Braeside Drilling Commences - Targeting High Grade Zn Pb Cu
Released
Released
Announcement PDF
14th November 2017
Drilling has commenced targeting high grade Zinc, Lead
Rumble Resources Ltd.
and Copper at the Braeside Project, Pilbara WA
Stage 5 Exploration - Drilling at E45/2032
• Drilling has commenced targeting high-grade base metal mineralisation and EM
conductors which may represent first order porphyry related (including VMS)
polymetallic mineralisation.
• The high grade base metal target areas have grades up to 29.31% Zn, 79% Pb,
17.48% Cu, 325 g/t Ag, 13 g/t Au and V 1.03% throughout the 30km strike.
• Drilling will consist of a 2000m RC drill program targeting approximately 10-15
untested areas.
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to
announce that the first modern drilling program at the Braeside Project (E45/2032),
located in the Pilbara region of Western Australia, has commenced.
The drilling programme will consist of approximately 2,000m of RC drilling. Rumble has
the capacity to extend the drill program, depending on results.
Rumble Resources Ltd
ABN 22 102 912 783
Suite 9, 36 Ord Street,
West Perth, WA 6005
35
Richardson
Street
T
+61
8
6555
3980
WEST PERTH WA 6005
F +61 8 6555
PO
Box 3981 1916
West Perth WA 6872
rumbleresources.com.au
ASX RTR
ASX : CXU
Executives & Management
88.7 M ordinary shares
Mr Shane Sikora
13.2
M unlisted
options
Managing
Director
Mr Brett Keillor
Market
Cap
Technical
$27.5
millionDirector
(@31c)
Mr Matthew Banks
Non-executive Director
Board of Directors
Mr Michael Smith
Tony
Sage
Non-executive Director
Executive Chairman
Mr Steven Wood
Brett
Company SecretarySmith
Executive Director
Qiu
Derong
Non-executive Director
Kent
Hunter
Non-executive Director
Stephen
Brockhurst
Company Secretary
Image 1 – Strike Drilling rig operating at Braeside Project – November 2017
Image 2 – Braeside Project Location, Geology and Prospect Map
RC Drill Targeting
Targeting has utilised preliminary MLTEM (Moving Loop Transient Electromagnetic survey) conductors (follow
up of VTEM conductors), recent grab sampling, base metal in soil geochemical trends and reconnaissance
prospecting to optimise priority targets for the current phase of RC drilling.
Rumble is drilling a small portion of the targets identified within E45/2032. Rumble has put in place plans to
access these other identified targets after this current program, to generate further high order drill targets in early
2018.
The current programme will be the first modern RC drilling conducted at Braeside since 1951 and accordingly,
drilling conditions and depth to potential mineralisation is unknown.
Over ten target areas are planned to be tested along 30km of strike. Targets included are known historic
prospects that have returned very high-grade Zn, Pb and Cu grab sampling results and recent exploration results
that have highlighted wide alteration zones associated with the high-grade base metal surface mineralisation.
The MLTEM programme (stage 4) has been completed and preliminary results have highlighted eight (8) low
order early time conductors that correlate with known north trending mineralised structures. Some of the
conductors will be tested by the current RC drill programme.
Image 3 – Ragged Hills Mine Area Location Plan (see Image 2 for Location)
Soil Sampling Contours (Zn), Grab Sampling Results, Mineralised Structures and RC Drill Targets.
Image 4 – Ragged Hills East Area Location Plan (see Image 2 for Location)
Cassius Clay Prospect – Zn+Pb Contouring, Grab Sample Results, MLTEM Conductor and RC Drill Target
High-grade base metal grab sampling results associated with the main mineralised structure that extends northnorthwest of the historic Ragged Hills Pb mine RC drill targets will be priority targets for the Ragged Hills Mine
area (Image 3). Grab sampling by Rumble along the main steep east dipping mineralised structure (silica – sericite
alteration) returned significant results (refer RTR ASX announcement - 16 October 2017) including:
• Pb – 42.8%, 31.5% and 30.7%
• Zn – 17.3%, 7.1%
• Cu – 15.1%
At the Cassius Clay Prospect (Ragged Hills East Area – Image 4), strongly mineralised and altered structures
converge and up to 5 northwest trending zones have been identified. The mineralisation at surface is steep
northeast dipping and a low order MLTEM conductor has been inferred within the footwall to the main structure.
Grab sampling by Rumble (refer RTR ASX announcement - 16 October 2017) has returned high-grade
mineralisation at surface with results including:
• Pb – 44.6%, 44.3%, 37%, 31.5%, 28.6% and 19.9%
• Cu – 17.5%
• Ag – 90 g/t, 77 g/t, 63 g/t and 48 g/t
A major altered and mineralised northwest trending and steep north east dipping structure with high grade surface
base metal mineralisation associated with small scale artisanal workings at the Devon Cut Prospect (see
Image6) is the main RC drill target. Grab sampling by Rumble (refer RTR ASX announcement - 16 October 2017)
returned high-grade Pb and Zn mineralisation with strongly elevated Ag, Au and V. Results include:
• Pb – 32.7%, 29.5% and 23.2%
• Zn – 14.4% and 6.3%
• Ag – 85 g/t, 59 g/t and 38 g/t
• Au – 0.37 g/t and 0.17 g/t
• V – 1% and 0.85%
At the Hitman Hearns Target (see Image 7), the recent MLTEM survey has defined a 1.8km long low order early
time conductor closely associated with a major north trending structure. The structure is in contact to flat west
dipping carbonates, shales and cherts to the west and andesitic basalts to the east. Previous grab sampling
completed by earlier explorers have returned copper mineralisation in flat lying cherts immediately west of the
major structure. Reported rock chip sampling returned up to 5.3% Cu (refer RTR ASX announcement - 11 May
2017)
Multiple (four) low order early time MLTEM conductors are closely related to major north trending structures at
the Barker Well Prospect (see Image 8). At the Barker Well Prospect, a wide zone of silica – sericite alteration
returned strong base metal mineralisation and will be RC drill tested. Nearby a small historic working returned up
to 38.1% Pb with elevated Zn (0.8%) and Cu (0.4%) (refer RTR ASX announcement - 16 October 2017).
Other targets (refer RTR ASX announcement - 16
October 2017) that will be tested by the current
RC drill programme include:
•
Sugar Ramos (see Image 2 for location)
– very high grade Pb - 42.7% and 27.6%,
Ag 72 g/t and strongly anomalous Au –
1.45 g/t associated with strong barium
and potassium alteration represents a
new occurrence.
•
Mt Brockman (see Image 2) – high grade
Pb – 12.3% with strong barium and
potassium alteration located at historic
workings.
Image 5 – Sugar Ramos New Discovery
Image 6. - Devon Cut Prospect Location Plan
Grab sampling Results, Zn in Soil contouring and RC Drill Target
Image 7. – Hitman Hearns Target Location Plan
RC Drill Target, Main Structure and Low Order MLTEM Conductor
Image 8. – Barker Well Prospect Location Plan, RC Drill Targets,
Main Structure, Low Order MLTEM Conductors and Barker Well Grab Sampling
Background to Systematic Exploration Process of High Grade Zn – Pb – Cu – Ag - Au – V at the
Braeside Project (E45-2032)
The Braeside Project E45-2032 consists of multiple high-grade zinc, lead, copper and silver deposits and
occurrences associated with north to northwest trending fault fracture zones within mafic volcanics and
volcaniclastics over a strike of at least 60 km. The poly-metallic mineralisation has not been tested by detailed
geophysics, geochemistry and very limited drilling with only 10 known historic drill holes in 1928 and 1951.
High grade grab sampling assays have returned up to 29.31% Zn, 79% Pb, 17.48% Cu, 325 g/t Ag, 13 g/t Au
and V 1.03% along 30km of strike within a potential 60km strike system.
Rumble’s exploration program is the first modern systematic exploration program being undertaken at the
Braeside High Grade Zinc – Lead Project.
Recent litho-geochemistry completed by Rumble suggests the mineralisation is associated with sub volcanic
rhyolitic porphyry (Koongaling Felsic Volcanics) indicating potential for a VMS system capable of hosting a large
base metal deposit.
Rumble’s technical team lead by Technical Director Mr Brett Keillor is systematically exploring the Braeside
Project generating first order VMS feeder pipe targets using proven, modern exploration techniques.
Stage
Exploration Activity
Progress
Stage 1
Regional soil geochemistry (multi-element) to cover
Braeside Project Area
100% Completed
Stage 2
Fly Airborne VTEM
100% Completed
Stage 3
Infill geochemistry over metal trends and conductors
generated by VTEM in Stage 2 to help rank key drill
targets
100% Completed
Stage 4
Ground TEM surveys over the identified VTEM
conductors and high-grade base metal mineralisation
100% Completed
Stage 5
Drill test conductive plates and high-grade base metal
mineralisation
Commenced
Image 9. – Historic Artisinal Ragged Hills Pb-Zn-Ag Mine operated up until 1959
Shane Sikora
Managing Director
- ENDS For further information visit or contact enquiries@rumbleresources.com.au
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was established with the
aim of adding significant value to its current gold and base metal assets and will continue to look at mineral acquisition opportunities both in Australia and
abroad.
Forward Looking and Cautionary Statement
The information in this report that relates to exploration results from work completed by Rumble.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Brett Keillor, who is a Member of the Australasian
Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Keillor is an employee of Rumble Resources Limited. Mr Keillor has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Keillor
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral
tenement and
land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Commentary
•
The project comprises of a single
granted exploration license – E45/2032.
•
The license is currently owned by
Maverick Exploration Pty Ltd. Rumble
Resources has an earn in JV
agreement
•
The license is granted, in a state of
good standing and has no known
impediments to operate in the area.
•
In addition to the granted EL, Rumble
hold 100% of five (5) contiguous EL
applications with a total area of
1000km².
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
•
Exploration solely completed by
Rumble Resources
Geology
•
•
Target is Zn, Pb, Cu and precious
metals. Deposit type is conceptual.
Porphyry related (including VHMS)
polymetallic deposit type
Drill
hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
•
No drilling reported
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•
No drilling completed
Relationship
between
mineralisation
widths
and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
•
Not applicable – no drilling completed
Deposit type, geological setting and style of
mineralisation.
Criteria
JORC Code explanation
Commentary
known’).
Diagrams
Balanced
reporting
Other
substantive
exploration
data
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
•
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples –
size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
•
Image 1 – Strike Drilling Rig operating
at Braeside Project – E45/2032
•
Image 2 – Project location plan with
location of latest prospects/targets as
highlighted in this report.
•
Image 3 - Ragged Hills Mine Area
Location Plan, Soil Sampling Contours
(Zn),
Grab
Sampling
Results,
Mineralised Structures and RC Drill
Targets. The base map is high
resolution RGB GeoEye -1 and
WorldView 3 40cm Imagery
•
Image 4 - Ragged Hills East Area
Location Plan, Cassius Clay Prospect –
Zn+Pb Contouring, Grab Sample
Results, MLTEM Conductor and RC Drill
Target. The base map is high resolution
RGB GeoEye -1 and WorldView 3 40cm
Imagery
•
Image 5 – Sugar Ramos New Discovery
•
Image 6 - Devon Cut Prospect Location
Plan, Grab sampling Results, Zn in Soil
contouring and RC Drill Target. The
base map is high resolution RGB
GeoEye -1 and WorldView 3 40cm
Imagery
•
Image 7 – Hitman Hearns Target
Location Plan, RC Drill Target, Main
Structure and Low Order MLTEM
Conductor. The base map is high
resolution RGB GeoEye -1 and
WorldView 3 40cm Imagery
•
Image 8 – Barker Well Prospect
Location Plan, RC Drill Targets,Main
Structure,
Low
Order
MLTEM
Conductors and Barker Well Grab
Sampling. The base map is high
resolution RGB GeoEye -1 and
WorldView 3 40cm Imagery
•
Image 9. – Historic Artisinal Ragged
Hills Pb-Zn-Au Mine operated form 1901
to 1959
•
The contouring on images 3,4 to 6 are
based on thresholds derived from
“natural breaks” and 98th percentile
(The range may vary).
•
Although percentiles were not used, the
98th percentile for the 1662 sample
dataset are:
•
Zn - >240 ppm
•
Pb - >244 ppm
Moving loop electromagnetic (MLEM)
survey: The MLEM survey was managed by
Khumsup Pty Ltd. The MLEM survey was
conducted within the E45/2032 project area.
Key specifications of the MLEM survey are:
Stations Spacing: 200m
Loop: 400m, 200m
Criteria
JORC Code explanation
contaminating substances.
Commentary
Line Spacing: 200m
Components: x y z
Orientation: X along line (local east ‐
positive).
Line direction: 180, 90 degrees
Frequency: 0.5, 0.25 Hz
Channels: SMARTem Standard.
Receiver: Fluxgate
Number turns: 1
Current: Typically 50 A.
Repeats: Minimum 3 consistent readings
per station.
•
Further work
• The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
Preliminary modelling has
defined eight (8) low order,
early time conductors.
Most correlate with the
previous Maxwell late and
early time VTEM
conductors announced 4th
September 2017 and 16th
October 2017.
Further work will be dependent
on any drilling results achieved
from this drill program.
Share your feedback
Discover