Quarterly Activities Report
Released
Released
Announcement PDF
June 2015 Quarterly Activities Report
Corporate
Rumble Resources Ltd
Strong cash position of $1.7M to advance preparations for the next
stage of exploration at its Fraser Range projects
Zanthus Project
Rumble completed maiden drill program of five RC/diamond holes
targeting a cluster of five bedrock conductors identified through
geophysics
Thunderdome Project – Rumble 100%
Suite 9, 36 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Thunderdome Project acquired covering 140sq km’s in the main
Fraser Range Gravity high with a distinct dome feature
Executives & Management
Limited previous drilling of 2 Aircore holes completed to date include
an intersection of 6m @ 0.11% Cu & 0.28% Zn from 51m.
Mr Shane Sikora
CEO
High Quality aeromagnetic dataset acquired
Mr Terry Topping
Executive Director
Thunderstorm Project – Rumble 100%
3 Strategic exploration applications in close proximity to Buxton
Resources’ prospective Zanthus Project Conductors
Rumble Resources Ltd (“Rumble” or “the Company”) is pleased to provide an update
of the Company’s activities. During the quarter Rumble focussed its activities in the
Fraser Range.
Mr Andrew McBain
Non-executive Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Bruno Seneque
Company Secretary
Figure 1 Rumble Fraser Range Holdings
Activities Overview
Rumble completed its maiden drill program at the Zanthus Project Fraser range. Rumbles technical team are
continuing to review the outcome of the program and will assess the results of the DHEM, and an ongoing ground EM
program, assays and petrology as it comes to hand to help determine with the next phase of exploration.
Rumble also expanded its footprint in the highly sought after Fraser Range Province. The new 100% Rumble owned
exploration license expands Rumbles’ Fraser Range foot print to 3,590 sq km. The Thunderdome Project was a
strategic low cost acquisition which will enable the Company to utilise its cash for high impact exploration. Importantly
Rumble Owns a 100% interest in 13 out of the 14 Fraser Range tenements.
Corporate
The company is committed to conducting further exploration activities across its existing pipeline of targets, in the
Fraser Range. Rumble with $1.7m is fully funded to advance preparations for the next stage of exploration at its
other Fraser Range projects including Big Red and the Thunderdome Project. At the recently acquired
Thunderdome current exploration will include analysing the high quality aeromagnetic data, gravity and
geochemical data sets. Once this has been completed a comprehensive exploration program will be put together
which will include targeted geophysics and follow up drill programs.
The Company will provide an update on upcoming exploration activities within its Fraser Range portfolio in the
near future.
Zanthus Project, Fraser Range
The Zanthus Project is located 20km’s east of the Nova-Bollinger nickel copper massive sulphide discoveries in the
Fraser Range, Western Australia. Rumble is earning up to 75% from Blackham Resources Ltd (ASX:BLK).
As part of Rumbles systematic exploration program Rumble completed a regional gravity survey covering the entire
Zanthus Project looking to identify dense intrusive bodies that may represent Fraser Range Gabbro intrusions. The
detailed gravity readings were on 500m by 500m spacing with closer spaced infill readings around gravity highs
identified. The program identified areas of high density located in the southern portion of the tenement. Significantly the
high density locations are surrounding and coincident with the 5 bedrock conductors at the Zanthus eye.
Following the complétion of the gravity survey Rumble completed it’s maiden drill program at the Zanthus Project. The
drill program consisted of five RC/diamond holes targeting a cluster of five bedrock conductors in and around an eye
feature identified through geophysics.
All five drill holes were pre collared with RC and NQ diamond tails were completed to the target zones. A total of five
holes were completed for 1081m, four holes intersected graphitic schists which are interpreted as being the target
conductors.
Hole ZNDD002 targeting ZC1 and hole ZNDD004 targeting ZC3 intersected wide zones of quartz biotite garnet gneiss
with graphitic zones also
containing minor sulphides
including chalcopyrite.
ZNDD005 targeted ZC5 and
intersected a wide zone of
medium grained leucogabbro
down to 200m. This then
transitioned
into
quartz
biotite garnet gneiss with a
graphitic zone from 260m to
282m.
ZNDD001 targeted ZC4 and
intersected
a zone of
medium
grained
mafic
granulite down to the end of
hole at 150.9m. This hole did
not intersect any conductive
material.
Figure 2 &3: Drill Hole locations into a cluster of 5 bedrock conductors
A downhole EM program has been completed with preliminary data highlighting bedrock conductors consistent with the
geology observed in the recent RC and diamond drill program.
The RC chips and diamond core have been logged on site and are being transported to Perth for multi element testing
and also for petrology to be completed. The assaying and petrology will provide valuable information in
characterisation studies of local geology of the area.
A ground EM program covering additional high gravity areas is nearing completion and results and targets from this
program will be released once the final data has been received and processed.
Thunderdome Project – 100% Rumble
During the quarter Rumble acquired the highly
prospective Thunderdome Project which was a
strategic low cost acquisition which will enable the
Company to utilise its cash for high impact exploration.
The Thunderdome Project (E28/2366) covers 140sq km’s
in the main Fraser Range Gravity ridge associated with
dense mafic/ultramafic rocks of the Fraser Range.
The project is adjacent to the Rockford project recently
acquired by Legend Mining (ASX:LEG) off the Creasy
Group as announced on 2 July 2015. It has a large
prominent dome feature clearly visible on regional
airborne magnetic images. This large dome feature is one
of the largest in the Fraser Range and has a fold axis of
some 22km. Within this larger target area are also several
smaller features which may represent later stage
intrusions.
Previous exploration for nickel and copper has recently
been carried out by Ponton Minerals which is part of the
Creasy Group. This regional exploration was of
reconnaissance air core drilling on a 5km by 15km
spacing with two holes within the current project area of
E28/2366. One of the historic aircore drill holes
(PNAC036) was highly anomalous in copper and zinc.
Drill hole PNAC036 returned an intersection of 6m @
0.11% Cu & 0.28% Zn from 51m (EOH 109.5m). This
intersection was within a carbonaceous unit which is part
of the cover sequence.
Figure 4: Thunderdome Project – Magnetics with drill hole locations.
Work completed to date included:
a recent 100m spaced airborne magnetic survey
reprocessing of regional gravity data
petrology on EOH rock chips from NAC036
Key Term of the project sale:
Rumble acquired 100% for $60k cash payment
Figure 5: Thunderdome Project – located in main Fraser Range Gravity ridge
Thunderstorm Project – 100% Rumble
Applications E28/2527, E28/2528 and E28/2529 covers 160sq km’s in the Fraser Range. There are portions
of these tenements that are subject to competing tenement applications and Rumble have lodged ‘objections
to grant’ which is scheduled for Kalgoorlie Wardens Court. These applications abut the Buxton Resources
Ltd prospective Zanthus project that are currently RC drill testing 2 high priority conductors on the project.
Previous drilling by Buxton identified three separate zones of finely disseminated, magmatic nickel-copper
sulphides at their Zanthus project. The presence of magmatic nickel sulphides within mafic to ultramafic
intrusive rocks (similar to the host rocks at Nova- Bollinger) indicates that the project is highly fertile and
prospective for the discovery of nickel-copper sulphide mineralisation.
Application E28/2523 covers 206 sq km’s in the Northern Foreland of the Albany - Fraser Range. This has
been interpreted to host similar intrusive features to that being explored by Windward Resources Uraryie and
Uraryie South Prospects. Drilling in December 2014 of the Urayie prospect returned anomalous nickel
assays up to 0.55% Ni. Initial drilling of the Uraryie South Intrusive complex is planned for Q2 of FY16
following completion of a heritage survey.
Figure 6: Thunderstorm Project tenement locations
Big Red Project – 100% Rumble
No exploration was completed during the quarter. The Big Red Project is located 450 kilometres east of Kalgoorlie
in the Fraser Range Western Australia.
A maiden drill program was completed in the December quarter consisting of 4 Mud Rotary/Diamond drill holes
totalling 1,503.9m with the programme designed to test a 2km EM conductor outlined by a high powered ground
EM survey
Rumble received all assays from its maiden drill program with the assays confirming all three holes intersected
large disseminated mineralised sulphide zones within gabbros of the Fraser Range Complex. These sulphide
zones are of considerable widths and indicate this large conductor to be a significant mineralised system.
Intersecting Fraser Range gabbro is of significance as it is the rock unit which can host magmatic Ni-Cu
sulphide deposits.
Detailed petrographic analysis of samples collected from the recent diamond drill program has confirmed the
presence of magmatic sulphides. Nickel (pentlandite) and Copper (chalcopyrite) sulphides in association with
pyrrhotite and magnetite are present within Fraser Range gabbro.
Following the drilling Rumble completed a Downhole EM Program which identified 2 very high conductance off
hole conductors of 6000 to 8000 siemens which can be typical of massive sulphide accumulations. It is noted
that the petrology has not indicated any conductive units within the lower portion of hole BRDD003. Hole
BRDD002, which is located 400m to the south, contains the mineralogy present in magmatic nickel copper
feeder systems with sulphides of pyrrhotite, chalcopyrite pentlandite and also magnetite. This now makes
these off hole conductors first order targets in the company’s exploration of the Fraser Range.
Very High
Conductance Off
Hole Conductors
6000-8000 Siemens
Figure 7. Model of 2 conductors of high conductance surrounding hole BDD003.
Sidewinder Project, RTR owns 100%
No exploration was completed.
Beadell Project, Western Australia
No exploration was completed.
Canegrass Project Western Australia
No exploration was completed.
Burkina Faso Permits, West Africa
Management of the Burkina Faso permits was on-going during the quarter. Rumble has in-country management and also has appointed an
expatriate with extensive in-country experience to manage the company’s affairs in Burkina Faso.
Shane Sikora
CEO
- ENDS -
For further information visit rumbleresources.com.au or contact enquiries@rumbleresources.com.au.
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was established with
the aim of adding significant value to its current gold and base metal assets and will continue to look at mineral acquisition opportunities both in
Australia and abroad.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Terry Topping, who is a Member of the
Australasian Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Topping is a fulltime employee of Rumble Resources
Limited and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Topping consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Appendix
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement Number
Status
Location
Beneficial
Percentage
Interest
Beadell
E45/2405
Granted
Western Australia
80%
Granted
Western Australia
80%
Granted
Western Australia
80%
Granted
Western Australia
90%
Application
Western Australia
80%
Granted
Western Australia
Beadell
Beadell
Beadell
Beadell
E45/4267
E45/4223
E45/4186
E45/4494
Big Red
E28/2268
Granted
Western Australia
Big Red
E69/3190
Granted
Western Australia
Big Red
E29/2536
Application
Western Australia
Big Red
E29/2537
Application
Western Australia
Zanthus
E69/2506
Granted
Western Australia
Zanthus
E28/2464
Application
Western Australia
Zanthus
E 28/2466
Application
Western Australia
Thunderstorm
E28/2322
Granted
Western Australia
Thunderstorm
E28/2472
Application
Western Australia
Thunderstorm
E 28/2382
Application
Western Australia
Thunderstorm
E28/2471
Application
Western Australia
Thunderstorm
E28/2527
Application
Western Australia
Thunderstorm
E28/2528
Application
Western Australia
Thunderstorm
E28/2529
Application
Western Australia
Thunderstorm
E28/2523
Application
Western Australia
Sidewinder
E58/484
Application
Western Australia
Sidewinder
E59/2119
Application
Western Australia
Derosa
Bompela
Derosa
Sapala
Nanemi
Granted
Granted
Granted
Burkina Faso
Burkina Faso
Burkina Faso
90%
100%
100%
100%
100%
20% Notee1
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
85% Note 2
85% Note 2
100%
Villibongo
Granted
Burkina Faso
100%
Burkina Faso
Pogoro
Granted
Burkina Faso
100%
Burkina Faso
Yalore
Granted
Burkina Faso
100%
Canegrass
E29/783
Burkina Faso
Burkina Faso
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Comment
Fraser Range Project
E28/2366
Granted
Fraser Range, WA
100%
Fraser Range Project
E28/2539
Application
Fraser Range, WA
100%
Fraser Range Project
E28/2540
Application
Fraser Range, WA
100%
Fraser Range Project
E28/2542
Application
Fraser Range, WA
100%
Fraser Range Project
E28/2547
Application
Fraser Range, WA
100%
Fraser Range Project
E58/0491
Application
Fraser Range, WA
100%
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status
Location
Comment
Fraser Range Project
E63/1731
Application
Fraser Range, WA
100%
Fraser Range Project
E28/2466
Application
Fraser Range, WA
100%
Fraser Range Project
E28/2464
Application
Fraser Range, WA
100%
1. Zanthus Project, Western Australia
E69/2506 is subject to a Joint Venture agreement with Blackham Resources Ltd whereby Rumble can earn
up to a 75% interest in the licence.
2. Derosa Project, Burkina Faso
Bompela and Sapala are subject to a Joint Venture agreement with Canyon Resources limited whereby
Rumble owns 85% interest and Canyon a 15% interest.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc)..
Mud Rotary (MR) drilling of Pre-collars
to depths between 40m to 112m
Drilling
techniques
NQ2 Diamond drilling to the bottom of
hole for all five holes. Core collected
ranges in length from 73m to 206m.
Sampling of the diamond core will be
completed on 5m intervals. One quarter
of the core was then sent for analysis..
Mud Rotary (MR) drilling and RC of Precollars to depths between 40m to 112m
NQ2 Diamond drilling to the bottom of
hole for five holes. Core collected
ranges in length from 73m to 206m.
Diamond
drilling
and
pre-collars
undertaken by DDH1 Drilling, utilizing a
multipurpose Sandvik 1200 drill rig and
associated equipment.
Drill
sample
recovery
Logging
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Diamond Core is oriented using an
electronic reflex orientation tool at end
of each run
Diamond
drilling
recoveries
are
recorded by the drillers at the end of
each drilling run and checked during
logging by Rumbles field staff
The
Diamond
core
has
been
geologically logged to a level of detail to
be appropriate for mineral resource
estimation.
Logging of diamond
lithology, mineralogy,
weathering,
colour
appropriate features.
core records
mineralization,
and
other
All logging is quantitative. All core trays
photographed.
Criteria
JORC Code explanation
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometres, handheld
XRF instruments, etc, the parametres used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Verification
of
sampling
and
assaying
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
Commentary
All the diamond core (100%), totaling
720.6m has been orientated and
geologically logged.
The core will cut on 1m intervals A
quarter core sample was then sent for
analysis.
All samples were analysed using a 4
acid ICP method with appropriate
quality control measures.
No verification sampling has been at
present, further analysis of the core is
ongoing.
Drill hole collars were located by GPS.
Expected accuracy is +/- 5m for
northing and easting.
The grid system is GDA94(MGA), zone
51
The GPS is +/- 5m, and an estimated
RL is used from the 1:250,000
Individual hole collars are spaced 400600m apart.
5m samples have been collected to
reflect the geology and style of
mineralisation.
There has been no compositing of the
data.
All core was oriented before sampling
was completed.
.
Criteria
JORC Code explanation
geological
structure
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
Sample
security
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
Commentary
Chain of custody is managed by
Rumble Resources. Drill core is stored
on site. Core is palleted and steel
strapped, before being transported to
Kalgoorlie and then to a laboratory in
Perth.
No audits or reviews have been carried
out at this stage
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land
tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The drilling is located wholly within
Exploration Licence E69/2506, which is
part of a JV whereby Rumble is earning
up to 75% from Blackham Resources
Ltd.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Drill
hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
The Tenement is located on Vacant
Crown Land
The tenement is in good standing and
no known impediments exist.
No previous exploration of the
basement rocks for base metals has
been completed. Various parties have
completed exploration for lignite in the
upper sequences.
Geological setting is the Albany Fraser
Mobile Belt consisting of gneiss and
mafic rocks including gabbro.
The Company is exploring for
magmatic hosted base metal
mineralization.
This information has been previously
released to the ASX..
There was no weighting or averaging of
the data..
All widths are at present thought to be
true widths.
Criteria
JORC Code explanation
Commentary
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional
views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
The results at this stage are preliminary
and work is ongoing.
Balanced
reporting
Other
substantive
exploration
data
Further work
The results presented are preliminary
and work is ongoing.
Previous ASX releases by Rumble
Resources Limited have detailed
aspects of previous work undertaken
within the project area.
At this stage, the geology and
mineralization intersected is only
broadly understood and requires further
down hole geophysical surveying,
geochemistry and petrology.
Share your feedback
Discover