31 July 2025
June 2025 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a summary of the
Company’s activities during the June 2025 Quarter, focusing on discovery and growing the gold and tungsten
resources and generating cash flow from the Western Queen Project, advancing the emerging world class
Earaheedy Zinc-Lead-Silver Project and progressing the other exploration projects in the portfolio.
Highlights for the Quarter include:
WESTERN QUEEN PROJECT
1. Significant increase to Western Queen Gold Resources
•
The Western Queen Gold Project Mineral Resource Estimate (MRE) has been upgraded to 3.72Mt @
3.1g/t Au for 370,000 oz, representing a 29% increase in global ounces and a 53% increase global
resource head grade 1, at discovery costs of roughly A$25/oz
•
The updated MRE includes an additional 8205m of reverse circulation and 2453m of diamond drilling
over the October 2024 MRE.
•
Strongest resource growth at Western Queen South where the upgrade MRE is now 2.32Mt @ 2.66g/t
Au for 198,900 oz, represents a 59% increase in the overall ounces in the deposit 2.
•
Utilising the updated resource block model an underground mining study is well underway on the
Western Queen South and Central deposits.
•
The Western Queen MRE is within granted Mining Licences and located within a 200km radius of five
gold processing facilities.
•
Mineralisation remains open along strike and at depth on the regionally significant Western Queen Shear
Zone.
•
A diamond drill program is being planned to further grow the resource base and reclassify a significant
portion of the newly defined Inferred Resources to the Indicated category.
2. High-grade gold and tungsten intersected in diamond drilling at Western Queen Project
•
Diamond drilling at Western Queen South has extended gold mineralisation down plunge, best
intersections include:
o
6.93m @ 4.10g/t Au from 362m (WQDD025A)
o
0.3m @ 32.38g/t Au from 300.3m (WQDD026)
1 Refer to Rumble ASX release 23 July 20254 “Significant Increase to Western Queen Gold Resources”
2 Refer Table 1 appendix 2
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
1
o
1m @ 6.20g/t Au from 313m (WQDD026)
o
27.4m @ 1.02g/t Au from 288m (WQDD019)
•
including 2.7m @ 2.96g/t Au from 308m
Drilling has also intersected further high-grade tungsten skarn mineralisation at both Western Queen
South and Princess. Assay intersections include:
o
24.6m @ 0.62% WO3 from 292.5m (WQDD019) including:
0.4m @ 10.53% WO3 from 292.5m
0.9m @ 7.15% WO3 from 297.9m
1.7m @ 0.98% WO3 from 315.4m
o
0.51m @ 1.22% WO3 from 360.27m (WQDD025A)
o
1.49m @ 0.83% WO3 from 367.44m (WQDD025A)
o
1m @ 1.04% WO3 from 383m (WQDD025A)
•
Petrographic studies completed during the Quarter have confirmed tungsten mineralisation at Western
Queen represents an early prograde endoskarn mineralisation event which predates the orogenic gold
mineralisation. The high-grade tungsten mineralisation at Western Queen remains open in all
directions.
•
During the Quarter, the Company completed an extensive review and sampling program of the historical
Western Queen diamond core for tungsten. Final assays have now been received with the Company
working on completing a Maiden tungsten Mineral Resource Estimate, due for release during the
September quarter.
3. Mine Development
•
•
Mining Studies
o
Updated open pit mine plan provided by
o
Underground mining “proof-of-concept” study on Western Queen South deposit positive and
scoping study on mining Western Queen South and Central via underground underway
Permitting
o
•
Third party ore processing
o
•
•
Mining Proposal, Mine Closure Plan, Works Approval and ancillary permits required for the open pit
mine development submitted
Discussions with potential ore purchasing parties ongoing
Co-operation Agreement with Bain Global Resources, MEGA Resources and Rumble
o
The Co-operation Agreement with Bain is now in final form
o
All parties continue to work together to maximise the returns from the project and have extended
the CPs on the execution of the definitive agreements until 30 September 2025
Additional gold royalty
o
Exploring the opportunity to increase the gold royalty for an upfront cash payment
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
2
EARAHEEDY ZN-PB-AG PROJECT
During the Quarter, the Company continued with the work on the internal scoping study on the Earaheedy ZnPb-Ag Project.
This study aims to provide the Company with an order of magnitude estimation of the potential project
economics of the Earaheedy mineral resource at a range of commodity prices. The following consultants have
been engaged to work on the study:
•
•
•
•
•
MACA Interquip Mintrex – providing process plant design and capex/opex estimates
Auralia Mining Consultants – preparing Whittle Optimisations to develop a mine schedule to match the
determined process plant feed throughput rate
SRK Consulting - hydrogeological setting and estimation of groundwater dewatering volumes
MBS Environmental - environmental setting and key environmental factors
Peter O’Bryan and Associates - geotechnical review and pit wall stability
The study is on track to be completed during Q3 of CY2025 and should assist the Company to determine the best
path forward for the Earaheedy Project.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
3
EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals.
Figure 1 – Location of Company’s Projects
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
4
Western Queen Gold – Tungsten Project, Mt Magnet, Western Australia
Figure 2 - Western Queen mining leases location and proximity to existing mills
Western Queen Gold Resources Upgrade
During the Quarter, the Company announced a significant increase in the Mineral Resource Estimate (MRE) at
Western Queen. The revised MRE is 3.72Mt @ 3.1g/t Au for a total of 370,000 oz (see Figure 3) which represents
a 53% increase in average grade and 29% increase in overall gold ounces at the Project. The MRE includes
Indicated and Inferred Resource classifications in accordance with the Australasian Code of Reporting of
Identified Mineral Resources and Ore Reserves (JORC Code 2012), with all the resources located within granted
Mining Leases, M59/208 and M59/45. Refer to Table 1 for breakdown of Indicated and Inferred Resources by
deposit area at Western Queen.
As announced on 30 May 2025 Rumble initiated a “proof of concept” underground mining study 3 given the
increased upfront working capital requirement of the open pit project. The preliminary studies have been
favourable and now a more detailed underground mine plan is being prepared by our consultant. As a result of
this study, Rumble geologists produced updated wireframes for the Western Queen South and Central Resources
that included the most recent reverse circulation (RC) diamond drilling and incorporated stronger geological
controls recorded from logging and surface mapping and then applied a 1.0g/t Au cutoff across the extent of the
mineralisation. This process resulted in a 53% increase in mineral resource head grade to 3.1gt Au compared to
the October 2024 MRE.
3 Refer to Rumble ASX release 30 May 2025 “Western Queen Gold Mine Development
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
5
The updated Western Queen Project MRE includes an additional 8205m of RC and 2453m of diamond drilling
results compared to the October 2024 MRE 4 and was completed between November 2024 and March 2025. This
drilling was focused on targeting new and extending existing high-grade south plunging mineralised positions at
the Western Queen South and Princess deposits. This additional drilling led to a 75% increase in the Inferred
Resources to 2.4Mt @ 2.8g/t Au for 217,800 oz.
Figure 3 - Western Queen Gold Project – longitudinal projection displaying resources, previous mining and
near deposit exploration potential
The updated MRE was prepared by Ashmore Advisory Pty Limited (Ashmore). Ashmore undertook the MRE using
Ordinary Kriging estimation methodology constrained by interpreted domain wireframes and was depleted for
all resources contained inside of existing open pit and underground mining voids prior to reporting. The Western
Queen Resource is reported at a 0.5g/t Au cut-off for open cut resources above the 245mRL level and 1.5g/t Au
cut-off below the 245mRL level for underground resources. The 245mRL level was chosen as it is the base of the
Western Queen Central Open Pit, which has historical reconciled production of 660kt at 8.9g/t Au for 190,000
oz.
The deposits remain open along strike and at depth and the Company believes that additional drilling will further
grow gold resources at Western Queen. The Company is planning further drilling programs to extend high-grade
mineralisation at depth and to convert a significant portion of the new Inferred Resources to the higher
confidence Indicated Resource status. Additionally, significant exploration potential remains along strike to the
north and to the south along the recently reinterpreted position of the Western Queen Shear Zone (WQSZ) –
(refer Figure 4). The Company has submitted a Heritage Survey Request for proposed aircore and RC drilling
across E20/967 with the intention of completing this drilling in late 2025 or early 2026.
4 Refer to Rumble ASX release 15 October 2024 “Western Queen Gold Resources increased 76% to 287koz”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
6
Figure 4 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
The Western Queen Project is located within a 200km radius of five gold processing mills (refer to 2). The closest
mill is the Dalgaranga Mill (48km by road) which has a capacity of 2.5Mtpa. The Checkers Mill has a capacity of
1.9Mtpa and the Tuckabianna Mill has a capacity of 1.2Mtpa.
Western Queen South – Gold Mineralisation
During the Quarter, the Company announced the results of five diamond holes completed at Western Queen
South (WQS) for a total of 2022m 5. Four holes targeted the southerly high-grade plunge, and one hole targeted
the sub-parallel lode beneath the main WQS lode (see Figure 5). Best assay intersections returned include:
•
6.93m @ 4.10g/t Au from 362m (WQDD025A)
•
0.3m @ 32.38g/t Au from 300.3m (WQDD026)
•
1m @ 6.20g/t Au from 313m (WQDD026)
•
27.4m @ 1.02g/t Au from 288m (WQDD019)
o
5
including 2.7m @ 2.96g/t Au from 308m
Refer to Rumble ASX release 4 June 2025 “High-grade gold and tungsten intersected in diamond drilling at Western Queen Project”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
7
Figure 5 - Western Queen South Longitudinal Section – gram x metre contours with selected drill hole intersections.
The WQS mineralised position was intersected in all holes and is characterised by a zone of silicification and
pyrrhotite-pyrite alteration. Holes targeting the WQS southerly plunge were drilled as 60m step outs from known
mineralisation and WQDD031 was completed as a 180m step out to best understand the potential depth
extension of high-grade mineralisation at WQS. High-grade gold mineralisation remains open at depth to the
north of WQDD031.
Princess – Gold Mineralisation
During the Quarter, the Company announced the results of three diamond holes completed at Princess for a total
of 927m. Drilling targeted extensions to the high-grade lode intersected in the Phase 1 RC drilling program 6
beneath the Princess oxide resource. This mineralisation was interpreted to be parallel and in the hangingwall of
the south plunging Western Queen Central (WQC) high-grade lode. Significant assays intercepted include (refer
to Figure 6):
•
10.5m @ 1.41g/t Au from 220.7m (WQDD027)
•
13m @ 1.50g/t Au from 189m (WQDD029)
o
•
including 3m @ 2.90g/t Au from 189m
2m @ 2.28g/t Au from 396m (WQDD028)
All three holes intersected the mineralised position, characterised by a zone of silicification and pyrite-pyrrhotite
alteration. Mineralisation is open down-plunge to the south.
6
Refer to Rumble ASX release 17 February 2025 “High-grade Gold and Tungsten Assays from Phase 1 Drilling”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
8
Figure 6 - Princess gram x metre contours with selected drill hole intersections – Longitudinal Section
Western Queen South and Princess – Tungsten mineralisation
During the Quarter, the Company announced the assays for multiple zones of high-grade scheelite (tungsten)
mineralisation intersected in phase 2 diamond drilling at Western Queen South and Princess 7. Significant assay
intersections include:
•
24.6m @ 0.62% WO3 from 292.5m (WQDD019 - WQS) including:
o
0.4m @ 10.53% WO3 from 292.5m
o
0.9m @ 7.15% WO3 from 297.9m
o
1.7m @ 0.98% WO3 from 315.4m
•
0.51m @ 1.22% WO3 from 360.27m (WQDD025A - WQS) and 1.49m @ 0.83% WO3 from 367.44m
(WQDD025A - WQS)
•
6.7m @ 0.32% WO3 from 190.3m (WQDD027 - Princess)
o
and 0.75m @ 1.03% WO3 from 191.65m
o
and 1m @ 0.68% WO3 from 196m
7 Refer to Rumble ASX release date 4 June 2025 “High-grade gold and tungsten intersected in diamond drilling at Western Queen Project”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
9
Geological investigations and petrographic studies have confirmed tungsten mineralisation at Western Queen
represents an early prograde endoskarn mineralisation event which predates orogenic gold mineralisation.
Tungsten mineralisation at Western Queen remains open in all directions.
The Company has now received the final tungsten assays from an extensive resampling program of the Western
Queen historical diamond core and has subsequently commenced interpretation and mineralisation domain
wireframing for the maiden tungsten Mineral Resource Estimate (MRE), expected to be completed during the
September quarter.
Preliminary metallurgical testwork has indicated a significant revenue stream could be generated from the
tungsten bearing material. This needs to be verified by detailed metallurgical testwork and included in the mine
schedule. A bulk sample of the tungsten bearing (scheelite) material is being prepared for further metallurgical
testing. The aim of this program is to develop a grade versus recovery curve for the scheelite material to be used
to determine the quantum of the tungsten revenue stream and whether it can be generated concurrently with
the mining of the Western Queen South gold deposit.
Potential Mine Development
Mining Studies
•
Western Queen Open Pit Development
MEGA Resources Pty Ltd (MEGA) reviewed the preliminary open pit mine plan they prepared earlier in the year
following the receipt of the geotechnical report on the Western Queen South deposit and made some
modifications to the mine plan.
The changes to the mine plan include adjustments to the pit wall angles which have resulted in an increase in
the strip ratio together with changes to the sequencing of the smaller Duke, Cranes and Princess open pits by
moving them to the tail end of the Western Queen open pit development. These changes resulted in an increase
in the working capital investment required by Bain Global Resources (Bain) to finance the development of the
mine over and above the $35 million ($25 million working capital facility and up to $10 million cost overrun
facility) referred to in the 28 November 2024 Term Sheet 8.
MEGA is undertaking a re-optimisation of the mining plan to maximise the free cashflow and determine the final
upfront working capital for the project required to be provided by Bain under the Primary Facility Agreement.
•
Western Queen South Underground Option
In light of the higher working capital requirement for the open pit project, Rumble initiated a “proof-of-concept”
underground mining study. The outcome of this proof-of-concept study option has been favourable and a
scoping study on mining both Western Queen South and Central from underground has commenced.
Third Party Processing
Discussions continued with the owners of the operating gold processing plants in the vicinity of Western Queen.
These companies were provided with the Updated Open Pit Mining Schedule (May 2025) and have provided
feedback. Once the optimisation work on the open pit is completed and the underground scoping study is
finalised, further discussions will be held with all interested groups.
There are number of gold processing plants in the vicinity of Western Queen that are currently on care and
maintenance and could be refurbished and restarted during 2026. Discussions commenced with the owners of
these plants during the quarter.
8
Refer to Rumble ASX release date 28 November 2024 “Development of Western Queen Project”
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
10
Permitting
During the Quarter MEGA, on behalf of Rumble, submitted the Mining Proposal, Mine Closure Plan, Works
Approval and ancillary permits required for the open pit mine development.
Bain/MEGA Co-operation Agreement
The Co-operation Agreement, which is the overarching agreement covering the mining of the Western Queen
open pit(s), working capital financing and sharing of costs and revenue has been negotiated between the parties.
The agreements that sit under the Co-Operation Agreement, namely the Primary Facility Agreement, the Security
Deed and the Mining Services Agreement (together the “Definitive Agreements”) are at various stages of
drafting. Given the need to complete the re-optimisation the open pit mine plan, complete the underground
scoping study and consider all gold processing plants (including those currently on care and maintenance) in the
vicinity of Western Queen, the was made defer the signing of the Co-operation Agreement pending the outcome
of the various studies and the parties agreed to extend the execution date of the Definitive Agreements, as
detailed in the 28 November 2024 Term Sheet, to the 30 September 2025.
Additional Gold Royalty
The existing gold royalty applicable to the proposed Western Queen open pit(s) is a very modest A$6-20 per
ounce of gold mined. Consequently, there is an opportunity for Rumble to sell an additional gold royalty of 1-2%
Net Smelter Return (NSR) for an upfront payment. This strategy would provide Rumble with working capital
whilst having only a minor impact on the future cashflow from the gold project. A non-binding indicative offer
was received during the quarter from a specialty royalty company. Discussions with that company are continuing.
Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
During the Quarter, the Company continued with the work on the internal scoping study on the Earaheedy ZnPb-Ag Project.
This study aims to provide the Company with an order of magnitude estimation of the potential project
economics of the Earaheedy mineral resource at a range of commodity prices. The following consultants have
been engaged to work on the study:
•
MACA Interquip Mintrex
•
Auralia Mining Consultants
•
SRK Consulting
•
MBS Environmental
•
Peter O’Bryan and Associates
Auralia is progressing with the mining studies on large-scale open pit mines at the Chinook and Tonka-Navajoh
deposits to estimate a Mining Inventory based on the 2023 Resource. This work involves Whittle Optimisations
to develop a mine schedule that will match the Base Case processing plant feed throughput rate of 10Mt per
annum.
MACA Interquip Mintrex is working on the process plant design and capital and operating cost estimates for the
Base Case plant capacity of 10Mt per annum. The design is for a simple, conventional flowsheet (crush, SAG
milling, flotation, filtering) to produce a bulk zinc/lead concentrate for export. The flowsheet design is based on
the metallurgical testwork completed by Rumble in late 2024.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
11
The other consultants have been engaged to provide reports on:
•
Environmental setting and key environmental factors
•
Geotechnical review of potential open pit wall stability
•
Hydrogeological setting and estimation of groundwater dewatering volumes
The study is on track to be completed during Q3 of CY2025 and should assist the Company to determine the best
path forward for the Earaheedy Project.
Other Gold, Base Metal & Lithium Projects, Western Australia
Warda Warra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
No significant exploration activities occurred at Warda Warra during the Quarter.
Munarra Gully Gold-Copper-Silver Project, Western Australia
During the Quarter, the Company completed an orientation soil sampling program over the interpreted northern
extension of the Amaryllis shear zone. Results of this soil sampling program are currently being evaluated. The
Company is planning to extend the orientation survey before determining the next stage of exploration.
Preliminary interpretation indicates that the results of the orientation soil sampling program are consistent with
the pathfinders observed at the Amaryllis prospect and the Company is planning to extend this soil sampling
program to assess the extents of the anomalism.
Braeside Base Metal Project, East Pilbara, Western Australia
During the Quarter, the Company completed rock-chip sampling and re-analysis of select rock-chip samples and
drilling pulps at the Lightning Ridge prospect using a multi-element analytical suite tailored for high grade Silver,
Indium and Gallium detection. This program was designed to provide further understanding of the grade and
grade continuity of samples containing high grade Pb, Ag, Ga and In at the Braeside Project. The Company is
interpreting the results and planning on a follow up field program to understand the regional context of the
results. The Company intends to expand the sampling program along the Lightning Ridge vein system with a focus
on delineating areas of higher Ag grades.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
During the Quarter, the Company completed an orientation soil sampling program over a previously defined midtime airborne EM anomaly. This anomaly is interpreted to represent a buried paleochannel system. Results of
the orientation survey demonstrate that soil sampling is a valid method for detecting low tenor gold and base
metal anomalism coincident with the paleochannel system. Rumble Resources is currently interpreting the data
and determining an appropriate exploration program to test the anomaly.
Lamil Copper-Gold and Base Metal Project, Patterson Province, Western Australia
During the Quarter, the Company took back management of the 50/50 joint venture (JV) with AIC Mines and
conducted a technical review of exploration completed by AIC under the JV. The Company has identified a priority
target and is planning to undertake a ground based electromagnetic survey during the September quarter.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
12
CORPORATE
Cash and Investments
•
As at 30 June 2025, Rumble held $1.9 million in cash.
Appendix 5B – Quarterly Cashflow
•
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information
as disclosed in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $1.4
million.
•
Cash outflows for the June 2025 Quarter totalled $2.27 million across exploration activity (62%), staff
costs (21%), administration and corporate costs (17%).
•
Cash inflows for the June 2025 Quarter totalled $25k consisting of proceeds from interest received.
Appendix 5B – Payments to related parties and their associates
•
Payments to related parties and their associates totalled $193k for the Quarter, consisting of Technical
Management, Executive and Non-Executive Director fees and salaries, geological consulting, and
superannuation payments.
Tenement Holdings
•
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorisation
Authorised for release by the Board of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
LinkedIn: https://www.linkedin.com/company/rumble-resources-ltd
X: https://twitter.com/RumbleResources
About Rumble
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing
the major Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced
drilling has rapidly uncovered an emerging world class scale base metal system, with interpretative geology and drilling
continuing to make new discoveries and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1
regions of Western Australia. While the Company is undertaking metallurgical studies and internal scoping studies on
Earaheedy exploration activities have been focused on Western Queen where an opportunity exists to grow the gold
resources and potentially fast track the project into production.
Rumble’s board and management team has a successful track record in making discoveries and project development.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
13
Competent Persons Statement
The information in this report that relates to Exploration Results at Western Queen and other Rumble Projects is based on
and fairly represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of
Geoscientists. Mr Timmermans is a full-time employee of Rumble Resources Limited, Mr Timmermans has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported resources and exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference appears.
The previous market announcements are available to view on the Company's website or on the ASX website (www.
asx.com.au). The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian
Share your feedback
Discover