RIU Explorers Conference Presentation
Released
Released
Announcement PDF
N E A R
T E R M
GOLD PRODUCTION
&
E X P L O R AT I O N
M U LT I - C O M M O D I T Y
E X P O S U R E
&
G R O W T H
RIU Explorers Conference
12.15pm on 18 February 2025
A S X : R T R
DISCLAIMER
This presentation has been prepared by Rumble Resources Limited (Rumble or the Company). It contains general information about the Company’s activities current as
at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentation is not to be distributed (nor taken to
have been distributed) to any persons in any jurisdictions to whom an offer or solicitation to buy shares in the Company would be unlawful. Any recipient of the
presentation should observe any such restrictions on the distribution of this presentation and warrants to the Company that the receipt of the presentation is not
unlawful. It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation or any
information, opinions or conclusions expressed in the course of this presentation. This presentation is not a prospectus, product disclosure document or other offering
document under Australian law or under any other law. It has been prepared for information purposes only. This presentation contains general summary information and
does not take into account the investment objectives, financial situation and particular needs of any individual investor. It is not financial product advice and investors
should obtain their own independent advice from qualified financial advisors having regarding to their objectives, financial situation and needs. Rumble nor any of their
related bodies corporate is licensed to provide financial product advice.
This presentation and information, opinions or conclusions expressed in the course of this presentation contains forecasts and forward-looking information. Such
forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost
certainly differ materially from those expressed or implied. There are a number of risks, both specific to Rumble, and of a general nature which may affect the future
operating and financial performance of Rumble, and the value of an investment in Rumble including and not limited to title risk, renewal risk, economic conditions, stock
market fluctuations, manganese demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks,
reliance on key personnel, reserve estimations, native title risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
You should not act or refrain from acting in reliance on this presentation, or any information, opinions or conclusions expressed in the course of this presentation. This
presentation does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the prospects
of Rumble. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the
information, statements and opinions contained in this presentation before making any investment decision. Recipients of this presentation must undertake their own
due diligence and make their own assumptions in respect of the information contained in this presentation and should obtain independent professional advice before
may any decision based on the information. No representation or warranty, express or implied, is made in relation to the fairness, accuracy or completeness of the
information, opinions and conclusions expressed in the course of this presentation. To the maximum extent permitted by law, no representation, warranty or
undertaking, express or implied, is made and, to the maximum extent permitted by law, no responsibility or liability is accepted by the Company or any of its officers,
employees, agents or consultant or any other person as to the adequacy, accuracy, completeness or reasonableness of the information in this presentation. To the
maximum extent permitted by law, no responsibility for any errors or omissions from this presentation whether arising out of negligence or otherwise is accepted. An
investment in the shares of the Company is to be considered highly speculative.
The exploration targets or conceptual exploration targets in this presentation or expressed during the course of this presentation are subject to completion of the
necessary feasibility studies, permitting and execution of all necessary infrastructure agreements. This presentation and information, opinions or conclusions expressed
in the course of this presentation should be read in conjunction with Rumble's other periodic and continuous disclosure announcements lodged with the ASX, which are
available on the Rumble website. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward-looking statements
include, but are not limited to, statements concerning the Company’s exploration programs, outlook and target sizes. They include statements preceded by words such
as “potential”, “target”, “scheduled”, “planned”, “estimate”, “possible”, “future”, “prospective” and similar expressions.
COMPETENT PERSON STATEMENT
The Exploration Results referenced in this presentation were first announced by the Company in accordance with ASX Listing Rule 5.7 in its announcements dated 17
February 2025, 11 December 2024, 28 November 2024,15 October 2024, 2 September 2024, 6 August 2024, 16 July 2024, 13 March 2024, 21 February 2024, 14
November 2023, 31 October 2023, 24 October 2023, 5t October 2023, 17 July 2023, 19 April 2023, 14 March 2023,16 February 2023, 17 November 2022, 3 November
2022, 29 September 2022, 30 August 202, 23 August 2022, 18 July 2022, 26 May 2022, 9 March 2022, 21 February 2022, 7 February 2022, 31 January 2022, 21
December 2021, 13 December 2021, 18 November 2021, 10 November 2021, 18 October 2021, 8 July 2021, 2 June 2021, 19 April 2021, 23 February 2021, 17
February 2021, 15 February 2021, 3 February 2021, 28 January 2021, 4 November 2020, 6 October 2020, 20 May 2020, 4 May 2020, 24 April 2020, 17 February 2020,
11 February 2020, 23 January 2020, 26 November 2019, 8 November 2019, 21November 2019, 21 October 2019, 1 October 2019, 23 August 2019, 22 August 2019, 6
August 2019, 11 July 2019, 1 July 2019, 4 April 2019, 12 March 2019, 12 February 2019, 6 February 2019, 17 December 2018, 27 November 2018, 30 August 2018
and 9 August 2018.
The Updated Mineral Resource Estimate (MRE) for the Western Queen Project referenced in this presentation was announced by the Company in accordance with
ASX Listing Rule 5.8 on 15 October 2024 the previous MRE for Western Queen was announced 2 August 2021. The Mineral Resource estimate for the Earaheedy
Project referenced in this presentation was first announced by the Company in accordance with ASX Listing Rule 5.8 in its announcement dated 19 April 2023. Rumble
is not aware of any new information or data that materially affects the information included in the relevant market announcements described above and, in the case of
the Mineral Resource estimate, that all material assumptions and technical parameters underpinning the estimate in the relevant market announcement continue to
apply and have not materially changed.
VISION
AND
MISSION
Become a leading Australian
resources company, delivering
significant value and growth through
resource discoveries and innovative
exploration in Western Australia.
Enhance shareholder value by
identifying and developing mineral
assets, with a focus on generating
near-term cashflow from Western
Queen to internally fund further
resource growth through successful
exploration and advance Earaheedy
towards development.
2
CORPORATE OVERVIEW
BOARD OF DIRECTORS
$0.04
~940M
ASX:RTR
SHARE PRICE
SHARES ON ISSUE
TICKER
PETER HAROLD
Managing Director & CEO
~$40M
~$5.6M
~$34M
MARKET CAP
CASH &
EQUIVALENTS3
ENTERPRISE VALUE
PETER VENN
Technical Director
3.0M
25.0M
OPTIONS1
PERFORMANCE
OPTIONS & RIGHTS2
$0.090
$0.080
Volume
A$ RTR Share Price
Notes:
1.
3.0 million 20c & 58c Options (Various Expiry)
2.
5.0 million Performance Options Vesting $1 &
$2 (unvested), 1.5 million Options @ 20c &
10.0M Options at 15.4c & 21.5c & 10.0M
Performance Rights with various hurdles
3.
As at 31 December 2024
12,000,000
10,000,000
$0.070
$0.060
8,000,000
$0.050
6,000,000
$0.040
$0.030
4,000,000
$0.020
2,000,000
$0.010
$-
-
SHAREHOLDER COMPOSITION
BOARD AND MANAGEMENT
8%
TOP 20
31%
GEOFF JONES
Non-Executive Director
MICHAEL SMITH
Non-Executive Director
MATTHEW BANKS
Non-Executive Director
MANAGEMENT
BRETT KEILLOR
Technical Consultant
BEN JONES
Geological Consultant
LUKE TIMMERMANS
Exploration Manager
TREVOR HART
Chief Financial Officer
& Joint Company Secretary
RESEARCH Analyst Coverage
SAM CATALANO
MICHEAL BENTLEY
3
SIGNIFICANT VALUE DRIVERS – CASHFLOW & GROWTH
Our strategy is focused on resource
expansion, self-sufficiency, and
strategic partnerships. We aim to
grow the resource base at Western
Queen, ensuring long-term value
creation while generating strong
cash flow to support self-funded
exploration. Additionally, we are
advancing the Earaheedy project
with the goal of attracting a major
resource company, positioning us for
significant growth and future
opportunities.
RESOURCE GROWTH & ACCELERATED PATH
TO PRODUCTION
WESTERN QUEEN GOLD
• Target open-pit mining and toll processing in 2025,
leveraging the Bain/MEGA deal1
• Grow gold inventory through targeted exploration
ADVANCING TOWARD DEVELOPMENT
& INTO PRODUCTION
EARAHEEDY ZINC/LEAD/SILVER
• Metallurgical testwork program completed2
• Internal scoping study underway
• Will seek a strategic partner to advance the project
through BFS and into production
DRIVING GROWTH THROUGH PROJECT
GENERATION
•
•
Continuously evaluating new opportunities
Securing JV partners to fund exploration where strategically
beneficial
1. Refer ASX Announcement 28 November 2024 – Development of Western Queen Gold Project
2. Refer ASX announcement 28 November 2024 – Excellent Metallurgical Results Highlight Earaheedy’s Development Potential
4
OUR PROJECTS
Resource
upgraded to
287koz
Gold Resource1
Inferred
Resource
containing
2.2Mt Zn
0.7Mt Pb
12.6Moz Ag2
WESTERN QUEEN
– NEAR TERM PRODUCTION & DISCOVERY
POTENTIAL
• Discovery drilling ongoing
• Near-term gold production
• High-grade tungsten discovery
EARAHEEDY
– DEVELOPMENT READY
• Potential large-scale, low-cost open pit mining
• Metallurgical testwork confirms +61% zn + pb
concentrate
• Less than 30% of the 70km host Unconformity
Unit tested
• One of the largest zinc sulphide discoveries over
the last decade
OTHER PROJECTS
– LAMIL, BRAESIDE/WARROO,
MUNARRA GULLY, FRASER RANGE
•
Base metals, Au, Ag, PGEs, U and what else?
1.Refer ASX Announcement 15 October 2024 – Western Queen Gold Resources Increased 76% to 287koz and refer slide 7
2.Refer ASX announcement 19 April 2023 – Maiden Resources Estimate Earaheedy
5
WESTERN QUEEN – HIGH-GRADE GOLD, PRODUCTION IN 2025
•
•
•
•
•
•
•
76% Increase in Mineral Resource
Estimate (MRE) reported in October 2024
MRE – 4.42Mt @ 2.02g/t Au for
287,000oz1
Historical production – 880kt @
7.6g/t Au for 215koz
Near-term production – aiming for
second half of 2025
Well located – 100km radius of 3 gold
plants, on granted mining leases
Geology – The Western Queen deposits
are associated with a major orogenic shear
zone that remains largely untested along
strike and at depth
Possible Analogy – Spartan’s Never
Never which is 6.75Mt @ 8.65 g/t Au for
1.875Moz2 to a vertical depth of 1,000m
Location Plan of the Western Queen Gold Project
1. Refer ASX Announcement 15 October 2024 – Western Queen Gold Resources Increased 76% to 287koz and refer slide 7
2. Refer Spartan Resources Ltd ASX release dated 23 July 2024
6
WESTERN QUEEN – 76% INCREASE IN RESOURCES TO 287KOZ
Western Queen Gold Deposit Longitudinal Section – Highlighting Previous Production, Resources and Potential New Resource Areas
7
WESTERN QUEEN – NEVER NEVER COMPARISON
Western Queen South comparison to Spartan’s Never Never (to scale)
8
8
WESTERN QUEEN – OTHER TARGETS ALONG THE SHEAR ZONE
Targets
•
Over the 2km strike between the Duke
and Cranes deposits
• Limited RAB drilling with an average
end of hole depth of less than 20m
and only three RC holes
• Small gold in laterite and oxide
Inferred Resource of 3,300oz @
1.39g/t Au
• Limited historical drilling at Cranes
returned intercepts of 14m @ 4.87 g/t
Au from surface and 11m @ 1.85 g/t
Au from surface
•
Further northeast of Cranes the position of
the regionally significant Western Queen
Shear Zone has been reinterpreted using
detailed airborne magnetics flown by
Rumble and remains untested
Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
9
WESTERN QUEEN – DRILLING HITS MORE GOLD & TUNGSTEN
Mid 2024 Drilling1
• Extended and potentially revealed new
mineralisation
• WQDD013 returned:
• 5m @ 5.02g/t from 216m
• 16m @ 1.32g/t from 264m
• WQDD014 returned:
• 29m @ 1.75g/t from 202m including
• 12m @ 3.5g/t from 208m
Nov/Dec 2024 Drilling2
Gold
• WQDD018 returned:
• 25m 1.21g/t from 334m
• 4m @ 3.34g/t from 348m
Tungsten
• WQRC214 returned:
• 14m @ 0.26% WO3 from 116m including
• 4m @ 0.65% WO3 from 116m
Western Queen South - gram metre contours with selected drill hole intersections – Longitudinal Section
oards Production & Further Explorationources upgraded to 287kozs gold
1.
2.
Company forming JV with Bain Global to develop and MEGA to contract mine
Refer
ASX Announcement 16 July 2024 - Initial drilling intersects potential new parallel high-grade gold system at Western Queen Project
Excellent
upside
to add significant resources
more drilling 2025 - High-grade gold and tungsten assays returned from Phase 1 drilling at Western Queen
Refer
ASX
Announcement
17withFebruary
Drilling ongoing
10
WESTERN QUEEN – POTENTIAL NEW LODES AT PRINCESS
Nov/Dec 2024 Drilling Program – Phase 1
• Discovered 2 new high-grade lodes at Princess
• WQRC208 returned1:
• 5m @ 3.76g/t from 162m
• WQRC204D returned1:
• 33m @ 1.03g/t from 214m including
• 3m @ 4.87g/t from 225m
• WQDD023 returned1:
• 17m @ 1.67g/t from 227m including
• 3m @ 2.97g/t from 286m
Feb/March 2025 Drilling Program – Phase 2
• RC drilling underway
• Focus on:
• Extending the high-grade WQS lode
• Further testing on the newly defined Princess
high-grade lodes
• Duke at depth
Princess Longitudinal section highlighting the newly identified high-grade lodes and demonstrating their
parallel south plunging nature relative to the existing Western Queen Central lode.
1. Refer ASX Announcment 17 February 2025 - High-grade gold and tungsten assays returned from Phase 1 drilling at Western Queen
11
MORE POTENTIAL – TUNGSTEN
WQDD013 intersections1:
•
4m @ 4.58% WO3, 0.72g/t
Au from 174.85m including
•
2.05m @ 8.71% WO3,
1.38g/t from 176.85ml and
•
0.65m @ 18.35% WO3
2.97g/t Au from 176.85m
WQRC2142
•
14m @ 0.26% WO3, 0.28g/t
Au from 116m including
•
4m @ 0.65% WO3 and
0.11g/t Au from 116m
Source: Almonty (almonty.com), Fastmarkets, Metal Bulletin
WQDD206
•
7m @ 0.23% WO3, 0.38g/t
Au from 72m including
•
3m @ 0.40% WO3 and
0.76g/t Au from 75m
1.
2.
WQDD013 intersection under UV light
ASX Announcement 6 August 2024 – High-grade Tungsten Discovery at Western Queen
ASX Announcement 17 February 2025 - High-grade gold and tungsten assays returned from Phase 1 drilling at Western Queen
Source: www.technavio.com
12
MULTIPLE HIGH-GRADE TARGETS
CURRENT DRILLING PROGRAM
13
PATHWAY TO PRODUCTION – BAIN GLOBAL/MEGA DEAL
Term Sheet1 with Bain Global/MEGA
•
•
Key terms
•
Bain & Rumble to form JV to mine open pits
•
MEGA to provide mining services
•
Bain providing up to $35M to fund predevelopment
•
Rumble & Bain share free cash after development
costs repaid
Bain Global Resource
•
•
Subsidiary of BGR Mining & Infra Ltd – major
Indian mining contractor
MEGA Resources
•
100% subsidiary of Bain Global
•
Team of experience Australian mining technical &
operation personnel
Next steps
•
Execute definitive agreements between Bain,
MEGA & Rumble
•
Ore tolling or ore sale agreement
•
Permitting & pre-development planning underway
1 Refer ASX Announcement 28 November 2024 – Development of Western Queen Gold Project
Bain Global, MEGA & Rumble personnel at Western Queen in November
14
EARAHEEDY– GLOBALLY SIGNIFICANT Zn/Pb/Ag RESOURCE
Maiden Sulphide, pit constrained, inferred Mineral
Resource Estimate (MRE)
• 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) for
2.2Mt Zinc, 0.7Mt Lead and 12.6Moz Silver of contained metal
• Large scale, low-cost open pit mining proposition in premier mining jurisdiction
• One of the largest zinc sulphide discoveries globally over the last decade
Metallurgical testwork confirms
• High recoveries and bulk concentrate spec. (+60% Zn+Pb) suitable for ISP smelters
• HyroFloatTM works – rejects 30%of the waste and should lead to lower plant capex &
opex
Project optionality
• The pit constrained MRE hosts a 41Mt higher-grade component >3% Zn+Pb cut-off
• 462Mt component > 0.5% Zn+Pb cut-off that could be upgraded through beneficiation
Exceptional resource growth and discovery potential
• Deposits remain open with less than 30% of the now 70km host Unconformity Unit
effectively drill tested
• Excellent potential to locate further near-surface high grade areas i.e. Mato, Kalitan,
Colorado zones
• High grade MVT deposit targets in fertile underlying carbonate formations remain
untested
15
EARAHEEDY– MAJOR ZN/PB/AG SULPHIDE DISCOVERY
• Major sedimentary hosted base metal discovery in
•
the Earaheedy Basin announced in April 2021
Chinook discovery hole intersected:
•
34m @ 4.22% Zn+Pb from 66m, incl.
•
15m @ 6.97% Zn+Pb, from 74m
• Maiden JORC compliant Mineral Resource Estimate
delivered 24 months after discovery
• Maiden resource based on 658 holes for 102,000m of
drilling
• Zinc sulphide dominant (up to 10:1 Zn:Pb)
• Represents one of the largest zinc discoveries
globally in past decade
•
Located 100km north of Wiluna in Western Australia, a
world class mining jurisdiction with access to major
highways, power, rail, ports and mining workforce
16
GLOBALLY SIGNIFICANT PIT CONSTRAINED MAIDEN RESOURCE
17
EXCEPTIONAL RESOURCE GROWTH POTENTIAL
• Inferred resources constrained
to closer spaced drilling with
potential to significantly
grow resources with infill
and extension drilling
• Exceptional resource
expansion with deposits open
in all directions
• Mineralisation intersected in
broader spaced drilling outside
of inferred resource areas
highlights the potential for
near term resource growth
• Potential to discover high-
grade MVT and fault related
resources beneath existing
resource area in underlying
carbonate formations
18
METALLURGY – BULK ISP CONCENTRATE CONFIRMED
Major metallurgical testwork program
completed1 in Oct 24 incorporating:
•
•
•
Comminution
Beneficiation (DMS, HydroFloatTM)
Flotation (incl. LCTs)
Key Points:
•
•
•
•
•
Excellent final recoveries to 79% Zn from
lower grade composites (<2.6% Zn)
High-grade bulk concentrate to 61% Zn+Pb
Ideal for ISP smelters
HydroFloatTM Technology works – reject
30% of waste early, means smaller plant =
lower Capex & Opex
Coarsest grind (P80>200micron) = lower
Opex - further energy and consumable cost
reductions
Next Steps
•
Chinook Zinc Recovery Vs. Head Grade Comparison to Pb-Zn Mine Database2
Internal Scoping Study (incl. marketing)
1. ASX Announcement 28 Nov 2024 – Excellent Metallurgical Results Highlight Earaheedy’s Development Potential
2. Database from “Handbook of Flotation Reagents: Chemistry,Theory and Practice”. Srdjan Bulatovic – 19 February 2007)
19
METALLURGY
HYDROFLOATTM
GROUNDBREAKING INNOVATION
Summary - Hydrofloat results are compelling and demonstrate a
coarse grind P80 up to 310 micron for rougher flotation of the
HydrofloatTM concentrate, produced similar recoveries (86% Zn
and 86% Pb) to conventional flotation at finer grind sizes with
improved Zn rougher concentrate grades.
Benefits – the testwork confirmed that the use of Eriez
HydroFloatTM as a coarse particle rejection system in the front
end of the potential process route will discard ~30% of the coarse
and largely barren ore which should offer numerous operating
and capital cost benefits, including:
•
Increases in plant profitability – potential to increase plant
throughput by 10-35% with significant reductions in Capex
and Opex (e.g. Power)
•
Improves environmental sustainability – increases in water
recovery by 85% lead to major energy consumption
reductions + coarser tailings for safer tailing disposal and
management
•
Improves Project economics – through material reduction in
plant footprint OR increase in overall plant capacity enabling
higher production rates
•
Increased metallurgical efficiency – Removing over 30% of
total gangue in early stages of the process and allowing the
processing of hard and lower grade ores at coarser fractions.
Proposed Flowsheet with HydroFloatTM added – Chinook
20
KEY DELIVERABLES
– POSITIONED FOR STRONG CASHFLOWS & FUTURE GROWTH
Driving value through exploration
success and key milestone
achievements to enhance
shareholder returns.
Western Queen
Earaheedy
•
Gold production - in
partnership with Bain/MEGA
Metallurgical testwork
completed
•
Gold resources increase from 163kozs to 287kozs,
76% upgrade
•
Internal scoping study
•
Will seek a development
partner
•
Discovery drilling - ongoing
•
Tungsten – maiden resource
in 2025
Other Projects
•
Advanced via
JVs/partnerships/other
Recognition of
True Value
•
Unlock value for
shareholders
21
CONNECT
WITH US
Peter Harold
Managing Director & CEO
info@rumbleresources.com.au
+61 8 6555 3980
rumbleresources.com.au
Level 1, 16 Ord Street,
West Perth, WA 6005
https://www.linkedin.com/company/
rumble-resources-ltd
Rumble Resources Ltd (@RumbleResources) / X
22
22
Share your feedback
Discover