 and Table 1).
3 Refer Company’s ASX release dated 23 July 2025
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
3
Geological investigations and petrographic studies have confirmed tungsten mineralisation at Western Queen
represents an early prograde endoskarn mineralisation event which predates orogenic gold mineralisation.
Petrographic studies have also confirmed that the observed tungsten mineralisation observed to date represents
a very distal skarn mineralisation environment. The upcoming drill program will assist in developing the
understanding of tungsten mineralisation at Western Queen, as well as underpin a potential future tungsten
MRE update.
Figure 3 – Maiden Western Queen Tungsten MRE showing extents of WO3 lodes and diagrammatic
contoured block grades displaying emerging high-grade trends and select significant WO3 intercepts
Mining Studies – open pit and/or underground options
•
Western Queen Open Pit Option
MEGA Resources Pty Ltd (MEGA) has updated the mining schedule for the Western Queen South open pit taking
into consideration the 23 July 2025 MRE upgrade. The revised schedule shows the production over a two-year
period from a combination of Western Queen South, Princess and Cranes.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
4
The revised schedule results in a working capital investment by Bain Global Resources (Bain) in excess of the $35
million ($25 million working capital facility and up to $10 million cost overrun facility) referred to in the 28
November 2024 Term Sheet (the Term Sheet) 4.
MEGA have since prepared a smaller Western Queen South open pit option which is being reviewed by the
Company. This option could allow for open pit mining ahead of, or in conjunction with underground mining.
•
Western Queen South and Central Underground Option
In parallel with the open pit project Rumble initiated a “proof of concept” underground mining study. The
outcome of the preliminary underground study demonstrated very favourable economics. As a result, a detailed
scoping study on mining both Western Queen South and Central from underground is now being undertaken and
should be delivered early in the December 2025 quarter.
•
Expiry of Term Sheet with Bain and MEGA
Given the need to complete to the original open pit mine optimisation, complete the underground scoping study
and secure an ore purchase or toll milling arrangement with one of the gold processing plants in the vicinity of
Western Queen, the decision was made to defer the signing of the Definitive Agreements contemplated by the
28 November 2024 Term Sheet (the Term Sheet) pending the outcome of these various work streams.
Consequently, the parties mutually agreed to extend the execution date of the Definitive Agreements as detailed
in the Term Sheet to 30 September 2025 Notwithstanding that the Term Sheet has expired, the Company intends
to complete the underground scoping study and review of the underground option compared to the open pit
options which have been presented.
Figure 4 – Location of Western Queen Project in relation to gold processing plants within a 200km radius
4
Rumble ASX release date 28 November 2024
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
5
Third party processing
Discussions have continued with the owners of gold processing plants in the vicinity of Western Queen. A draft
ore tolling agreement has been received from one of these groups and is being reviewed by the Company.
Potential Tungsten Revenue Stream
The maiden Western Queen tungsten Mineral Resource Estimate of 4.3Mt at 0.31% WO3 for 13.2kt WO3 was
released on 23 August 2025 and is summarised in Table 1.
Preliminary metallurgical testwork results indicate tungsten recoveries that could yield an economic return to
the Company. This needs to be verified by detailed metallurgical testwork and further study work. A bulk sample
of the tungsten bearing (scheelite) material has been prepared for detailed metallurgical testing. This
metallurgical testwork program will commence during the December 2025 quarter.
Authorisation
This announcement is authorised for release by the Board of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au
Peter Harold
Peter Venn
Trevor Hart
Managing Director & CEO
Technical Director
Chief Financial Officer
Rumble Resources Limited
Rumble
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Resources
Limited
Rumble Resources Limited
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
6
About Rumble
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold Project which is being
developed to deliver near term cash flow from the existing resources and resource growth through future
exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the
capabilities of the exploration team to find world class orebodies.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX
market announcements released on the date noted in the body of the text where that reference appears. The previous market
announcements are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
7
Share your feedback
Discover