June 2024 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide an
update on the Company’s activities during the June 2024 quarter, focusing on growing the
gold resources at Western Queen Project, advancing the emerging world class Earaheedy
Zinc-Lead-Silver Project, and progressing the other exploration projects in the portfolio.
Highlights for the Quarter include:
Western Queen – Gold
•
completed diamond and RC holes to test for possible depth extensions at Western
Queen South and potential northern extensions to the Duke deposit
•
WQDD013 intersected two highly significant intervals of gold mineralisation,
including 5m @ 5.05g/t Au from 216m and 16m @ 1.32g/t Au from 264m that
potentially represents a new parallel high-grade lode at Western Queen South
•
commenced work on an updated Mineral Resource Estimate for the Western Queen
Project area
Wardawarra – Li-Cs-Ta, Ni-Cu-Co
•
completed a broad soil sampling program across the northern portion of the
Wardawarra Greenstone Belt to better understanding the lithium fertility
•
confirmed a significantly large and highly fractionated lithium-caesium-tantalum
fertile system exists which warrants an expanded exploration program
•
commenced planning an initial exploration program that will include detailed
geological mapping and surface geochemical sampling of the Western Pegmatite
Zone, including the Lithium Creek Prospect and similarly testing the Eastern
Pegmatite Swarm, including the Dunn’s Prospect
Earaheedy Zn-Pb-Ag-Cu Project
•
metallurgical test work is ongoing with initial results due to be reported in the
September quarter
•
internal development studies for scoping purposes to commence once the
metallurgical test work is completed
Corporate
Fund Raising
•
raised $2.14 million (before costs) from a $1.1million placement and a further $1.04
million via a 1 for 10 entitlement offer
Cash Balance
•
Company had $2.3 million in cash at the end of the Quarter
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Joint Company Secretary
Trevor Hart
CFO & Joint Company
Secretary
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals.
Figure 1 – location of the Company’s projects
Rumble Resources Limited - ASX: RTR
Page | 2
1.1 Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
Chinook metallurgical test work- E69/3787 (100% RTR) and E69/3464 (75% RTR/ 25% ZNC)
During the quarter, the Company continued the metallurgical test work on material from the Chinook Deposit at the
Earaheedy Project. The material was obtained from a drilling program that included 10 diamond holes from the Chinook
Deposit (see Figure 2), which provided 2,300kg of representative metallurgical core sample.
The Chinook metallurgical test work program includes:
• pilot beneficiation trials that will assess the potential to upgrade the significant volumes of lower grade Zn-Pb
mineralisation highlighted within the pit constrained MRE;
• early comminution test work; and
• further detailed mineralogy and flotation optimisation testing, for future planned scoping level studies.
The Chinook metallurgical program was expected to be completed towards the end of the current quarter, however due
to slow turnaround in results from the laboratories and some additional test work, the program is yet to be finalised. This
work will be completed in the September quarter and reported once results are finalised.
Figure 2 - Chinook - Metallurgical diamond drill hole Locations
Next Steps
•
Metallurgical studies
o
•
Completion of the current test work program on the Chinook material.
Scoping studies
o
Once the metallurgical test work program is completed work will commence on initial supporting internal
scoping studies, which will consider some of the possible future development scenarios/options.
Rumble Resources Limited - ASX: RTR
Page | 3
1.2 Gold, Base Metal & Lithium Projects, Western Australia
Western Queen Gold Project, Mt Magnet, Western Australian
Figure 3 - Western Queen mining licences and proximity to existing mills
During the Quarter, the Company commenced a diamond and reverse circulation (RC) drilling program at Western
Queen targeting down plunge extensions to the existing Western Queen South mine and a northern extension of the
Duke Prospect, located north of Western Queen Central Open Pit. At the end of Quarter, the Company had completed
the first three diamond holes for 823m at Western Queen South and six RC holes at the Duke Prospect for a total of
414m.
The diamond drilling has provided the Company with crucial litho-structural information and assisted in a better
understanding of the geometry of the high-grade Western Queen South gold mineralisation. Mineralisation at Western
Queen South is open both down-dip and down-plunge. No previous diamond drilling has been completed by the
Company at Western Queen South and one interpretation was that the deposit was doubly plunging with apparent
shallow and steep plunge directions.
The first two holes of the current program, WQDD012 and WQDD013, (see Figure 4) were drilled to final depths of
272.5m and 302.3m respectively targeting an interpreted steep plunge orientation beneath hole WQRC188 (drilled by
the Company in 2021) which returned multiple lodes including:
•
5m @ 38.76 g/t Au from 193m;
•
3m @ 5.68 g/t Au from 210m; and
•
17m @ 5.7 g/t Au from 221m
Rumble Resources Limited - ASX: RTR
Page | 4
Holes WQDD012 and WQDD013 intersected the host amphibolite sequence which was variably intruded by later
pegmatites which occur parallel and perpendicular to the regional/shear foliation. Structural observations and
measurements taken during logging of the diamond core indicated that high-grade mineralisation at Western Queen
South is likely controlled in a shallowly plunging (30°- 40° towards the south) sinistral oblique strike-slip structural
regime, and thus no evidence for the steeper mineralisation plunge was identified.
Despite the revised structural interpretation, WQDD013 intersected two highly significant intervals of mineralisation,
including 5m @ 5.05g/t Au from 216m and 16m @ 1.32g/t Au from 264m, approximately 80m below WQRC188 that
has been interpreted as a potential new parallel high-grade lode below the main Western Queen South high-grade
lode. This hole represents the deepest drilling beneath the Western Queen South open pit mine and the Rumble
exploration team now believe that multiple, shallowly south plunging, high-grade shoots could exist at Western Queen
South. Additional drilling has been planned to target the up-plunge position of the newly recognised high-grade parallel
lode to confirm its potential.
The third hole, WQDD014, was drilled to target the main Western Queen South high-grade lode to both extend and
improve confidence in the existing resource model. WQDD014 pierced the projected shallow south plunging
mineralisation between holes WQRC188 and WQRC178 and intercepted 29m @ 1.75g/t Au from 202m, including 12m
@ 3.50g/t Au from 208m.
Figure 4 – Western Queen South Deposit – Gram Metre Contours with Selected Drill Hole Intersections – Longitudinal Section
WQDD015 was the last hole to be drilled in the current program and was targeting a 60m down-plunge extension of
the main Western Queen South high-grade shoot from previous historic drilling. This hole was completed in July and
is the deepest hole, so far drilled, to test the high-grade Western Queen South mineralised system. Assay results are
pending.
Rumble Resources Limited - ASX: RTR
Page | 5
At the Duke Prospect, six RC holes for 414m were drilled, targeting the up-dip and up-plunge position of an open
intercept from previous drilling of 8m @ 7.22g/t Au in WQRC026, approximately 150m north of earlier drill delineated
high-grade shoots that are located just north of the Western Queen Central mine. Drilling intercepted the expected
host mineralised sequence of strongly sheared and biotite altered ultramafic with gold anomalism intercepted and
associated with silica and sulphide alteration in WQRC192. Unfortunately, a thick quartz-muscovite bearing pegmatite
intrudes the host mineralised sequence and has been interpreted to have effectively “stoped out” the mineralisation in
the other five holes drilled.
Despite this, the interpreted mineralised structure is open for at least 500m to the north with only shallow RAB drilling
having previously tested these areas. A current geological mapping and geochemical sampling program will be utilised
to target future drill positions.
About Western Queen
Gold mineralisation at the Western Queen Gold Project has already been defined over approximately 2.7km and is
associated with a large-scale structural flexure (jog feature) within the regionally extensive auriferous Western Queen
Shear Zone (WQSZ) see Figure 5.
The Western Queen mineral resource currently stands at 2.1Mt @ 2.42 g/t Au for 163,200oz, (refer ASX release dated
2 August 2021 titled “Western Queen Project Resource Upgrade by 35% to 163,000oz Au”) and the historic open pit
and underground production from the Western Queen Central and Western Queen South deposits was 880,000t @
7.6g/t Au for 215,000 oz gold.
Figure 5 – Western Queen Gold Deposit Longitudinal Section – Highlighting Previous Production, Resources and Potential New Resource
Areas
Review of Rumble’s’ previous exploration work highlights strong continuity down-plunge from both the Western Queen
Central and Western Queen South deposits. High-grade gold zones have developed as moderate south plunging
systems within the main WQSZ. Figure 5 highlights the multiple sets of south plunging zones in longitudinal section
with the Duke and Baron prospects open at surface and unmined. Of significance is the poorly tested zone between
the Western Queen Central and Western Queen South deposits along with the down-plunge positions that remain
completely untested.
Rumble Resources Limited - ASX: RTR
Page | 6
Next Steps
Following completion of the recent RC and diamond drill program results will be assessed and the next drilling program
will be designed.
Given there are existing open pit gold resources at Western Queen and their proximity to existing gold processing
plants work has commenced on a number of initiatives aimed at fast tracking the project to potential production
including:
•
•
•
•
updating the most recent (2021) Mineral Resource Estimate for the Project;
commencing an internal scoping study based on mining the open pit(s) and toll treatment;
seeking proposals from third parties who can assist the Company with project financing, mining and
associated activities; and
determining a realistic development timeline.
Wardawarra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
During the Quarter, the Company completed a broad soil sampling program across the northern portion of the
Wardawarra Greenstone Belt to assist in better understanding the lithium fertility of the Wardawarra Project. Persistent
wet weather significantly delayed completion of the program, however in total 1267 soil samples were taken. During
the September quarter the Company plans to complete pXRF analysis of the soil samples to assess for broad LithiumCaesium-Tantalum (LCT) pathfinder anomalism with a view of selecting soil samples to submit for wet lab analysis.
Figure 6 - Wardawarra Project surrounds Western Queen mining licences – Tenement Location Plan
Rumble Resources Limited - ASX: RTR
Page | 7
About Wardawarra Lithium-Caesium-Tantalum Project
Recent exploration has confirmed a significantly large and highly fractionated lithium-caesium-tantalum (LCT) fertile
system exists at Wardawarra which warrants an expanded exploration program. The initial exploration program will
include detailed geological mapping and surface geochemical sampling of the Western Pegmatite Zone, including the
Lithium Creek Prospect and over the Eastern Pegmatite Swarm, including the Dunn’s Prospect.
Figure 7 - Wardawarra Project Lithium focused exploration overview
At the Western Pegmatite Zone exploration has highlighted a prospective 6km long trend (see Figure 7) containing
multiple, large pegmatites along the granite – ultramafic contact. Pegmatites trend towards the northwest and are
greater than 15m thick in outcrop with surface exposures of several hundreds of metres across strike, suggesting that
the pegmatites may have substantial true thicknesses. Multiple pegmatites appear to have undergone significant
zonation fractionation and many have fractionated quartz cores. Rock chip sampling has returned high-grade assays
of up to 3.62% Li2O and 433ppm Ta2O5.
At the Eastern Pegmatite Swarm and Dunn’s Prospect Exploration (see Figure 7) has confirmed that a 12km long
swarm of pegmatite dykes are lithium-cesium-tantalum (LCT) fertile with a 3km zone of high fertility (ie. K/Rb ratios
less than 20). Dunns Prospect is located in the southern portion of the zone of highest fertility. Rock chip sampling at
Dunns has returned high-grade assays including 4.95% Li2O, 4.91% Li2O, 4.84% Li2O and 4.72% Li2O.
Rumble Resources Limited - ASX: RTR
Page | 8
Additionally, the Fence Prospect and the LCT fertile pegmatite field was previously held by Pancontinental Mining
Limited, who in 1983 ranked it in their top 5 lithium–tantalum prospects with a portfolio of projects that included
Pilgangoora, Wodgina, Tabba Tabba and Yinnetharra. Historic shallow alluvial mining has occurred for
tantalite/columbite, with lithium potential untested by drilling.
Braeside Base Metal Project, East Pilbara, Western Australia
No significant exploration activities occurred during the Quarter.
Lamil Gold-Copper JV Project, Paterson Province, Western Australia
No significant exploration activities occurred during the Quarter.
Warroo Base Metal Project, East Pilbara, Western Australia
No significant exploration activities occurred during the Quarter.
Fraser Range Gold Project, Fraser Range, Western Australia
No significant exploration activities occurred during the Quarter.
2. CORPORATE
2.1 Capital Rasing
On the 10 May 2024 the Company announced a capital raising plan to secure up to $4 million via a placement of $1.1
million to current and new institutional and sophisticated investors together with a pro rata non-renounceable
entitlement offer of one fully paid ordinary share for every ten shares held by eligible shareholders to raise up to $2.9
million.
On the 20 June 2024 the Company announced the results on the entitlement offer being $1.04 million, with a shortfall
of $1.88 million. The Company reserves the right to place the remaining shortfall shares within three months after the
Closing Date which was Monday 14 June 2024.
A total of 53.5 million new shares were issued through the placement and entitlement offer at an issue price of 4 cents
per share for a total of $2.14 million (before costs).
Cash and Investments
As at 30 June 2024, Rumble held $2.3 million in cash.
2.2 Appendix 5B – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $0.78 million.
Cash outflows for the June 2024 Quarter totalled $1.6 million across exploration activity (50%), staff costs (30%),
administration and corporate costs (20%).
Cash inflows for the June 2024 Quarter totalled $2.3 million consisting of proceeds from capital raising (84%), interest
received and other (16%).
2.3 Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $104k for the Quarter, consisting of Technical Management,
Executive and Non-Executive Director fees and salaries, geological consulting, and superannuation payments.
Rumble Resources Limited - ASX: RTR
Page | 9
2.4 Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Peter Harold, Managing Director and CEO of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing the major
Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced drilling has rapidly
uncovered an emerging world class scale base metal system, with interpretative geology and drilling continuing to make new discoveries
and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1 regions of
Western Australia. While the Company is undertaking metallurgical studies and internal scoping studies on Earaheedy exploration
activities have been focused on Western Queen were an opportunity exists to grow the gold resources and potentially fast track the
project into production.
Rumble’s board and management team has a successful track record in making discoveries and project development
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy, and other Rumble Projects is based on and fairly
represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans
is a full-time employee of Rumble Resources Limited,. Mr Timmermans has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources in relation to the Earaheedy Project is based on and fairly
represents information compiled under the supervision of Mr Mark Carder who is a Member of the Australian Institute of Geoscientists
(AIG) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity to which he is undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. The Company confirms that it is not aware of any new information or data
that materially affects the Mineral Resource information included in the Announcements.
The Information in this announcement that relates to prior Exploration Results for the Earaheedy Project is extracted from the following
ASX announcements:
16th July 2024 – Western Queen Drilling Update
29th May 2024 – Western Queen Drilling Commenced
30th April 2024 - Wardawarra Project - Exploration Update
29th April 2024 - Drilling to test high-grade Gold Zones at Western Queen
9th January 2024 – Metallurgical Diamond Drilling Completed Successfully
14th November 2023 – Diamond drilling commences at Earaheedy Project
1st June 2023 - High impact drilling commences at the Earaheedy Project
19th April 2023 - Maiden Mineral Resource - Earaheedy (Zn-Pb-Ag) Joint Venture
14th March 2023 - Chinook Zn-Pb Prospect expands to 8km strike.
16th February 2023 - Multiple New High-Grade Feeder Targets Defined
17th November 2022 - Exceptional Metallurgical Results at Earaheedy Project
3rd November 2022- High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information
included in the Announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Announcements. The Company confirms that it is not aware of any information or
data that materially affects the information included in the relevant market announcement and all material assumptions and technical
parameters underpinning the estimates in the original announcement in respect of the Earaheedy MRE continue to apply and have not
materially changed.
Rumble Resources Limited - ASX: RTR
Page | 10
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Thunderdome
E28/2366
Granted
Western Australia
30% Note 2
Thunderbolt
E28/2924
Granted
Western Australia
100%
Thunderbolt
E28/3062
Granted
Western Australia
100%
Thunderbolt
E28/3065
Granted
Western Australia
100%
Thunderbolt
E28/3240
Granted
Western Australia
100%
Thunderbolt
E28/3219
Granted
Western Australia
100%
Thunderbolt
E28/3220
Granted
Western Australia
100%
Thunderbolt
E28/3221
Granted
Western Australia
100%
Thunderbolt
E28/3352
Granted
Western Australia
100%
Thunderbolt
E69/4170
Granted
Western Australia
100%
Thunderbolt
E28/3313
Application
Western Australia
100%
Thunderbolt
E28/3384
Application
Western Australia
100%
Squall
E28/3155
Granted
Western Australia
100%
Braeside
E45/4873
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/2032
Granted
Western Australia
100%
Warroo
E45/5366
Granted
Western Australia
100%
Warroo
E45/5689
Granted
Western Australia
100%
Warroo
E45/5860
Application
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4063
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 11
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
E69/4124
Granted
Western Australia
100%
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Western Queen
M59/0045
Granted
Western Australia
100%
Western Queen
M59/0208
Granted
Western Australia
100%
Western Queen
L59/40
Granted
Western Australia
100%
Western Queen
E20/0967
Granted
Western Australia
100%
Western Queen
E59/2443
Application
Western Australia
100%
Yelina
E38/3919
Application
Western Australia
100%
Yelina
E38/3920
Application
Western Australia
100%
Yelina
E38/3921
Application
Western Australia
100%
Yelina
E38/3922
Application
Western Australia
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderbolt
E28/3352
Granted
Western Australia
100%
Thunderbolt
E69/4170
Granted
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 12
3. Mining tenements disposed of during the quarter and their location:
No tenements were disposed of during the quarter ending June 2024.
Rumble Joint Ventures - Notes
1. Earaheedy Project, Western Australia
E69/3464 75% RTR / 25% Zenith Minerals
M69/0150 75% RTR / 25% Zenith Minerals
L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
E28/2528, E28/2529, E28/2595, E28/2366 - IGO 70% / RTR 30%
3. Munarra Gully, Western Australia
E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
E45/5270, E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited - ASX: RTR
Page | 13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Rumble Resources Limited
ABN
Quarter ended (“current quarter”)
74 148 214 260
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(478)
(2,677)
(e) administration and corporate costs
(323)
(1,415)
1.3
Dividends received (see note 3)
2
3
1.4
Interest received
11
93
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
200
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(788)
(3,796)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(83)
(c) property, plant and equipment
(21)
(50)
(d) exploration & evaluation
(752)
(8,701)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
188
188
(d) investments
218
218
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(367)
(8,428)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,392
11,062
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(117)
(704)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
2,275
10,358
Cash and cash equivalents at beginning of
period
1,193
4,179
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(788)
(3,796)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(367)
(8,428)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,275
10,358
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
2,313
2,313
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
2,265
1,145
5.2
Call deposits
48
48
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,313
1,193
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
104
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available