Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
ASX:RTR
JUNE 2026 QUARTERLY REPORT
ASX RELEASE I 31 JULY 2026
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of activities
conducted during the June 2026 Quarter as the Company advances its Western Queen Gold-Tungsten Project
toward production and explores its broader Western Australian gold and base metal exploration portfolio.
KEY HIGHLIGHTS
WESTERN QUEEN GOLD-TUNGSTEN PROJECT
1. Development Pathway Advanced
• Execution of the Toll Milling and Blending Agreement with Gylden Resources1
and Kirkalocka Gold to
process gold bearing ore from Western Queen at Kirkalocka Gold’s 2.1Mtpa processing plant for up to five
years, commencing when the first parcel of Western Queen ore is processed at Kirkalocka.
• Delivered an upgraded gold Mineral Resource Estimate of 5.13Mt @ 2.6g/t Au for 433,600oz2
, a 17%
increase in contained gold compared to the July 2025 estimate and 54% increase in Indicated
Resources to 2.46Mt @ 2.9g/t Au for 227,700oz (adding 79,700oz to the Indicated category).
• Commenced updating the Western Queen November 2025 Gold Scoping Study ahead of delivery of the
Feasibility Study with AMC Consultants progressing detailed mine design and the Company advancing
mining contractor selection and pre-development planning.
• Continued technical, commercial and permitting workstreams to support a future Final Investment Decision,
including mining studies, permitting approvals and funding initiatives.
2. Drilling and Resource Growth
• Completed the diamond drilling program at Western Queen in mid-April 2026, focusing on high-grade infill
and down-plunge extensions at Western Queen South and Western Queen Central.
• The drilling program identified a new high-grade zone at Western Queen Central comprising 145kt
@ 11.3g/t Au for 52,500oz, situated directly below the historical underground workings and immediately
down-plunge from the existing open pit.
• Key objectives of the 17,255m diamond drill program were to grow the existing Western Queen gold Mineral
Resource Estimate, upgrade a significant portion of Inferred Resources to the Indicated category at
Western Queen South, test up and down-plunge extensions at Western Queen South and Central, support
geotechnical assessment of the proposed underground development areas and grow and upgrade the
Western Queen tungsten Mineral Resource.
• Evaluated drill program results and updated geological models, culminating in the delivery of an upgraded
Mineral Resource Estimate (MRE) in July. This updated estimate will now be integrated into a revised
mining schedule to support a revised Scoping Study and follow on Feasibility Study.
1
Refer Rumble ASX release dated 19 May 2026 “Toll Milling and Blending Agreement for Western Queen gold ore executed with Gylden and
Kirkalocka Gold”
2
Refer Rumble ASX release dated 24 June 2026 “Western Queen Gold Resources upgraded to 433koz with 228koz now in Indicated
category and a new high-grade zone of 53koz @ 11.3g/t gold”
2
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
3. Tungsten Opportunity Progressed
• Continued development of the tungsten scoping study evaluating mining, processing, offtake, metal
payability, logistics and capital requirements.
• Continued to assess the potential to integrate tungsten recovery with the proposed Western Queen gold
mining and processing pathway.
• Previous metallurgical testwork confirmed a marketable tungsten concentrate grading 48% WO3 at 45%
recovery can be produced via a conventional gravity circuit.
• The Toll Milling and Blending Agreement with Gylden provides for future negotiation regarding the potential
development of a facility to process tungsten-bearing ore from Western Queen at Kirkalocka.
4. Mine Development, Toll Treatment and Permitting
• Continued to progress the Western Queen underground mining Feasibility Study, with work focused on
mining inventory, scheduling, geotechnical evaluation, mining costs, development capital, processing
pathway and project execution planning.
• The Toll Milling and Blending Agreement with Gylden covers 100% of forecast gold ore production from
Western Queen, for up to five years and provides for either parcels of 75,000 tonnes of Western Queen
ore blended 50/50 with Gylden ore or dedicated 150,000 tonne Western Queen ore parcels.
• Permitting activities continued during the quarter, with the Company awaiting the Groundwater Licence and
Mine Development and Closure Proposal approval required to support pre-development activities.
• Appointed Jake Campbell, an experienced mine operator, as General Manager Operations to take Western
Queen project through development and into production.
MUNARRA GULLY GOLD-COPPER-SILVER PROJECT
Rumble conducted an air core and RC drill program totalling 3,648m in May 2026. The drilling intercepted a number
of high-grade gold zones along the Amaryllis Shear Zone including3:
• MGRC26011: 13m @ 21.64 g/t Au from 122m
- incl. 5m @ 55.56 g/t Au from 124m
- incl. 1m @ 221.00 g/t Au from 124m
- concurrent with 7m @ 0.52% Cu from 128m
Follow-up drilling is being planned for H2 CY26.
EARAHEEDY ZINC-LEAD-SILVER PROJECT
Rumble continued to advance metallurgical and technical evaluation work at the Earaheedy Zinc-Lead-Silver
Project during the quarter. The key work stream is metallurgical testwork to determine whether a separate high-
grade zinc concentrate and a silver rich lead concentrate can be produced from the bulk concentrate material.
CORPORATE
The Company remains well funded after securing A$10 million during the quarter by selling a 2.5% Net Smelter
Return royalty on gold production from Western Queen to a subsidiary of Elemental Royalty Corporation.
3Refer Rumble ASX release dated 20 July 2026 “Drilling at Munarra Gully returns intercept of 5m @ 55.60 g/t gold”
3
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals. During the June 2026 Quarter, the Company prioritised Western Queen development
activities while continuing work programs across selected exploration projects.
Figure 1 – Location of Company’s Projects
4
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Western Queen Gold-Tungsten Project, Mt Magnet, Western Australia
The Western Queen Project is located approximately 110km northwest of Mt Magnet in Western Australia. During
the quarter, Rumble continued to advance technical, commercial and permitting workstreams required to support a
future Final Investment Decision for the proposed underground mining operation.
Figure 2 – Location of Western Queen mining leases in relation to Kirkalocka
Exploration Drilling at Western Queen
During the quarter, Rumble announced an upgraded gold Mineral Resource Estimate (MRE) for the Western Queen
Project of 5.13Mt @ 2.6g/t Au for 433,600oz4
, representing a 17% increase in overall contained gold compared to
the July 2025 estimate.
The upgrade incorporates 17,255m of diamond drilling completed between October 2025 and April 2026 and has
delivered a 54% increase in Indicated Resources to 2.46Mt @ 2.9g/t Au for 227,700oz (refer Table 1 and Figure
3).
4
Refer Rumble ASX release dated 20 July 2026 “Western Queen Gold Resources upgraded to 433koz with 228koz now in Indicated category
and a new high-grade zone of 53koz @ 11.3g/t gold””
5
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Table 1 - Gold Mineral Resource Estimate tabulation for the Western Queen Project by Resource Area, split by
Indicated and Inferred Resources and reported at open pit and underground economic cut-offs.
Western Queen Gold Deposit June 2026 Mineral Resource Estimate
June 2026 Mineral Resource Estimate (0.5g/t Au Cut-off Above 245mRL; 1.5g/t Au Cut-off Below 245mRL)
Indicated Inferred Total
Prospect Tonnage Au Au Tonnage Au Au Tonnage Au Au
kt g/t Ounces kt g/t Ounces kt g/t Ounces
WQS 1,840 2.3 134,600 1,240 2.3 91,500 3,080 2.3 226,100
WQC 370 6.5 76,800 820 3.0 78,800 1,190 4.1 155,600
including WQC HG 144 11.3 52,300 1 8.1 200 145 11.3 52,500
WQS + WQC total 2,210 3.0 211,400 2,060 2.6 170,300 4,270 2.8 381,700
Princess 220 1.3 9,400 520 1.8 29,200 740 1.6 38,600
Duke 30 7.1 6,900 10 7.1 3,100 40 7.1 10,000
Cranes 80 1.4 3,300 80 1.4 3,300
Grand Total 2,460 2.9 227,700 2,670 2.4 205,900 5,130 2.6 433,600
Notes: Mineral Resources reported on a dry in-situ basis.
• The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of Ashmore Advisory and a Member of the
AIG. Mr. Shaun Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
that he has undertaken to qualify as a Competent Person as defined in the JORC Code (2012).
• All Mineral Resources figures reported in the table above represent estimates as of June 2026. Mineral Resource estimates are not precise calculations,
being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available sampling results.
• Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The
Joint Ore Reserves Committee Code – JORC 2012 Edition).
• Cranes Mineral Resource figures are derived from the 2024 Mineral Resource estimate.
The objectives of the drill program were to support resource growth, increase confidence in the existing resource
base, assess up and down-plunge extensions, provide geotechnical information for underground development
planning and evaluate the potential to grow and upgrade the tungsten Mineral Resource.
The upgraded gold resource also defined a new high-grade zone at Western Queen Central comprising 145kt @
11.3g/t Au for 52,500oz. The zone is located directly below the historical underground workings and represents an
important addition to the Western Queen development inventory and ongoing mine planning activities.
Figure 3 – Western Queen Gold Deposit Longitudinal Section – Highlighting Previous Production, Resources and
Potential New Resource Areas
6
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Mine Development, Toll Treatment and Permitting
Western Queen Underground Feasibility Study
Rumble continued to progress the Feasibility Study for underground mining at Western Queen during the quarter.
The upgraded gold Mineral Resource Estimate will be incorporated into an updated mining schedule, with
workstreams including mining inventory assessment, mine scheduling, geotechnical evaluation, mining costs,
development capital and execution planning. The Western Queen November 2025 Gold Scoping Study is also
being updated ahead of delivery of the Feasibility Study, with mine development remaining on track for production
to commence in 2027.
Third Party Processing
During the quarter, Western Queen Pty Ltd, a wholly owned subsidiary of Rumble, executed a Toll Milling and
Blending Agreement with Gylden Resources Pty Ltd (Gylden) and Kirkalocka Gold SPV Pty Ltd (Kirkalocka Gold)
for the processing of Western Queen gold ore at Kirkalocka Gold’s 2.1Mtpa processing plant, 180km south-east of
Western Queen.
The Agreement provides the Company with a toll treatment pathway for 100% of forecast gold ore production from
Western Queen for a period of four years and eleven months commencing when the first parcel of Western Queen
ore is processed at Kirkalocka.
Western Queen ore may be processed in campaigns of 75,000 tonnes blended 50/50 with Gylden ore, or in
dedicated campaigns of 150,000 tonnes, if Western Queen ore is processed separately. Milling and blending fees
are fixed for calendar year 2027 and will be negotiated annually for subsequent years. Rumble retains 100% of its
share of recovered gold from each campaign, with no profit share.
The parties also agreed to negotiate in good faith the development of a facility to process tungsten-bearing ore from
Western Queen at Kirkalocka should Rumble decide to mine tungsten-bearing material. Ramelius Resources
Limited advised Rumble on 27 May 2026 it would not be exercising its pre-emptive rights to process ore from
Western Queen.
Permitting
All required approvals to allow underground mining to be undertaken, including the Mining Proposal, Mine Closure
Plan, Works Approval and ancillary permits, have been submitted to the relevant government departments. To date,
the Works Approval and Native Vegetation Clearance Approval have both been obtained.
The Mine Development and Closure Proposal and Groundwater Licence remain outstanding. Once all permits and
approvals are granted, the Western Queen South open pit will be dewatered prior to cutting the underground portal
and commencement of the decline development.
Western Queen Royalty Funding
During the quarter, Rumble completed the Western Queen royalty funding transaction with Elemental Royalty, a
subsidiary of Elemental Royalty Corporation.
Under the agreement, Elemental Royalty acquired a 2.5% net smelter return royalty over gold production from
Western Queen for a total consideration of A$10 million, replacing the existing A$6–20 per ounce gold royalty.
Both payments under the transaction were received during the quarter, providing non-dilutive capital to support
Western Queen pre-development activities.
Tungsten Metallurgy
During the quarter, Rumble continued to advance assessment of the tungsten opportunity at Western Queen,
including processing options and the potential integration of tungsten recovery with the broader Western Queen
gold development and processing pathway.
7
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
The maiden Western Queen tungsten Mineral Resource Estimate of 4.31Mt @ 0.31% WO3 for 13.2Kt WO3 at a
0.1% WO3 cut-off was reported in August 20255. The maiden resource contained a higher-grade portion of 1.44Mt
@ 0.51% WO3 for 7.4Kt WO3 at a 0.3% WO3 cut off (refer Table 2 and Figure 4).
Table 2 – Tungsten Mineral Resource Estimate tabulation for the Western Queen Project by Resource Area
Western Queen August 2025 Tungsten Mineral Resource Estimate
(0.1% WO3 Cut-off)
Inferred Mineral Resource
Prospect Tonnage WO3 WO3
kt % t
WQS 2,710 0.34 9,200
WQC 790 0.27 2,200
Princess 810 0.22 1,800
Total 4,310 0.31 13,200
Notes:
• Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
• The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of Ashmore Advisory and a Member of
the AIG. Mr. Shaun Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity that he has undertaken to qualify as a Competent Person as defined in the JORC Code (2012).
• All Mineral Resources figures reported in the table above represent estimates as at August 2025. Mineral Resource estimates are not precise
calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available
sampling results.
• Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Figure 4 – Maiden Western Queen Tungsten MRE showing extents of WO3 lodes and diagrammatic contoured block
grades displaying emerging high-grade trends and the select significant WO3 intercepts
5
Refer Rumble ASX release dated 11 August 2025 “Maiden Tungsten Resource of 13,200 tonnes of WO3 highlights
the exceptional potential of the Western Queen Project”
8
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Metallurgical testwork has demonstrated the potential to produce a marketable tungsten concentrate grading 48%
WO₃ at 45% recovery utilising the flowsheet shown in Figure 5.
As part of the Toll Milling and Blending Agreement executed with Gylden Resources during the quarter, the parties
agreed to negotiate in good faith in relation to the potential development of a facility to process tungsten-bearing
ore from Western Queen at Kirkalocka, should Rumble decide to mine tungsten-bearing material.
Rumble also continued work on a tungsten Scoping Study assessing mining, processing, offtake, metal payability,
logistics and capital requirements, with the study intended to inform whether tungsten-bearing material can be
incorporated into the Western Queen development plan.
The flowsheet concept developed for the gold and scheelite is shown in Figure 5.
Figure 5 - Western Queen Flowsheet Concept
Other key workstreams to advance the tungsten opportunity at Western Queen include:
Scoping Study
The Scoping Study underway is aimed at fast-tracking production by integrating tungsten-bearing ore into the
existing gold mining plan.
Commercial Offtake and Logistics
Discussions have commenced with various parties to determine metal payability and freight costs for the Scoping
Study’s financial model.
Flowsheet Optimisation and Capex Reduction
Rumble commenced evaluation of the accelerated "coarse-liberation" concept, which seeks to recover scheelite
from the mill's recirculating load that could reduce capital costs and speed up implementation without
compromising the finer grind required for gold extraction.
9
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
Other Exploration Projects, Western Australia
Earaheedy Zinc-Lead-Silver Project, Wiluna, Western Australia
Rumble continued to advance metallurgical and technical evaluation work at the Earaheedy Zinc-Lead-Silver
Project. Metallurgical testwork is underway to determine whether a separate high-grade zinc concentrate and a
silver rich lead concentrate can be produced from the bulk concentrate material.
No material new exploration results were released for Earaheedy during the quarter.
Warda Warra – Au, Li-Cs-Ta, Ni-Cu-Co, Project, Mt Magnet, Western Australia
During the quarter, 21 blocks were relinquished from E20/967. These blocks were north of the Sandford River and
were not considered prospective. Subsequent to the end of the quarter, two applications (E59/2816 and
E59/3021) were granted.
No material exploration results were released for Warda Warra during the quarter.
Munarra Gully Gold-Copper-Silver Project, Western Australia
A program consisting of 28 air core holes for 1,933m and 12 RC holes for 1,715m (total of 3,648m) was completed
in May 20266. Highlights include:
• 13m @ 21.64 g/t Au from 122m in hole MGRC26011
- incl. 5m @ 55.56 g/t Au from 124m
- incl. 1m @ 221.00 g/t Au from 124m
- concurrent with 7m @ 0.52% Cu from 128m
Further significant gold and copper results include:
• 7m @ 2.15 g/t Au from 132m (MGRC26007)
- concurrent with 4m @ 0.62% Cu from 132m
• 7m @ 3.86 g/t Au from 65m (MGRC26012)
- incl. 1m @ 26.10 g/t Au from 68m
• 1m @ 5.86 g/t Au from 149m (MGRC26006)
- concurrent with 6m @ 0.39% Cu from 140m
- incl. 1m @ 1.54% Cu from 140m
Follow-up drilling is planned for H2 CY26.
Braeside Base Metal Project, East Pilbara, Western Australia
No material exploration results were released for Braeside during the quarter.
Tenement E45/2032 expired during the quarter. Rumble elected not to renew the tenement.
Thunderstorm Gold Project, Fraser Range, Western Australia
No material new exploration results were released for Thunderstorm during the quarter, following completion of
the Company’s acquisition of the project earlier in 2026.
During the quarter, Rumble carried out a heritage survey at Thunderstorm ahead of a planned 5,000 metres AC
drill program scheduled to commence in late 2026.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
No material exploration results were released for Warroo during the quarter.
6
Refer to Rumble ASX release 20 July 2026 “Munarra Gully reinterpretation leads to high-grade drilling success”
10
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
CORPORATE
Capital Management and Funding
The Company continued to evaluate funding options to support the development of Western Queen and maintain
exploration activity across its portfolio. During the quarter, Rumble completed the Western Queen gold royalty
funding transaction with Elemental Royalty, receiving total consideration of A$10 million for the sale of a 2.5% net
smelter return royalty over gold production from Western Queen. The transaction provided non-dilutive capital to
support pre-development activities, including dewatering, feasibility, permitting and mine planning workstreams.
Lamil Project Divestment
During the quarter, Rumble and AIC Mines Limited entered into a Tenement Sale Agreement with Aventine
Resources Limited for the sale of their respective interests in Exploration Licence E45/5271, comprising the Lamil
Joint Venture. Under the agreement, Aventine will acquire a 100% legal and beneficial interest in E45/5271 and
associated geological information.
Rumble will receive A$250,000 in cash, Aventine shares to a value of A$300,000 calculated using a deemed issue
price equal to Aventine’s IPO share price, and a 0.5% net smelter return royalty. Completion remains conditional
on satisfaction of conditions precedent, including heritage assignment steps and ASX and IPO-related confirmations
by Aventine.
Financial Position
As at 30 June 2026, Rumble held approximately $11.09 million in cash.
Appendix 5B – Quarterly Cash Flow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $1.16 million.
Cash outflows for the June 2026 Quarter totalled $1.92 million across exploration activity (64%), staff costs (19%),
administration and corporate costs (17%).
Cash inflows for the June 2026 Quarter totalled $10.16 million, comprising royalty proceeds (98%), government
rebates or other receipts (1.5%) and interest received (0.5%).
Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $240K for the quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, superannuation
payments and travel expense reimbursements.
Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorisation
This announcement was approved for release by the Board of the Company.
-ENDS-
For further information please refer to the Company’s website www.rumbleresources.com.au or contact
info@rumbleresources.com.au
Peter Harold
Managing Director & CEO
Peter Venn
Technical Director
Trevor Hart
Chief Financial Officer
11
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
About Rumble Resources
Rumble Resources is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold-Tungsten Project which is
being developed to deliver near term cash flow from the existing underground resources and resource growth
through future exploration success.
In addition, the discovery of the Earaheedy Zinc-Lead-Silver Project has demonstrated the capabilities of the
exploration team to find world class orebodies.
Competent Person Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects is
based on and fairly represents information compiled by Mr Peter Venn and Mr Simon Davies, who are Members of
the Australian Institute of Geoscientists. Mr Peter Venn and Mr Simon Davies are full-time employees of Rumble
Resources Limited. Mr Peter Venn and Mr Simon Davies have sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as
Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Peter Venn and Mr Simon Davies consent to the inclusion in the report
of the matters based on this information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and
resources, production levels and rates, costs, prices, future performance or potential growth of Rumble Resources
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Rumble Resources
Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or
a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the
requirements of Australian securities laws, which may differ from the requirements of United States and other
country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or
incorporated by reference in this document have been, and will be, prepared in accordance with the JORC
classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geoscientists.
12
ASX:RTR
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
APPENDIX 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage Interest
Braeside E45/4368 Granted Western Australia 100%
Copper Hills E46/1614 Application Western Australia 100%
Copper Hills E46/1626 Application Western Australia 100%
Earaheedy E69/3464 Granted Western Australia 75% Note 1
Earaheedy E69/3787 Granted Western Australia 100%
Earaheedy E69/3815 Granted Western Australia 100%
Earaheedy E69/3862 Granted Western Australia 100%
Earaheedy E69/4062 Application Western Australia 100%
Earaheedy E69/4099 Application Western Australia 100%
Earaheedy L69/0058 Application Western Australia 75% Note 1
Earaheedy M69/0150 Application Western Australia 75% Note 1
Irregully E08/3841 Application Western Australia 100%
Lamil E45/5271 Granted Western Australia 50% Note 4
Munarra Gully P51/3481 Application Western Australia 100%
Munarra Gully E51/1677 Granted Western Australia 80% Note 3
Munarra Gully E51/1919 Granted Western Australia 100%
Munarra Gully E51/1927 Granted Western Australia 100%
Saltbush E45/6975 Application Western Australia 100%
Talbot E46/1604 Application Western Australia 100%
Thunderbolt E28/3219 Granted Western Australia 100%
Thunderbolt E28/3240 Granted Western Australia 100%
Thunderbolt E28/3384 Application Western Australia 100%
Thunderbolt E28/3500 Application Western Australia 100%
Thunderbolt E45/3566 Granted Western Australia 100%
Thunderstorm E28/2528 Granted Western Australia 100% Note 2
Thunderstorm E28/2529 Gra