JUNE 2026 QUARTERLY REPORT
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
ASX RELEASE I 30 October 2026
SEPTEMBER QUARTERLY ACTIVITIES REPORT
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of activities
conducted during the September 2026 Quarter in which the Company continued to advance the Western Queen
Gold-Tungsten Project toward development, reported high-grade gold-copper drilling results at Munarra Gully,
appointed an experienced General Manager Operations and commenced a program of regional exploration drilling
across Wardawarra and Munarra Gully.
HIGHLIGHTS
1. WESTERN QUEEN GOLD-TUNGSTEN PROJECT
• Jake Campbell appointed as General Manager Operations to lead Western Queen through development
and into steady-state operations
• Work continued on technical, permitting, funding and execution planning for the proposed underground
development
• Revised Mineral Resource Estimate of 3.92Mt @ 3.1 g/t for 393,100ozs optimised for underground mining
released1. Resource grade increased by 19% to 3.1 g/t Au, including a 27% grade increase in Indicated
Resources at Western Queen South
• Updated gold-only Scoping Study on Western Queen demonstrating potential for a significantly longer
mine life and more than double the gold production, compared to the November 2025 Western Queen
South Scoping Study2
• Work now focused on incorporating the tungsten resources into the mine plan which could add a
valuable additional revenue stream. Metallurgical test work and preliminary marketing discussions
indicate that a saleable scheelite concentrate can be produced
• A structural review of the Western Queen Project and surrounding Wardawarra Greenstone Belt to identify
regional settings analogous to the Western Queen deposits identified a priority target approximately
7km north of Western Queen Central. A drill program was completed during September, results
awaited
2. MUNARRA GULLY COPPER–GOLD PROJECT
• Reported the highest grade drilling result achieved at Munarra Gully to date from hole MGRC260113:
o 13m @ 21.64g/t Au from 122m;
o including 5m @ 55.56g/t Au from 124m;
o concurrent with 7m @ 0.52% Cu from 128m.
1
Refer to Rumble ASX release 28 October 2026 “Western Queen Gold MRE Optimised for Underground Mining Study”
2
Refer to Rumble ASX release 28 October 2026 “Western Queen Scoping Study”
3
Refer to Rumble ASX release 20 July 2026 “Munarra Gully Drilling Returns High-Grade Gold-Copper Result”
2
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
• Other significant results included:
o MGRC26007: 7m @ 2.15g/t Au from 132m, concurrent with 4m @ 0.62% Cu from 132m;
o MGRC26012: 7m @ 3.86g/t Au from 65m, including 1m @ 26.10g/t Au from 68m; and
o MGRC26006: 1m @ 5.86g/t Au from 149m, concurrent with 6m @ 0.39% Cu from 140m,
including 1m @ 1.54% Cu from 140m.
3. CORPORATE
• Cash balance at 30 September 2026 of $8.3 million
• Board refresh underway with Matthew Banks and Michael Smith stepping down and a short list of new
directors under consideration
• Released the Company’s Annual Report for the year ended 30 June 2026 on 30 September 2026.
• The Company’s 2026 Annual General Meeting is scheduled to be held at 2:00pm AWST on Friday, 27
November 2026 at the Celtic Club, 48 Ord Street, West Perth, Western Australia.
3
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced project portfolio in Western Australia hosting a mixture of gold, base metals
and specialty metals. During the September 2026 Quarter, the Company prioritised Western Queen development
activities while continuing work programs across selected exploration projects.
Figure 1 – Location of Company’s Projects
4
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Western Queen Gold-Tungsten Project, Mt Magnet, Western Australia
During the September 2026 Quarter, Rumble continued to advance the Western Queen Gold-Tungsten Project
toward development. The Company appointed Jake Campbell as General Manager Operations, effective 10 August
2026. Mr Campbell has more than 15 years’ experience in underground mining, project development,
commissioning and operations and will lead the operational planning and development of Western Queen.
Updated Scoping Study
The Company continued work on the Updated Scoping Study incorporating material from Western Queen South
and Western Queen Central with ore to be toll treated at the Kirkalocka processing plant (Figure 2) under the Toll
Milling and Blending Agreement with Gylden Resources Pty Ltd (“Gylden”)4 executed in the previous quarter. The
study was released subsequent to the quarter5 with key findings including:
• Resources utilised - The Study considers underground mining of the Western Queen South and Central
Resources using uphole stoping with paste fill due to simple, steep-dipping deposit geometry. The Study
incorporates the optimised October 2026 gold Mineral Resource Estimate6 of 3.92Mt @ 3.1g/t Au for
393,100oz, including Indicated Resources of 1.87Mt @ 3.7g/t Au for 223,800oz;
• Production Target - 1.2Mt at 3.2g/t for 125koz contained gold over an initial production period four years
at a production rate of approximately 30kt mineralised material per month when at full production;
• Processing - Mineralised material to be blended and toll treated at Kirkalocka on a campaign basis in
75,000 tonne batches. Historical production and metallurgical testwork indicates recoveries of 90-94% gold
are achievable, while the Study has assumed a 92% recovery given that the ore will be blended (more
testwork is required to confirm recoveries for the blended ore);
• Economics - Free cash flow of $133M, a pre-tax NPV (at 8% discount rate) of $86M and an IRR of 45%
at a gold price of A$5,714/oz7;
• All in sustaining costs - A$4,390/oz gold sold;
• Low upfront capital ~$8M; and
• Potential to extend mine life - Only approximately 30% of the current Mineral Resource at Western Queen
is included in the mining production target of this Study, providing additional opportunities to extend Project
life and life of mine (LOM) production.
Work is now focused on incorporating the tungsten resources into the mine plan which could add a valuable
additional revenue stream. Metallurgical test work and preliminary marketing discussions indicate that a saleable
scheelite concentrate can be produced
Next steps include a Feasibility Study incorporating the tungsten, metallurgical testwork to confirm gold and
tungsten recoveries, sourcing finance, obtaining all regulatory approvals, and progressing to a Final Investment
Decision.
4
Refer to Rumble ASX release 19 May 2026 “Toll Milling and Blending Agreement for Western Queen gold ore executed with Gylden and
Kirkalocka Gold
5
Refer to Rumble ASX release 28 October 2026 “Western Queen Scoping Study”
6
Refer to Rumble ASX release 28 October 2026 “Western Queen MRE Optimised for
Underground Mining Study”
7
Refer to the economic parameters and design assumptions described in Rumble ASX release 28 October 2026 “Western Queen Scoping
Study”.
5
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Figure 2 – Location of Western Queen mining leases in relation to Kirkalocka
Optimised Mineral Resource Estimate
Rumble released a revised Mineral Resource estimate on 28 October 2026 which has been optimised for
underground mining studies. The optimised Resources total 3.92Mt @ 3.1g/t Au for 393,100ozof contained gold
(refer Table 1 and Figure 3). This represents a 19% increase in total resource grade to 3.1g/t Au, for only 9%
reduction in total ounces compared to the June 2026 resource. Most importantly, Indicated Resources at Western
Queen South and Central increased 27% in grade with a negligible 1% reduction of ounces. The optimised gold
resource also retains the high-grade zone at Western Queen Central, now comprising 129kt at 11.6 g/t Au for
48,500 oz of gold and located directly below the historical underground workings.
6
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Table 1 - Gold Mineral Resource Estimate tabulation for the Western Queen Project by Resource Area, split by
Indicated and Inferred Resources and reported at open pit and underground economic cut-offs.
Notes: Mineral Resources reported on a dry in-situ basis.
• The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of Ashmore Advisory and a Member of the
AIG. Mr. Shaun Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
that he has undertaken to qualify as a Competent Person as defined in the JORC Code (2012).
• All Mineral Resources figures reported in the table above represent estimates as of October 2026. Mineral Resource estimates are not precise
calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available
sampling results.
• Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The
Joint Ore Reserves Committee Code – JORC 2012 Edition).
• Cranes Mineral Resource figures are derived from the 2024 Mineral Resource estimate.
Figure 3 – Western Queen Gold Deposit Longitudinal Section – Highlighting Previous Production, Resources and
Potential New Resource Areas
7
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Resource Drilling
Rumble drilled 17 slimline RC holes for 1,180m at Cranes Prospect on M59/208 during September. This drilling
was part of the Wardawarra drill program and was planned to better define the Cranes mineral resource for potential
inclusion in future development studies. Assay results are awaited.
Environment and Permitting
All required approval applications to allow underground mining to be undertaken, including the Mine Development
and Closure Proposal, Works Approval and ancillary permits, have been submitted to the relevant government
departments. The Works Approval, Native Vegetation Clearance Approval and, more recently, the Groundwater
Extraction Licence for dewatering of Western Queen South open pit have been granted. The Mine Development
and Closure Proposal is the last outstanding major approval.
During August, a passive seismic program was conducted over two areas that were considered to potentially host
hypersaline paleochannels as possible re-injection sites for pit dewatering. Three water monitoring holes were
drilled on E20/967 to test the paleochannels. Initial results indicated that a highly saline paleochannel was
encountered in two of the holes. Further drilling is planned to follow up on these results.
Tungsten Study
During the quarter, Rumble continued to advance the tungsten opportunity at Western Queen. Western Queen
contains a tungsten Mineral Resource Estimate of 4.31Mt @ 0.31% WO3 for 13,200t contained WO3, which occurs
within and adjacent to the gold mineralisation. Initial metallurgical testwork and preliminary marketing discussions
indicate that a saleable scheelite concentrate can be produced.
The known tungsten resources could potentially be mined in conjunction with the gold and processed at Kirkalocka
(subject to positive outcomes from additional metallurgical testwork, suitable studies being completed, and Gylden
making any plant modifications to recover tungsten). Work has now commenced on a mining study to quantify the
amount of gold and tungsten-bearing material that could be mined.
Other Exploration Projects, Western Australia
Earaheedy Zinc-Lead-Silver Project, Wiluna, Western Australia
Rumble continued to advance metallurgical and technical evaluation work at the Earaheedy Zinc-Lead-Silver
Project. Early metallurgical results from the Chinook deposit show that a separate zinc concentrate and lead-silver
concentrate can be produced by differential flotation using standard reagents. To complete this metallurgical work
program a diamond drilling program is being planned to provide a suitable sample from the Tonka deposit for further
metallurgical test work. Given that the Tonka deposit has an average zinc:lead ratio of 6:1 Tonka should also
separate into a zinc concentrate and a lead-silver concentrate.
Subsequent to the quarter end, Rumble made voluntary partial surrenders of tenements E69/3862 (4 blocks) and
E69/3787 (27 blocks).
Wardawarra Regional Gold Exploration, Mt Magnet, Western Australia
During the quarter, Rumble completed further regional targeting work across the Wardawarra Project surrounding
Western Queen. Model Earth Global Geological Services completed a structural review to identify structural settings
across the Wardawarra Greenstone Belt that may be analogous to the Western Queen deposits.
Three prospective structural positions were identified. The priority target is a 2km by 1km area located
approximately 7km north of Western Queen Central. A heritage survey with the Wajarri Yamaji People was
completed during August 2026 and 48 aircore holes for 2,045m were drilled over the priority target area in
September. Assays results are awaited.
During July, two exploration tenement applications, E59/2816 and E59/3021 were granted.
8
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Munarra Gully Gold-Copper-Silver Project, Western Australia
During the quarter, Rumble released results from the reverse circulation and aircore drilling program completed at
the Munarra Gully Gold-Copper Project. The program comprised 28 aircore holes for 1,933m and 12 reverse
circulation holes for 1,715m, for a total of 3,648m.
The program tested the Amaryllis Shear Zone by extending drilling beneath historical holes that did not effectively
test fresh rock and by infilling previously untested sections of the mineralised structure.
Hole MGRC26011 returned the highest-grade result achieved at Munarra Gully to date:
• 13m @ 21.64g/t Au from 122m;
• including 5m @ 55.56g/t Au from 124m;
• including 1m @ 221.00g/t Au from 124m; and
• concurrent with 7m @ 0.52% Cu from 128m.
Other significant results included:
• MGRC 26007: 7m @ 2.15g/t Au from 132m, concurrent with 4m @ 0.62% Cu from 132m;
• MGRC26012: 7m @ 3.86g/t Au from 65m, including 1m @ 26.10g/t Au from 68m; and
• MGRC26006: 1m @ 5.86g/t Au from 149m, concurrent with 6m @ 0.39% Cu from 140m, including 1m
@ 1.54% Cu from 140m.
Subsequent to the quarter a follow-up drill program commenced but was cut short due to technical difficulties. Assay
results are awaited for three holes. Further RC drilling and a diamond hole are planned.
Thunderstorm Gold Project, Fraser Range, Western Australia
Rumble continued planning a drilling program at the 100%-owned Thunderstorm Gold Project in the Fraser Range.
The proposed program comprises up to 5,000m of aircore and reverse circulation drilling to test both palaeochannel
and structurally hosted basement gold targets at the Gazelle and Pion prospects.
Historical drilling at Gazelle returned intersections including 16m @ 6.69g/t Au from 42m, including 4m @ 22.2g/t
Au from 50m, and 6m @ 9.15g/t Au from 48m. At Pion, historical drilling returned 4m @ 3.80g/t Au from 86m.
A heritage survey was completed with the Ngadju People and approximately 7,400m of drill lines were heritage
cleared ahead of the planned program.
Subsequent to the quarter three tenements, E28/2528, E282529, and E28/3384 were surrendered. A voluntary
partial surrender of E28/2595 was also initiated. Surrendered ground was assessed to have been sufficiently tested
by IGO drilling and did not warrant further exploration.
Braeside Base Metal Project, East Pilbara, Western Australia
No material exploration results were released for Braeside during the quarter. Subsequent to the quarter Rumble
surrendered E45/4368, the last Braeside tenement.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
No material exploration results were released for Warroo during the quarter. During August, tenement E45/5689
expired and was not renewed.
9
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
CORPORATE
2026 Annual General Meeting
The Company’s 2026 Annual General Meeting will be held in person at 2:00pm AWST on Friday, 27 November
2026 at the Celtic Club, 48 Ord Street, West Perth, Western Australia.
The Notice of Meeting and Explanatory Memorandum will be available from the Company’s website and through
the Company’s ASX market announcements platform. Shareholders who are unable to attend the meeting are
encouraged to complete and return their proxy form.
Office Relocation
During the quarter, Rumble progressed the relocation of its head office from Level 1, 16 Ord Street to Level 1, 52
Kings Park Road, West Perth WA 6005.
Capital Management and Funding
The Company continued to evaluate funding options to support the development of Western Queen and maintain
exploration activity across its portfolio. In the previous quarter, Rumble completed the Western Queen gold royalty
funding transaction with Elemental Royalty, receiving total consideration of A$10 million for the sale of a 2.5% net
smelter return royalty over gold production from Western Queen. The transaction provided non-dilutive capital to
support pre-development activities, including dewatering, feasibility, permitting and mine planning workstreams.
Lamil Project Divestment
In the previous quarter, Rumble and AIC Mines Limited entered into a Tenement Sale Agreement with Aventine
Resources Limited for the sale of their respective interests in Exploration Licence E45/5271, comprising the Lamil
Joint Venture. Under the agreement, Aventine will acquire a 100% legal and beneficial interest in E45/5271 and
associated geological information.
Rumble will receive A$250,000 in cash, Aventine shares to a value of A$300,000 calculated using a deemed issue
price equal to Aventine’s IPO share price, and a 0.5% net smelter return royalty. Completion has not yet occurred
and remains conditional on satisfaction of the outstanding conditions precedent, including heritage assignment
steps and ASX and IPO-related confirmations by Aventine.
Financial Position
As at 30 September 2026, Rumble held approximately $8.30 million in cash.
Appendix 5B – Quarterly Cash Flow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information disclosed
in the Cash Flow Report shows Exploration and Evaluation expenditure during the quarter totalled $1.18 million.
Cash outflows for the September 2026 Quarter totalled $1.892 million, comprising exploration activity (63%), staff
costs (20%) and administration and corporate costs (17%).
Cash inflows for the September 2026 Quarter totalled $108K, government grants and tax incentives (7%) and
interest received (93%).
Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $225,222 for the quarter, comprising $156,255 in Directors’
fees, $13,651 in statutory superannuation, $54,000 in consulting fees to related entities and $1,316 in business-
related expense reimbursements.
Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
10
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
Authorisation
This announcement was approved for release by the Board of the Company.
-ENDS-
For further information please refer to the Company’s website www.rumbleresources.com.au or contact
info@rumbleresources.com.au
Peter Harold
Managing Director & CEO
Peter Venn
Technical Director
Trevor Hart
Chief Financial Officer
About Rumble Resources
Rumble Resources is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold-Tungsten Project which is
being developed to deliver near term cash flow from the existing underground resources and resource growth
through future exploration success.
In addition, the discovery of the Earaheedy Zinc-Lead-Silver Project has demonstrated the capabilities of the
exploration team to find world class orebodies.
Competent Person Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects is
based on and fairly represents information compiled by Mr Peter Venn and Mr Simon Davies, who are Members of
the Australian Institute of Geoscientists. Mr Peter Venn and Mr Simon Davies are full-time employees of Rumble
Resources Limited. Mr Peter Venn and Mr Simon Davies have sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as
Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Peter Venn and Mr Simon Davies consent to the inclusion in the report
of the matters based on this information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and
resources, production levels and rates, costs, prices, future performance or potential growth of Rumble Resources
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Rumble Resources
Ltd. Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or
a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the
requirements of Australian securities laws, which may differ from the requirements of United States and other
country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or
incorporated by reference in this document have been, and will be, prepared in accordance with the JORC
classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geoscientists.
11
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
APPENDIX 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage Interest
Braeside E45/4368 Granted Western Australia 100%
Copper Hills E46/1614 Application Western Australia 100%
Copper Hills E46/1626 Application Western Australia 100%
Copper Hills E46/1660 Application Western Australia
100%
Earaheedy E69/3464 Granted Western Australia 75% Note 1
Earaheedy E69/3787 Granted Western Australia 100%
Earaheedy E69/3815 Granted Western Australia 100%
Earaheedy E69/3862 Granted Western Australia 100%
Earaheedy L69/0058 Application Western Australia 75% Note 1
Earaheedy M69/0150 Application Western Australia 75% Note 1
Irregully E08/3841 Application Western Australia 100%
Lamil E45/5271 Granted Western Australia 50% Note 4
Munarra Gully P51/3481 Application Western Australia 100%
Munarra Gully E51/1677 Granted Western Australia 80% Note 3
Munarra Gully E51/1919 Granted Western Australia 100%
Munarra Gully E51/1927 Granted Western Australia 100%
Northling Copper E69/4434 Application Western Australia 100%
Saltbush E45/6975 Application Western Australia 100%
Talbot E46/1604 Application Western Australia 100%
Thunderbolt E28/3219 Granted Western Australia 100%
Thunderbolt E28/3240 Granted Western Australia 100%
Thunderbolt E28/3384 Granted Western Australia 100%
Thunderbolt E28/3500 Granted Western Australia 100%
Thunderbolt E45/3566 Granted Western Australia 100%
Thunderstorm E28/2528 Granted Western Australia 100% Note 2
Thunderstorm E28/2529 Granted Western Australia 100% Note 2
Thunderstorm E28/2595 Granted Western Australia 100% Note 2
Warroo E45/5366 Granted Western Australia 100%
Western Queen E20/967 Granted Western Australia 100%
Western Queen E59/2816 Granted Western Australia 100%
Western Queen E59/3021 Granted Western Australia 100%
Western Queen E59/3130 Application Western Australia 100%
Western Queen L59/40 Granted Western Australia 100%
Western Queen M59/45 Granted Western Australia 100%
Western Queen M59/208 Granted Western Australia 100%
12
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Copper Hills E46/1660 Application Western Australia 100%
Northling
Copper
E69/4434 Application Western Australia 100%
Western
Queen
E59/3130 Application Western Australia 100%
3. Mining tenements Granted during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Western Queen E59/2816 Granted Western Australia 100%
Western Queen E59/3021 Granted Western Australia 100%
4. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status Location
Beneficial
Percentage
Interest
Earaheedy E69/4062 Withdrawn Western Australia 0%
Earaheedy E69/4092 Withdrawn Western Australia 0%
Warroo E45/5689 Expired Western Australia 0%
RUMBLE JOINT VENTURES - NOTES
1. Earaheedy Project, Western Australia
E69/3464 75% RTR / 25% Zenith Minerals
M69/0150 75% RTR / 25% Zenith Minerals
L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
E28/2528, E28/2529, E28/2595 (the Licences), - RTR 100% - Refer ASX release 7 April 2025 “Rumble
acquires 100% of the Thunderstorm Gold Project” and ASX release 6 February 2026 “Rumble completes
acquisition of highly prospective Thunderstorm Gold Project”. RTR became the registered holder of 100% of
the Licences on 26 February 2026 when transfers for IGO’s 70% portion to RTR were registered.
3. Munarra Gully, Western Australia
E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
E45/5271 - RTR 50% / AIC Mines 50%, RTR and AIC Mines entered into a Tenement Sale Agreement with
Aventine Resources Limited dated 12 May 2026. Aventine is purchasing 100% of E45/5271 subject to several
of conditions precedent that need to be completed.
13
Rumble Resources Limited / ASX:RTR
ABN 74 148 214 260
www.rumbleresources.com.au
Head Office
Level 1, 52 Kings Park Rd
West Perth, WA 6005
Contact Us
T. +61 8 6555 3980
E. info@rumbleresources.com.au
ASX:RTR
APPENDIX 2
Table 1 – Gold Mineral Resource Estimate tabulation for the Western Queen Project by Resource Area, split by
Indicated and Inferred Resources and reported at open pit and underground economic cut-offs.
The Statement of Estimates of Mineral Resources (Gold) has been compiled by Mr Shaun Searle, who is a Director
of Ashmore Advisory and a Member of the AIG. Mr Shaun Searle has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify
as a Competent Person a
Share your feedback
Discover