Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 January 2024
December 2023 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to
provide an update with respect to the Company’s activities during the December
2023 quarter, focusing on advancing the emerging world class Earaheedy ZincLead-Silver Project. Highlights include:
Earaheedy Zn-Pb-Ag-Cu Project, Western Australia
Mato Prospect RC Drilling E69/3787 (100% RTR)
• RC drilling confirmed a significant new Zn-Pb sulphide discovery at Mato with
the potential to add substantially to the existing pit constrained Inferred Mineral
Resource.
• The latest results at Mato all come from a single 800m long drill traverse and
include:
o
29m @ 3.12 % Zn + Pb from 174m (EHRC734)
including 14m @ 5.04% Zn + Pb from 183m
with high-grade zones of 4m @ 10.16% Zn + Pb from 184m and 2m
@ 15.58% Zn + Pb from 186m
o
10m @ 2.11% Zn + Pb from 188m (EHRC735)
including 3m @ 5.65% Zn + Pb from 190m
o
9m @ 4.89% Zn + Pb from 180m (EHRC738)
o
21m @ 2.0% Zn + Pb from 214m (EHRC740)
including 4m @ 7.93% Zn + Pb from 183m
Including 5m @ 4.43% Zn + Pb from 220m
These results compliment the original discovery hole previously reported (refer to
ASX release 5th and 31st October 2023) where EHRC733 returned:
o
16m @ 5.09% Zn + Pb from 153m (EHRC733)
Including 10m @ 7.05% Zn + Pb from 157m
• The Mato discovery has the hallmarks of a large mineralising system which
potentially could enhance the economics and lends further support to
Earaheedy developing into a world class base metal camp.
• The latest results occur 10km west of the Chinook Zn-Pb deposit and drilling
along this 10km trend has been limited to three short traverses that are all
mineralised.
• The host and style of the Mato Zn-Pb mineralisation is near identical to the
Chinook-Tonka-Navajoh Zn-Pb deposits.
Metallurgical Diamond Drilling Completed Successfully
• 10 PQ3 diamond holes have been completed at Earaheedy, providing over
two tonnes of mineralised drill core for beneficiation and flotation test
programs.
• Drillhole locations were designed to provide representative intervals of Zn-Pb
mineralisation along and across the strike of the Chinook Deposit.
• Test work will also deliver further geo-metallurgical information to be applied
in upcoming scoping studies.
• Drill core has been logged and photographed and the selected intervals have
now arrived in Perth for assay analysis and metallurgical testing.
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Venn
Interim Managing Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Steven Wood
Joint Company Secretary
Trevor Hart
Joint Company Secretary
Mr Brett Keillor
Head of Technical
Next Steps
• Receive the remaining assays for the extensional RC drilling completed at the 9km x 3km Mato Prospect
during the 2023 field season – define high priority drill targets for the 2024 field season.
• Metallurgical studies – Commence beneficiation and flotation optimisation test program on the Chinook
deposit.
• Resource definition drilling – expand & upgrade the classification of existing sulphide deposits at
Chinook and Tonka.
• Scoping studies – review early development scenarios/options following abovementioned metallurgical
programs.
Corporate
• On 25th October Rumble announced the appointment of experienced mining executive and company
director Peter Harold as Managing Director and Chief Executive Officer (MD and CEO), effective from
Monday 12 February 2024.
• Rumble’s current interim Managing Director Peter Venn will transition to the role of Technical Director,
working closely with Mr Harold, and continuing to play a key role in delivery of the Company’s organic
growth model through exploration and development.
• On 24th October the Company announced it has entered into an agreement to acquire four exploration
tenements (E69/3815, E69/3842, E69/3889 and E52/3879) in the Earaheedy Basin from Blaze Minerals
Ltd (ASX:BLZ) for 2,291,047 RTR shares (being $250,000 worth of RTR shares).
• The acquisition substantially enhances the exploration search footprint with the highly prospective
tenure lying over significant inferred portions of the western continuation of the Navajoh Unconformity,
which is considered the main target unit associated with the Chinook - Tonka - Navajoh Zn-Pb-(Ag)
deposits, that lie between 10-20km southeast of E69/3815.
• E69/3815 lies only 1.3km along strike from the newly discovered Mato Prospect.
Rumble Resources Limited - ASX: RTR
Page | 2
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
1.1 Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna, Western
Australia. The Project includes granted tenement (E69/3464), which forms the Rumble Resources Ltd 75%
/ Zenith Minerals Ltd (ASX: ZNC) 25% Joint Venture (“JV”) and E69/3787, E69/3862, E69/4124 and
ELA69/4149 which are 100% owned by Rumble (see Figure 1).
In addition to the above tenements, Rumble is acquiring (100% RTR) four granted exploration licences that
lie north and northwest of the existing tenure (refer to ASX release 24th October 2023. These tenements
comprise of E69/3815, E69/3842, E69/3889 and E52/3879 (see Figure 6).
Figure 1 – Earaheedy Project – Location of Chinook, Tonka-Navajoh Deposits, and Mato Prospect over interpretative
solid geology
Rumble Resources Limited - ASX: RTR
Page | 3
Mato Prospect RC drilling – E69/3787 and E69/3862 (100% RTR)
During the quarter, the Company continued broad spaced extensional RC drilling at the Mato Prospect,
within 100% RTR tenements – E69/3787 and E69/3862. RC drilling has confirmed a significant new Zn-Pb
sulphide discovery at the Mato Prospect (see Figure 2, 3 and 4).
Drillhole assays returned include better intercepts of 29m @ 3.12 % Zn + Pb from 174m with a higher-grade
zone of 14m @ 5.04% Zn + Pb from 183m in EHRC734 and 9m @ 4.89% Zn + Pb from 180m in EHRC738,
which supported the initial discovery drill hole EHRC733 that returned 16m @ 5.09% Zn + Pb from 153m,
with a higher-grade internal zone of 10m @ 7.05% Zn + Pb. The latest results have confirmed Mato as a
significant new Zn-Pb sulphide discovery with the characteristics of a large mineralising system.
Figure 2- Mato Prospect and Chinook Deposit – Location plan with Drill Hole status and intersections
During the quarter, Rumble also received heritage survey clearance to allow for further drill testing along
the interpreted 9km x 3km mineralised footprint at the Mato Prospect. This heritage clearance has
importantly allowed the Company to drill along strike and up-dip of the Mato discovery (Figure 2 and 3). The
Company expects to receive the final assays for this recent phase of extensional drilling at Mato in Q1
CY2024.
Rumble Resources Limited - ASX: RTR
Page | 4
Figure 3 – Mato Prospect – Section 1 – RC Drill Hole Locations and Assay Results
Figure 4 - Mato Prospect – EHRC733-740 geology section with Drill Hole assay results.
Rumble Resources Limited - ASX: RTR
Page | 5
Metallurgical Diamond Drilling Completed - E69/3787 (100% RTR) and E69/3464 (75% RTR/
25% ZNC)
During the quarter, the Company completed 10 PQ3 diamond holes for 1462.7m (see Figure 5), which has
yielded an estimated 2300kg of representative metallurgical core sample. The diamond drilling campaign
was focused on the Chinook deposit, the largest of the pit constrained inferred sulphide resource areas at
Earaheedy, where a Mineral Resource Estimate (MRE) of 63Mt @ 3.0% Zn+Pb and 4.6g/t Ag (at a 2%
Zn+Pb cutoff) ,has been outlined within optimised pit shells – refer to Table A.
The diamond drill core was delivered to the metallurgical laboratory and testing has now commenced. The
metallurgical test program includes:
• pilot beneficiation trials (incl. dense media separation [DMS] and sensor ore sorting) that will assess
the potential to upgrade the significant volumes of lower grade Zn-Pb mineralisation highlighted within
the pit constrained MRE.
• early comminution test work.
• further detailed mineralogy and flotation optimisation testing, for future planned scoping level studies.
Beneficiation Background
DMS is a preconcentration method used for the early waste rejection from ores at coarser particle sizes
prior to additional milling and downstream processing.
It has been practiced in the mining industry for many years and could provide increased optionality for a
developing project like Earaheedy. This low cost and efficient processing technique has been shown to be
highly effective in modified Mississippi Valley Type (MVT) environments (refer to ASX release 23rd
November 2023. Slide 13) like Earaheedy (e.g. Pering Zn-Pb mine, South Africa)
The advantages of such preconcentration technologies include:
• An increase in the potential mining inventory due to a lowering of the cutoff grade. Thus, lower grade
material can be upgraded prior to milling, flotation and filtration. Earaheedy has a large volume of lower
grade mineralisation surrounding the reported MRE of 94Mt @ 3.1% Zn+Pb (at a 2% Zn+Pb cutoff)
refer to ASX release 19th April 2023, which occurs within the already optimised pits outlined.
Successfully upgrading this material could potentially lead to a much longer mine life.
• A potential reduction in capital and operating costs as a result of enhanced feed grades, thus fewer
tonnes are required to be processed and costs of energy, water and reagents are decreased, whilst the
size of the process plant is reduced.
• Removal of potentially high silicate waste early in the process, which is beneficial (i.e. leads to
reductions in grind energy consumption as well as providing low sulphur aggregates and by-products).
• Flotation and metal recoveries typically increasing with increasing metal feed grades.
Rumble Resources Limited - ASX: RTR
Page | 6
Figure 5 - Chinook - Metallurgical diamond Drill Hole Locations
Earaheedy Project Tenement Acquisitions
On 24th October the Company announced that it has entered into an agreement with Blaze Minerals Limited
(Blaze, ASX: BLZ) to acquire 100% title, inclusive of all data in four exploration licences E69/3815,
E69/3842, E69/3889 and E52/3879 located in the Earaheedy Basin (see Figure 6), approximately 120km
north of Wiluna, Western Australia. The only encumbrances relate to pre-existing 1% Net Smelter Return
(NSR) royalties over the tenements.
The consideration will be 2,291,047 shares (determined based on $250,000 worth of Rumble shares at a
deemed issue price of the 30-day VWAP up to, but not including the date of signing the agreement). The
consideration shares will be issued at completion of the acquisition, without Rumble shareholder approval
using Rumble’s existing placement capacity available under ASX Listing Rule 7.1.
The transfer of the tenements is subject to the Company receiving Ministerial consent to the transfer and
the Parties obtaining all necessary third-party approvals, including the assignment and assumption of any
third-party agreements (including the abovementioned royalty arrangements).
New Tenure Prospectivity
The acquisition of the four (4) granted exploration licenses (see Figure 6) comprising a total area of 434 km²
adds significantly to Rumble’s Earaheedy Project tenure portfolio, which now incorporates some 1760 km²
(including E69/3464 JV with Zenith) of highly prospective geological terrane that potentially could lead to
the discovery of additional Zn-Pb-Ag (Cu) deposits to compliment the current combined (pit constrained)
inferred mineral resource of 94Mt @ 3.1% Zn + Pb - refer to the Company’s ASX announcement of the 19th
April 2023 and Table A.
Within the four new tenements, historic work was mainly confined to E69/3815 (see Figures 1 and 6) where
a single RC drill-hole (completed in the 1980’s) returned shallow low-grade Zn – Pb mineralisation (20m @
0.52% Zn + Pb from 20m – TRC73). The area was followed up by Blaze Minerals Ltd (ASX:BLZ) in 2022
on very broad vertical RC drillhole line spacing (500-1500m apart) and with holes on average 500m apart
Rumble Resources Limited - ASX: RTR
Page | 7
along the traverses. This drilling led to Blaze intersecting further shallow low order Zn-Pb mineralisation
close to Rumble’s E69/3862 boundary with results including:
• 20m @ 0.83% Zn + Pb from 87m BERC8
• 22m @ 0.77% Zn + Pb from 113m BERC11
• 7m @ 0.65% Zn + Pb from 26m and 8m @ 0.50% Zn + Pb from 40m BERC6
The eastern portion of E69/3815 lies along strike from the recently discovered Mato Prospect. At Mato, a
single RC drill hole has returned 16m @ 5.09% Zn + Pb, including 10m @ 7.05% Zn + Pb (EHRC733) –
refer to the Company’s ASX announcement of the 5th of October 2023. This intersection has been interpreted
to occur proximal to a potential high grade feeder zone. Significantly, historic RC drill-hole BERC11
(completed by Blaze) lies 1900m west of drill-hole EHRC733 with no other drilling completed in between.
The Mato discovery is hosted within the Navajoh Unconformity Unit and the lower order Zn-Pb mineralisation
in the historic RC drill holes completed to the west in E69/3815 are interpreted to occur within the same host
unit.
The acquisition of E69/3815 opens an additional 30km of strike (see Figure 1), which potentially could lead
to the definition of further Zn-Pb mineralisation and/or deposits hosted within the laterally extensive Navajoh
Unconformity Unit. This could add significantly to the overall mineral resource inventory, as well as lead to
the discovery of further high grade mineralised MVT feeder structures.
Figure 6 – Earaheedy Project – Tenement status over Regional Geology
Rumble Resources Limited - ASX: RTR
Page | 8
Next Steps at the Earaheedy Project
•
Metallurgical studies
o
•
Discovery and Resource drilling
o
•
Variability and composite samples provided by diamond drilling will be collected to confirm the
simple and conventional flowsheet, and further improve the flotation performance. Additionally,
value adding beneficiation work (dense media separation and ore sorting) has now
commenced on the representative core from across the Chinook Deposit.
RC drilling aimed at defining the limits of the emerging world class Zn-Pb-Ag base metal
system within the Navajoh Unconformity Unit, with a focus on discovering new high-grade
zones (cf. Kalitan, Chikamin, Colorado and Magazine Feeder Faults) within the currently
outlined mineralised footprints in E69/3464, and along the 12km Sweetwater Trend (i.e. Mato
Prospect) that occur within the 100% RTR E69/3787 and E69/3862 tenements.
Scoping studies
o
Work will commence on initial supporting scoping studies for the Earaheedy Project following
flotation optimisation and beneficiation testing, which will review some of the possible future
development scenarios/options.
Maiden, pit constrained; Inferred Mineral Resource Estimate (MRE):
On the 19th of April 2023, the Company released the maiden, pit constrained, Inferred Mineral Resource
Estimate (MRE) for the Earaheedy Zn-Pb-Ag Project. The maiden resource contained 94Mt @ 3.1% Zn+Pb
and 4.1g/t Ag (at a 2% Zn+Pb cutoff) and was reported in accordance with the reporting requirements set
out in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (the JORC Code) (refer to Table A and ASX release 19 April 2023).
This maiden MRE confirmed the Earaheedy Project as one of the largest global zinc sulphide discoveries
in the last decade. The strength of the MRE is supported by a 41mt of higher-grade resources that could be
part of a possible early development scenario, and a much larger 462Mt resource that could potentially be
upgraded via beneficiation, providing the project with significant future flexibility.
Table A: Maiden Inferred Mineral Resource tabulation for the Earaheedy Project.
Cut off
Zn+Pb
Inferred – Chinook
Inferred – Tonka and Navajoh
Inferred Total
Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag Tonnes Zn+Pb Zn Pb Ag
%
Mt
%
%
%
g/t
Mt
%
%
%
g/t
Mt
%
%
%
g/t
0.5
334
1.3
0.9
0.4
2.3
128
1.5
1.2
0.2
1.9
462
1.3
1.0
0.3
2.2
1.0
135
2.1
1.5
0.6
3.4
59
2.3
2.0
0.4
2.6
194
2.2
1.6
0.5
3.1
2.0
63
3.0
2.1
0.8
4.6
31
3.3
2.8
0.5
3.4
94
3.1
2.4
0.7
4.2
2.5
39
3.4
2.4
0.9
5.2
25
3.5
3.0
0.5
3.6
65
3.4
2.6
0.8
4.5
3.0
24
3.8
2.7
1.1
5.7
17
3.9
3.3
0.6
3.8
41
3.8
3.0
0.9
4.9
4.0
7
4.7
3.3
1.5
6.8
5
4.9
4.1
0.8
4.3
12
4.8
3.6
1.2
5.7
Footnote: Inferred Mineral Resource is constrained within optimised pit shells and tabulated above at different economic Zn+Pb% cutoffs.
Rumble Resources Limited - ASX: RTR
Page | 9
1.2 Other Projects, Western Australia
Braeside Base Metal Project, East Pilbara, Western Australia
During the quarter, the Company completed an eleven hole, 568m slimline RC drill program and a three
hole 182.3m diamond drill program at the Braeside Project in the east Pilbara. The program was designed
to target high grade Pb Zn Ag Au mineralisation below coherent soil anomalies and gossans at the Barkers
Well Prospect where high grade shoots within pipe-like bodies have been delineated by earlier drilling
campaigns. Two diamond drillholes tested plunge extensions to previously defined shoots. A single diamond
tail tested a previously identified coincident chargeability and resistivity IP anomaly, interpreted to represent
disseminated pyrite and silica alteration associated with high grade Pb Zn Ag Au mineralisation. The slimline
RC program tested strike extensions to known mineralised pipes. Diamond sampling was completed in
December 2023 and results are expected in Q1 CY2024.
Fraser Range Gold Project, Fraser Range, Western Australia
During the quarter, the Company, along with representatives of the Ngadju Native Title claimants completed
a heritage survey at the Fraser Range Gold Project. The final clearance report was received in December
2023. The survey covered an east west traverse considered suitable for a project wide 1st pass aircore drill
program split across tenements E28/2924, E28/3062, and E28/3065.
No significant exploration activity was completed on the Company’s other regional projects (i.e., Warroo,
Munarra Gully, Lamil JV and Western Queen/Wardawarra). The Company continues to review opportunities
for these projects with the Company’s focus on rapidly advancing the emerging world class Earaheedy ZincLead-Silver Project.
Rumble Resources Limited - ASX: RTR
Page | 10
2. CORPORATE
2.1 Appointment of highly experienced mining executive as Managing Director and CEO
On the 25th of October the Company announced the appointment of experienced mining executive and
company director Peter Harold as Managing Director and Chief Executive Officer (MD and CEO), effective
from Monday 12 February 2024.
Mr Harold will oversee the Company’s next critical growth phase as it continues to expand and enhance the
emerging Tier 1 Earaheedy Zn-Pb-Ag Project in Western Australia.
Mr Harold is a process engineer and highly accomplished mining executive with over 30 years of strategic,
commercial, and corporate experience in the minerals industry. Prior to accepting the role of MD and CEO
at Rumble, Mr Harold was MD and CEO of Poseidon Nickel Limited (ASX: POS) for 3.5 years and was
instrumental in raising significant equity to allow the completion of the Bankable Feasibility Studies on the
Black Swan Nickel Project and the Windarra Gold Tailings Project and fund significant resource drilling and
exploration activities and Black Swan restart pre-works.
Prior to his time at Poseidon Peter was the Managing Director of Panoramic Resources Limited (ASX: PAN),
a company he cofounded as a $3 million IPO in 2001. Peter led Panoramic through the financing and
development of the Savannah Nickel Project in the East Kimberley and the acquisition and restart of the
Lanfranchi Nickel Project near Kambalda in the early 2000s with the company reaching a market
capitalisation of $1.2 billion in 2007.
Peter has been a non-executive director and chairman of numerous ASX listed companies and is currently
non-executive Chairman of Poseidon Nickel.
Rumble’s current interim Managing Director Peter Venn will transition to the role of Technical Director,
working closely with Mr Harold, and continuing to play a key role in delivery of the Company’s organic growth
model through exploration and development.
2.2 Cash and Investments
As at 31 December 2023, Rumble held $3.7 million in Cash.
Company announced to the ASX on the 5th of October 2023, that the SPP had raised $520k with the issue
of 3.8 million shares.
The Directors contributions in the capital raise (refer ASX release 14 August 2026) of $306k was approved
at the Company’s AGM on the 23rd of November, with the shares been issued on the 13 December 2023.
2.3 Appendix 5b – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as
disclosed in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling A$2.9 million.
Cash outflows for the December 2023 Quarter totalled $4.1 million across exploration activity (71%), staff
costs (20%), administration and corporate costs (9%).
Cash inflows for the December 2023 Quarter totalled $986k consisting of proceeds from the Capital raising
(83%), GST and fuel tax credits (13%), and interest received (4%).
2.4 Appendix 5b – Payments to related parties and their associates
Payments to related parties and their associates totalled $183k for the December 2023 quarter, consisting
of Technical Management, Executive and Non-Executive Director fees and salaries, geological consulting,
and superannuation payments.
Rumble Resources Limited - ASX: RTR
Page | 11
2.5 Tenement Holdings – Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Peter Venn, Interim Managing Director of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate
presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing the major
Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced drilling has rapidly
uncovered an emerging world class scale base metal system, with interpretative geology and drilling continuing to make new discoveries
and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1 regions of
Western Australia.
Rumble’s board and management team has a successful track record in making discoveries and project development
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy, and other Rumble Projects is based on and fairly
represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans
is a full-time employee of Rumble Resources Limited,. Mr Timmermans has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources in relation to the Earaheedy Project is based on and fairly
represents information compiled under the supervision of Mr Mark Carder who is a Member of the Australian Institute of Geoscientists
(AIG) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity to which he is undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. The Company confirms that it is not aware of any new information or data
that materially affects the Mineral Resource information included in the Announcements.
The Information in this announcement that relates to prior Exploration Results for the Earaheedy Project is extracted
from the following ASX announcements:
9th January 2024 – Metallurgical Diamond Drilling Completed Successfully
14th November 2023 – Diamond drilling commences at Earaheedy Project
31st October 2023 – Mato Discovery confirmed with further high-grade Zn-Pb
24th October 2023 – Acquisition Increase Further Zn – Pb Potential
5th October 2023 – High Grade Zinc-Lead intersected at the Mato Prospect
17th July 2023 - Zinc Lead Mineralisation Discovered in Drilling
1st June 2023 - High impact drilling commences at the Earaheedy Project
3erd May 2023 - Heritage Clearance Received for Navajoh Southeast Trend
19th April 2023 - Maiden Mineral Resource - Earaheedy (Zn-Pb-Ag) Joint Venture
14th March 2023 - Chinook Zn-Pb Prospect expands to 8km strike.
16th February 2023 - Multiple New High-Grade Feeder Targets Defined
5th December 2022 - Drilling Results from Lamil Gold-Copper Project
17th November 2022 - Exceptional Metallurgical Results at Earaheedy Project
3rd November 2022- High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information
included in the Announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Announcements. The Company confirms that it is not aware of any information or
data that materially affects the information included in the relevant market announcement and all material assumptions and technical
parameters underpinning the estimates in the original announcement in respect of the Earaheedy MRE continue to apply and have not
materially changed.
Rumble Resources Limited - ASX: RTR
Page | 12
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Thunderdome
E28/2366
Granted
Western Australia
30% Note 2
Thunderbolt
E28/2924
Granted
Western Australia
100%
Thunderbolt
E28/3062
Granted
Western Australia
100%
Thunderbolt
E28/3065
Granted
Western Australia
100%
Thunderbolt
E28/3240
Granted
Western Australia
100%
Thunderbolt
E28/3219
Granted
Western Australia
100%
Thunderbolt
E28/3220
Granted
Western Australia
100%
Thunderbolt
E28/3221
Granted
Western Australia
100%
Thunderbolt
E28/3313
Application
Western Australia
100%
Thunderbolt
E28/3352
Application
Western Australia
100%
Thunderbolt
E28/3384
Application
Western Australia
100%
Squall
E28/3155
Granted
Western Australia
100%
Braeside
E45/4873
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/2032
Granted
Western Australia
100%
Warroo
E45/5366
Granted
Western Australia
100%
Warroo
E45/5689
Granted
Western Australia
100%
Warroo
E45/5860
Application
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4063
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
E69/4124
Granted
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 13
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Western Queen
M59/0045
Granted
Western Australia
100%
Western Queen
M59/0208
Granted
Western Australia
100%
Western Queen
L59/40
Granted
Western Australia
100%
Western Queen
E20/0967
Granted
Western Australia
100%
Western Queen
E59/2443
Application
Western Australia
100%
Yelina
E38/3919
Application
Western Australia
100%
Yelina
E38/3920
Application
Western Australia
100%
Yelina
E38/3921
Application
Western Australia
100%
Yelina
E38/3922
Application
Western Australia
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Share your feedback
Discover