Acquisition Increases Further Zn-Pb Discovery Potential
Released
Released
Announcement PDF
24th October 2023
Earaheedy Project
Tenement Acquisition Increases Potential for Further
Zn-Pb Discoveries
•
Rumble Resources Ltd (ASX: RTR) has entered into an agreement to acquire four
exploration tenements in the Earaheedy Basin from Blaze Minerals Ltd (ASX:BLZ)
for 2,291,047 RTR shares (being $250,000 worth of RTR shares).
•
The acquisition substantially enhances the exploration search footprint with the
highly prospective tenure lying over significant inferred portions of the western
continuation of the Navajoh Unconformity, which is considered the main target unit
associated with the Chinook - Tonka - Navajoh Zn-Pb-(Ag) deposits, that lie
between 10-20km southeast of E69/3815.
•
E69/3815 lies only 1.3km along strike from the newly discovered Mato Prospect
where a single RC drill-hole intersected 16m @ 5.09% Zn + Pb including a highergrade zone of 10m @ 7.05% Zn + Pb (EHRC733). Drilling at Mato is ongoing.
•
Limited historic drilling within E69/3815 lies close to the contiguous boundary with
Rumble’s 100% owned E69/3862 tenement. Encouraging lower grade Zn+Pb
mineralisation was intersected within the interpreted Navajoh Unconformity Unit
lithologies by Blaze and previous explorers.
Rumble interim Managing Director, Peter Venn said:
“We believe the addition of these highly prospective tenements along with the extensive
geological knowledge gathered from our discoveries and recent basin wide targeting
evaluations, will lead to further discoveries of a range of Zn Pb Ag Cu mineralisation
styles, including Chinook and Tonka-Navajoh MVT related deposit types that are
hosted within the flat-lying Navajoh Unconformity Unit (NUU).”
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Venn
Interim Managing Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Company Secretary
Figure 1 – Tenement Status Plan over Regional Geology - Earaheedy Project
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to announce that it has
entered in an agreement to acquire four highly prospective tenements in the emerging Earaheedy Basin
Base Metal Province.
Acquisition Consideration
Rumble has entered into an agreement with Blaze Minerals Limited (Blaze, ASX: BLZ) to acquire 100%
title, inclusive of all data in four exploration licences E69/3815, E69/3842, E69/3889 and E52/3879 located
in the Earaheedy Basin (see Figure 1), approximately 120km north of Wiluna, Western Australia. The only
encumbrances relate to pre-existing 1% Net Smelter Return (NSR) royalties over E69/3815, E69/3842, and
E52/3879.
The consideration will be 2,291,047 shares (determined based on $250,000 worth of Rumble shares at a
deemed issue price of the 30-day VWAP up to, but not including, the date of signing the agreement). The
consideration shares will be issued at completion of the acquisition, without Rumble shareholder approval
using Rumble’s existing placement capacity available under ASX Listing Rule 7.1.
The transfer of the tenements is subject to the Company receiving Ministerial consent to the transfer and
the Parties obtaining all necessary third-party approvals, including the assignment and assumption of any
third party agreements (including the abovementioned royalty arrangements).
New Tenure Prospectivity
The acquisition of the four (4) granted exploration licenses (see Figure 1) comprising a total area of 434 km²
adds significantly to Rumble’s Earaheedy Project tenure portfolio, which now incorporates some 1760 km²
(including E69/3464 JV with Zenith) of highly prospective geological terrane that potentially could lead to the
discovery of additional Zn-Pb-Ag (Cu) deposits to compliment the current combined (pit constrained) inferred
mineral resource of 94Mt @ 3.1% Zn + Pb - refer to the Company’s ASX announcement of 19/4/2023.
Figure 2 – Earaheedy Project -Tenements over Inferred Geology with Deposits and Prospects highlighting Recently Acquired E69/3815
2
Within the four new tenements, historic work was mainly confined to E69/3815 (see figures 1, 2 and 3)
where a single RC drill-hole (completed in the 1980’s) returned shallow low-grade Zn – Pb mineralisation
(20m @ 0.52% Zn + Pb from 20m – TRC73). The area was followed up by Blaze Minerals Ltd (ASX:BLZ)
in 2022 on very broad vertical RC drillhole line spacing (500-1500m apart) and with holes on average 500m
apart along the traverses. This drilling led to Blaze intersecting further shallow low order Zn-Pb
mineralisation close to Rumble’s E69/3862 boundary (see figure 3) with results including:
•
•
•
20m @ 0.83% Zn + Pb from 87m BERC8
22m @ 0.77% Zn + Pb from 113m BERC11
7m @ 0.65% Zn + Pb from 26m and 8m @ 0.50% Zn + Pb from 40m BERC6
The eastern portion of E69/3815 lies along strike from the recently discovered Mato Prospect. At Mato, a
single RC drill hole returned 16m @ 5.09% Zn + Pb, including 10m @ 7.05% Zn + Pb (EHRC733) – refer
to the Company’s ASX announcement of 5/10/2023. This intersection has been interpreted to occur
proximal to a potential high grade feeder structure. Additionally, there are six holes with pending assays on
the same drill traverse as, and immediately down-dip of EHRC733, which have all intercepted visible ZnPb sulphide mineralisation. Significantly, historic RC drill-hole BERC11 (completed by Blaze) lies
1900m west of drill-hole EHRC733 with no other drilling completed in between.
The Mato discovery is hosted within the Navajoh Unconformity Unit and the lower order Zn-Pb
mineralisation in the historic RC drill holes completed to the west in E69/3815 are interpreted to occur within
the same host unit.
The acquisition of E69/3815 opens an additional 30km of strike (see figure 2), which potentially could
lead to the definition of further Zn-Pb mineralisation and/or deposits hosted within the laterally extensive
Navajoh Unconformity Unit. This could add significantly to the overall mineral resource inventory, as well
as lead to the discovery of further high grade mineralised MVT feeder structures.
Figure 3 (insert from Figure 2). Historic drill hole locations and significant intercepts within newly acquired E69/3815 & RTR’s 100% E69/3862
3
About the Earaheedy Project
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna in Western Australia,
with access to major highways, power (gas pipeline), rail, ports, airports and experienced mining workforce (see Figure
4). The Project includes tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals Ltd
(ASX: ZNC) 25% Joint Venture (“JV”), E69/3787, E69/3862 and newly added applications E69/4124, E69/4149 and
E69/4165, which are all 100% controlled by Rumble (see Figure 2).
Rumble announced a major discovery on 19th April 2021 and 2 years later to the day on 19th April 2023, announced
a globally significant, pit constrained, maiden inferred Mineral Resource Estimate (MRE) of 94Mt @ 3.1% Zn+Pb and
4.1g/t Ag (at a 2% Zn+Pb cutoff) – refer to ASX release 19th April 2023. This maiden MRE confirmed the Earaheedy
Project as one of the largest global zinc sulphide discoveries in the last decade. The strength of the MRE is supported
by a 41mt of higher-grade resources that could be part of a possible early development scenario, and a much larger
462Mt resource that could potentially be upgraded via beneficiation, providing the project with significant future
flexibility.
The Project has exceptional near-term growth potential, with the deposits open in all direction and less than 35% of
the 45km mineralised Unconformity Unit (host to the current resources) effectively drill tested, whilst none of the thick
underlying geologically fertile formations which could potentially host high-grade MVT deposits having been tested.
The sheer scale, optionality, location and extraordinary growth potential of Earaheedy could see the Project stamp
itself as a world class, multi decade asset and play a key role in the future global renewable energy transition.
Figure 4 - The Earaheedy Zn-Pb-Ag-Cu Project location and existing infrastructure within Western Australia
4
Authorisation
This announcement is authorised for release by Peter Venn, Interim Managing Director of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Previous Drill Results
Drill hole results are ongoing and previous assays have been reported in earlier ASX announcements.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
ASX Release 23/8/2019 – 14 High Priority Targets and New Mineralisation Style
ASX Release 23/1/2020 – Large Scale Zn-Pb-Ag Discoveries at Earaheedy
ASX Release 19/4/2021 – Major Zinc-Lead Discovery at Earaheedy Project, Western Australia
ASX Release 2/6/2021 – Large Scale Zinc-Lead-Silver SEDEX Style System Emerging at Earaheedy
ASX Release 8/7/2021 – Broad Spaced Scout Drilling Has Significantly Increased the Zn-Pb-Ag-Mn footprint at
Earaheedy
ASX Release 23/8/2021 – Earaheedy Zn-Pb-Ag-Mn Project – Exploration Update
ASX Release 13/12/2021 - New Zinc-Lead-Silver Discovery at Earaheedy Project
ASX Release 21/12/2021 – Major Zinc-Lead-Silver-Copper Feeder Fault Intersected
ASX Release 20/1/2022 – Two Key Tenements Granted at Earaheedy Zn-Pb-Ag-Cu Project
ASX Release 31/1/2022 – Shallow High-Grade Zn-Pb Sulphides Intersected at Earaheedy
ASX Release 21/2/2022 – Further High-Grade Zn-Pb Results and Strong Grade Continuity
ASX Release 9/3/2022 – Major Expansion of Zn - Pb Mineralised Footprint at Earaheedy
ASX Release 26/5/2022 - Multiple New High-Grade Zn-Pb Zones defined at Earaheedy
ASX Release 18/7/2022 – Heritage Clearance Confirmed- Sweetwater drilling Commenced
ASX Release 23/08/2022 – Significant Zones of Zn-Pb Sulphides Intersected
ASX Release 30/08/2022 – High grade Zn-Pb drill intercepts at Tonka
ASX Release 29/09/2022 – New 2.2km High Grade Chikamin Feeder Zone extends Chinook
ASX Release 3/11/2022 – High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
ASX Release 17/11/2022 – Exceptional Metallurgical Results at Earaheedy Project
ASX Release 16/02/2023 – Multiple New High-Grade Feeder Targets Defined
ASX Release 14/03/2023 – Chinook Zn-Pb Prospect expands to 8km strike
ASX Release 19/04/2023 – Maiden Resource Confirms Earaheedy's World Class Potential
ASX Release 03/05/2023 – Heritage Clearance Received for Navajoh Southeast Trend
ASX Release 01/06/2023 – High impact drilling commences at the Earaheedy Project
ASX Release 17/07/2023 – Zinc Lead Mineralisation Discovered in Drilling
ASX Release 5/10/2023 – High-Grade Zinc-Lead Intersection at The Mato Prospect
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was
established with the aim of adding significant value to its current mineral exploration assets and will continue to look at mineral acquisition
opportunities in Australia.
Rumble's board and management team has a successful track record in making discoveries and project development.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on and fairly represents information compiled by Mr Brett Keillor,
who is a Member of the Australasian Institute of Mining & Metallurgy. Mr Keillor is a geological consultant for Rumble Resources Limited.
Mr Keillor has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Keillor consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX market
announcements released on the date noted in the body of the text where that reference appears. The previous market announcements
are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcements. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements.
5
The Mineral Resource Estimate for the Earaheedy Project was first announced in accordance with ASX Listing Rule 5.8 in its ASX
announcement dated 19 April 2023. The company confirms that it is not aware of any new information or data that materially affects the
information in the original market announcement, and that all material assumptions and technical parameters underpinning the estimates
in the original market announcement continue to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production
levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth or other trend projections.
Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which
are beyond the control of Rumble Resources Ltd. Actual results and developments may differ materially from those expressed or implied
by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in
accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of
Geoscientists.
Table 1.
Tenement Schedule
Tenement ID
E52/3879
E69/3815
E69/3842
E69/3889
Applied For
1/10/2020
14/8/2020
8/12/2020
20/4/2021
Grant Date
8/11/2021
4/11/2021
5/4/2022
15/7/2022
End Date Blocks
7/11/2026
26
3/11/2026
29
4/4/2027
34
14/7/2027
51
Previous Holder
Hammerhead Exploration
Hammerhead Exploration
Hammerhead Exploration
Hammerhead Exploration
Other
Rumble earning 100%
Rumble earning 100%
Rumble earning 100%
Rumble earning 100%
Table 2.
Historic Drill Hole Location and Assays – E69/3815
Hole ID
BERC1
BERC2
BERC3
BERC4
BERC5
BERC6
and
BERC7
BERC8
BERC9
BERC10
BERC10A
BERC11
BERC12
BERC13A
BERC14
BERC15
BERC16
BERC17
BERC20
BERC21
TRC73
TRC78
SWD14
East
232631
232828
233114
232809
232377
235385
North
7169842
7169601
7168776
7168381
7167853
7167867
Depth
162
168
168
168
168
88
235591
236100
236336
236231
236218
236569
236308
235647
235129
234400
233990
232850
232466
235234
232674
232875
233667
7168200
7168825
7169143
7168209
7168226
7168694
7169122
7169176
7169525
7169496
7169880
7171300
7170840
7168633
7169830
7170330
7168142
78
120
120
71
168
148
156
149
156
146
144
150
150
72
62
113
278
From
To
Width
Pb%
Zn%
Pb + Zn %
26
40
51
87
33
48
68
107
7
8
17
20
0.44
0.19
0.18
0.22
0.21
0.31
0.16
0.61
0.65
0.5
0.34
0.83
Other
NSA
NSA
NSA
NSA
NSA
Failed
Failed
88
113
99
135
11
22
0.27
0.18
0.09
0.59
0.36
0.77
20
40
20
0.37
0.15
0.52
25
47
22
0.08
0.07
0.15
Failed
All drill holes are vertical – Datum GDA94 Z51
6
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.).
•
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Commentary
7
•
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
RGC completed TRC73 and
TRC78 in the 1980’s. Methodology
is not known. Assays reported as
10m composites for RC.
BHP completed a single DD hole
SWD14. Methodology unknown.
o
Not applicable, no core
Criteria
JORC Code explanation
Commentary
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
•
The drilling methodology and
subsequent assay results are
historical and are reported by Blaze
Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
•
Not
applicable,
unknown
•
All drillhole collars surveyed using
handheld GPS – Datum is MGA94
Zone 51.
•
No resource work reported by
Blaze. Wide spaced regional drill
spacing – 1500m by 500m with
some areas 500m by 500m
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
•
The drilling methodology and
subsequent assay results are
historical and are reported by
Blaze Mineral Ltd in their ASX:BLZ
announcement 31 Oct 2022 –
Earaheedy Basin – Exploration
Update
• The results of any audits or reviews of sampling
techniques and data.
•
Not applicable, unknown
8
verification
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
•
The current Earaheedy Project
comprises of E69/3464 (75%
Rumble and 25% Zenith Minerals
– JV), E69/3787 and E69/3862
(100% Rumble) and newly
granted E69/4124. Also Rumble
has in application a further 3
exploration licenses ELA69/4165, ELA69/4149 and
ELA69/4178 (all 100% Rumble)
•
All granted tenements are in a
state of good standing and have
no known impediments to operate
in the area.
•
Rumble has recently entered an
agreement to acquire tenements
that include E69/3815, E69/3842,
E69/3889 and E52/3879 from
Blaze Mineral Limited
(ASX:BLZ).The status of these
tenements as follows:
The tenements are currently held
100% by Hammerhead
Exploration Pty Ltd, a wholly
subsidiary of Blaze Minerals.
Blaze has warranted that all
granted tenements are in a state
of good standing and have no
known impediments to operate in
the area.
Third party agreements exist with
attached 1% Net Smelter Return
(NSR) royalties over E69/3815,
E69/3842, and E52/3879.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
•
Exploration completed by
o
Blaze Minerals – BERC
hole series
o
RGC – TRC hole series
o
BHP – Single diamond
hole SWD series
Geology
• Deposit type, geological setting and style of
mineralisation.
•
The Earaheedy Project Deposit
type is considered to be a MVT
variant. Mineralisation is
predominantly stratiform sediment
unconformity hosted in both
carbonate and clastic flat lying
lithologies.
Drill
hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
•
Table 1 – Tenement Schedule
•
Table 2 – Historical Drill Hole
9
Criteria
JORC Code explanation
Commentary
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths
and
intercept
lengths
•
•
•
Diagrams
Balanced
reporting
•
•
Locations and Assays E69/3815
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
•
Not applicable, methods unknown
•
Drilling is vertical. Mineralisation is
flat. Width of mineralisation is true
width.
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
•
Figure 1- Tenement Status Plan
over Regional Geology Earaheedy Project
•
Figure 2 – Earaheedy Project Tenements over Inferred Geology
with Deposits and Prospects
highlighting Recently Acquired
E69/3815
•
Figure 3 - Insert for Figure 2.
Earaheedy Project – Historic Drill
Hole Location and Assay Plan
with Mato Discovery (E69/3815 &
E69/3862)
•
Figure 4 - The Earaheedy Zn-PbAg-Cu Project location and
existing infrastructure within
Western Australia
•
Table 2 represents Drill Hole
locations and significant assays
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
10
Criteria
JORC Code explanation
Commentary
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•
Further work
•
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Further work subject to detailed data
review and interpretation
•
11
Not applicable unknown at this
stage if other material or data
available.
Share your feedback
Discover