Western Queen Drilling Update
Released
Released
Announcement PDF
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 1
ASX ANNOUNCEMENT
12 March 2026
Western Queen continues to deliver high-grade gold and
tungsten intercepts including 24.81g/t Au over 6.9m
Infill drilling at Western Queen Central and South returns excellent intercepts
• Infill drilling at Western Queen Central continues to provide excellent high-grade intercepts up plunge towards
the old mine workings, including:
o 6.9m @ 24.81 g/t Au from 290.1m
o 8m @ 4.23 g/t Au from 296m
• At Western Queen South, infill drilling intersected further high-grade gold mineralisation including:
o 6m @ 5.60g/t Au from 253m
and 7m @ 2.03g/t Au from 267m
o 7.57m @ 1.50g/t Au from 489m
and 1m @ 10.20g/t Au from 501m
• Drilling has also continued to encounter multiple zones of high grade scheelite mineralisation, including the
following significant intercepts:
o 10m @ 0.41% WO3 from 214m
incl. 1m @ 1.95% WO3 from 214m
o 4m @ 0.37% WO3 from 347m
o 4m @ 0.43% WO3 from 254m
and 1m @ 0.87% WO3 from 275m
o 11m @ 0.16% WO3 from 239m
• Results are expected to inform updates to both the gold and tungsten Mineral Resource Estimates
in 2026
Peter Harold, Managing Director and CEO commented:
“These excellent results further support the potential growth of the Western Queen underground resources and the
conversion of more Inferred resources to Indicated as we move towards releasing a mining inventory.
Importantly, the high-grade intersections at Western Queen Central immediately below the old underground workings
demonstrate there is a lot more high-grade material than first thought.
We are now working towards a Feasibility Study, incorporating material from both Western Queen South and Central
which should result in a much larger mining inventory than the production target outlined in the November 2025 Scoping
Study.”
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to provide an update on the current diamond
drilling program that commenced in October 2025 to grow and upgrade the mineral resources outlined at the Western Queen
Gold and Tungsten Project (“Western Queen” or the “Project”). The program will continue until early April 2026 for a total of
approximately 17,500m of drilling.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 2
Western Queen is located in Western Australia, approximately 40 km northwest of Ramelius’s Dalgaranga Gold Project and
90km northwest of Mt Magnet, and contains reported resources to date totalling 370,000oz Au at 3.1g/t Au1.
Western Queen South – Gold mineralisation
Results for two additional diamond drill holes at Western Queen South have recently been received (see Figure 1).
WQDD054 was the last of the infill holes at Western Queen South drilled in 2025. This hole encountered multiple zones of gold
mineralisation, including:
• 6m @ 5.60g/t Au from 253m, and
• 7m @ 2.03g/t Au from 267m
Deeper drilling at Western Queen South has been conducted this year to follow up on the success of WQDD043 which returned
12.2m @ 5.13 g/t Au from 456m including 2.2m @ 23.70 g/t Au from 466m. Two holes drilled down plunge of WQDD043 have
recently been sent to ALS Laboratories, with results pending.
A further seven infill holes are planned at Western Queen South to further assist in the converting of Inferred resources to
Indicated in the next Mineral Resource Estimate.
Figure 1 - Western Queen South – gram x metre contours with selected drill hole intersections – longitudinal section
1 Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources to 370koz at 3.1g/t Au”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 3
Western Queen Central – Gold mineralisation
Following the spectacular results of 5.8m @ 30.72g/t Au from 314.6m (WQDD052) and 6.3m @ 24.88 g/t Au from 305m (WQDD057)
further drilling results have been received for five holes including a third high-grade intercept:
• 6.9m @ 24.81 g/t Au from 290.1m (WQDD059)
WQDD059 further extends high-grade mineralisation another 20m up plunge towards the historical Western Queen Central
underground workings (see Figure 2).
Hole WQDD058 was drilled another 20m above WQDD059, however it intersected an unmineralised pegmatite dyke in the expected
lode position. On receiving final assays it was revealed that gold mineralisation had been slightly offset by the pegmatite
emplacement:
• 8m @ 4.23 g/t Au from 296m (WQDD058)
Two holes are planned to test further up plunge from these results, closer to the Western Queen Central underground workings.
The high-grade mineralisation at Western Queen Central occurs at the contact between a retrograde tremolite/actinolite skarn and
later quartz veining. Other significant intersections at Western Queen Central included:
• 1m @ 5.58g/t Au from 422m (WQDD056)
• 5m @ 2.33g/t Au from 352m (WQDD060)
• 2m @ 7.12g/t Au from 393m (WQDD061)
Figure 2 – Western Queen Central and Princess gram x metre contours with selected drill hole intersections - longitudinal section
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 4
Western Queen South – Tungsten mineralisation
Whilst the majority of holes were not targeting tungsten, the drilling has once again intersected multiple zones of high-grade
scheelite (CaWO3) mineralisation. Significant assay intersections include:
• 10m @ 0.41% WO3 from 214m (WQDD045)
o incl. 1m @ 1.95% WO3 from 214m
o and 12m @ 0.17% WO3 from 239m
• 11m @ 0.16% WO3 from 239m (WQDD044)
o incl. 5m @ 0.21% WO3 from 244m
o and 2m @ 0.36% WO3 from 255m
• 1m @ 0.49% WO3 from 442m (WQDD043)
• 1m @ 0.49% WO3 from 311m (WQDD051A)
• 4m @ 0.37% WO3 from 347m (WQDD055)
• 4m @ 0.43% WO3 from 254m (WQDD054)
o and 1m @ 0.87% WO3 from 275m
Ongoing geological investigations and petrographic studies have confirmed tungsten mineralisation at Western Queen represents an
early prograde endoskarn mineralisation event which predates orogenic gold mineralisation.
In August 2025, Rumble announced a maiden tungsten Mineral Resource Estimate (Inferred) of 4.31Mt @ 0.31% WO3 for 13.2kt
WO3
2
. The tungsten mineralisation at Western Queen remains open in all directions.
Preliminary metallurgical test work has indicated a significant revenue stream could be generated from the tungsten bearing
material. This is being verified with detailed metallurgical testwork which will be followed by the preparation of a detailed mining
schedule leading into a Feasibility Study.
Metallurgical testing of a bulk sample of the tungsten bearing (scheelite) material by ALS Metallurgy has recently been completed.
The results from this testwork program will be reported during March 2026.
The aim of this program was to develop a grade versus recovery curve for the scheelite material to be used to help determine the
quantum of the tungsten revenue stream and whether it can be generated concurrently with the mining of the Western Queen
South gold mineralisation.
Next Steps for Western Queen
Gold
• Drilling - Continue to drill until early April.
• Metallurgical testwork - Six diamond holes from the current infill program were selected to provide samples for
the metallurgical testwork program to validate the previous high metallurgical recoveries from Western Queen
South. That testwork program is nearing completion.
• Resources update - Report an updated gold Mineral Resource Estimate early in Q1 FY27.
• Feasibility Study – Complete Feasibility Study
Tungsten
• Further drilling - Continue to interpret tungsten assay results as part of the current drill program.
2
ASX release date 11 August 2025 “Maiden Tungsten Resource of 13,200 tonnes of WO3 highlights the exceptional potential of the Western Queen
Project”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 5
• Metallurgical testwork/Scoping Study - Complete the metallurgical testwork on the bulk scheelite sample.
• Resources update - Report an updated tungsten Mineral Resource Estimate during CY 2026.
• Scoping Study - Commence a Scoping Study on mining and processing WO3 material from Western Queen South
which could be mined concurrently with the gold bearing material.
About Western Queen
The Western Queen Gold and Tungsten Project (“Western Queen” or the “Project”) lies 90km NW of Mt Magnet within the Yalgoo
mineral field of Western Australia. The Project comprises of two contiguous mining leases (M59/45 and M59/208) for a total area
of 9.8 km². In addition to the mining leases, it includes L59/40 (Miscellaneous License) which covers a portion of the original haul
road between Western Queen and Dalgaranga.
The Dalgaranga Plant processed the historical ore reserves from the Western Queen Central Deposit. The original haul road is still
open and is the main access into the project. Rumble holds 100% equity in the project. Surrounding Western Queen is the
Wardawarra Project (100% Rumble). The Wardawarra Project consists of a single granted exploration license (E20/967) and two
exploration licence applications (E59/2816 and E59/3012).
Western Queen is strategically located within 200km of five gold processing plants (see Figure 3).
Figure 3 - Location Plan of the Western Queen Gold Project
The two deposits mined at Western Queen had a combined historical production of 880,000t @ 7.6 g/t Au for 215,000oz. The
Western Queen Central Mine produced 660,000t @ 8.9 g/t Au for 189,500oz and the Western Queen South Mine (from two stages)
produced 220,000t @ 3.6 g/t Au for 25,500oz.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 6
Gold
In July 2025, Rumble announced an updated Mineral Resource Estimate (Indicated and Inferred) of 3.72Mt @ 3.1 g/t Au for 370,000
oz3.
Within both the Western Queen Project area and the surrounding Wardawarra Project there is high potential to add significantly
to the current resource. Gold mineralisation is associated with a structural jog zone within a major orogenic shear which trends
north-south along the Wardawarra Greenstone Belt (see Figure 4).
The structural jog cuts across amphibolite (after basalt and dolerite) and ultramafic lithologies. At the Western Queen Central
deposit, a very high-grade gold skarn has developed within the ultramafic rocks, with an average grade of 8.9g/t Au recorded in
historical production.
At the Western Queen South deposit, high-grade gold occurs within potassic altered quartz-sulphide lodes that have developed in
fine to medium grain amphibolite and plunges moderately to the south.
Tungsten
High-grade tungsten (scheelite) mineralisation was first discovered within the Western Queen South Deposit in August 2024, with
drill hole WQDD013 returning 4m @ 4.58% WO3 and 0.72 g/t Au from 174.85m. Twelve months later, Rumble announced a maiden
tungsten Mineral Resource Estimate of 4.31Mt @ 0.31% WO3 for 13.2kt WO3
4
. The tungsten mineralisation occurs within a
prograde skarn stage that lies closely adjacent to the gold mineralisation. Tungsten mineralisation at Western Queen remains open
in all directions.
Figure 4 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
3 ASX release date 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au”
4
ASX release date 11 August 2025 “Maiden Tungsten Resource of 13,200 tonnes of WO3 highlights the exceptional potential of the Western Queen
Project”
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 7
Authorisation
This announcement is authorised for release by the Board of the Company.
-Ends-
For further information visit rumbleresources.com.au or contact info@rumbleresources.com.au
Peter Harold
Managing Director & CEO
Rumble Resources Limited
Peter Venn
Technical Director
Rumble Resources Limited
Trevor Hart
Chief Financial Officer
Rumble Resources Limited
About Rumble
Rumble Resources is an Australian based exploration company, listed on the ASX in July 2011. Rumble was established with
the aim of adding significant value to its selected mineral exploration assets and to search for suitable mineral acquisition
opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold-Tungsten Project which is being
developed to deliver near term cash flow from the existing underground resources and resource growth through future
exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the capabilities of the
exploration team to find world class orebodies.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly represents
information compiled by Mr Simon Davies, who is a Member of the Australian Institute of Geoscientists. Mr Davies is an
employee of Rumble Resources Limited. Mr Davies has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Davies consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s
ASX market announcements released on the date noted in the body of the text where that reference appears. The
previous market announcements are available to view on the Company's website or on the ASX website (www.
asx.com.au). The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and
resources, production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd,
industry growth or other trend projections. Such statements are not a guarantee of future performance and involve
unknown risks and uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual
results and developments may differ materially from those expressed or implied by these forward-looking statements
depending on a variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of
an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless
otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this
document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute
of Mining, and Metallurgy and Australian Institute of Geoscientists.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 8
Table 1 - Drill Hole Location, Survey, and Gold Assay Results
Table 2 - Drill Hole Location, Survey and Tungsten Assay Results
Hole ID E MGA N MGA RL Depth (m) Dip Azi To (m) Width (m) Au (g/t)
WQDD054 512236 6954523 389.18 312.8 -52.88 125.76 253 259 6 5.60
and 267 274 7 2.03
WQDD056 512473 6955356 397 445 -71.62 86.48 422 423 1 5.58
WQDD058 512631 6955594 371 318.9 -58 127.82 296 304 8 4.23
WQDD059 512628 6955596 378 325.5 -61.28 125.8 290.1 297 6.9 24.81
WQDD060 512636 6955583 372 401.1 -63.27 159.88 352 357 5 2.33
WQDD061 512632 6955586 391 430 -62.56 165.37 393 395 2 7.12
WQDD064 512046 6954479 372 516 -60.52 123.25 489 496.57 7.57 1.50
and 501 502 1 10.20
From (m)
Hole ID E MGA N MGA RL Depth (m) Dip Azi To (m) Width (m) WO3 (%)
WQDD043 512127 6954364 390 510 -70.81 116.97 442 443 1 0.49
and 457 462 5 0.11
WQDD044 512270 6954546 390 300 -59.5 129.12 239 250 11 0.16
incl. 244 249 5 0.21
and 255 257 2 0.36
WQDD045 512278 6954544 389.6 270.1 -59.01 123.18 214 224 10 0.41
incl. 214 215 1 1.95
and 239 251 12 0.17
incl. 243 250 7 0.21
WQDD048 512236 6954523 389.18 320.91 -57.98 127.35 268.9 272 3 0.17
and 292 300 8 0.15
incl. 298 300 2 0.26
WQDD049 512049 6954479 389 470 -51.06 109.53 447 448.6 1.6 0.36
WQDD051A 512236 6954524 389.18 380 -69.32 124.15 311 312 1 0.49
WQDD053 512236 6954523 389.18 341 -65.88 119.54 313 318 5 0.22
WQDD054 512236 6954523 389.18 312.8 -52.88 125.76 254 258 4 0.43
and 275 276 1 0.87
WQDD055 512474 6955330 397 420 -66.87 94.17 347 351 4 0.37
WQDD056 512473 6955356 397 445 -71.62 86.48 393 394.5 1.5 0.33
From (m)
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 9
Previous ASX Announcements – Western Queen Gold Project
• 6/8/2019 – Option to Acquire High-Grade Western Queen Gold Project
• 4/11/2019 – Western Queen Gold Project – Multiple Targets to be Drilled
• 22/11/2019 – Drilling Commenced at Western Queen Gold Project
• 17/2/2020 – High Grade Gold Discovery at the Western Queen Project
• 25/2/2020 – Drilling Commenced at the Western Queen Gold Project
• 14/4/2020 – Exploration Update – Three Drill Programs Completed
• 20/5/2020 – Drilling Identifies Multiple High-Grade Gold Shoots
• 9/6/2020 – Major Drill Program to Commence – Western Queen Gold Project
• 24/6/2020 – Major Drill Program Commenced at The Western Queen Gold Project
• 16/7/2020 – 500% Increase in Landholding Extends Western Queen Project
• 31/8/2020 – Option Exercised to Acquire the Western Queen Gold Project
• 10/9/2020 – 100% Acquisition of Western Queen Gold Project Complete
• 4/11/2020 – Discovery High-Grade Gold Shoots and Shear Zone Extension
• 3/2/2021 – High-Grade Gold Shoots at Western Queen South Deposit
• 2/8/2021 – Western Queen Resource Upgrade to 163,000oz
• 29/4/2024 – Drilling to test High-Grade Gold Zones at Western Queen
• 29/5/2024 – Western Queen Drilling Commenced
• 16/7/2024 – Western Queen Drilling Update
• 6/8/2024 – High-Grade Tungsten Discovery at Western Queen
• 2/9/2024 – Tungsten Discovery at Western Queen Confirmed
• 27/09/2024 - Rumble welcomes new Strategic Investor
• 15/10/2024 – Western Queen Gold Resources increased 76% to 287koz
• 20/11/2024 – Commencement of Drilling at Western Queen
• 28/11/2024 – Development of Western Queen Gold Project
• 11/12/2024 – High-Grade Tungsten Assays Highlights Resource Potential at WQ
• 17/2/2025 – High-grade Gold and Tungsten Assays from Phase 1 Drilling
• 28/2/2025 – Development of Western Queen Gold Project.
• 4/2/2025 – High Grade Tungsten from Historical Core
• 16/4/2025 – Western Queen - Mine Development and Exploration Update
• 30/5/2025 – Western Queen Gold Mine Development
• 4/6/2025 – High-grade Gold and Tungsten at Western Queen Project
• 23/7/2025 – Significant Increase to Western Queen Gold Resources.
• 4/8/2025 – High-Grade Tungsten Assays at Western Queen.
• 11/8/2025 – Maiden Tungsten Resource at Western Queen Project
• 01/10/2025 – Western Queen Exploration and Development Update
• 22/10/2025 - Western Queen Drilling and Development Update
• 27/11/2025 - Western Queen South Scoping Study Highlights Robust Underground Mining Project
• 22/12/2025 - Western Queen Drilling & Mine Development Update
• 14/01/2026 - Multiple high-grade gold intercepts at Western Queen including 30.72g/t Au over 5.8 metres
• 12/02/2026 - High-grade gold intercept extends Western Queen South mineralisation to over 500m down plunge
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 10
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases, more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Diamond Core Sampling - Sampled to
visible mineralisation or lithological
boundaries. Otherwise to 1m intervals.
• Diamond core sampling is ½ core or ¼
core when sample is required for
metallurgical test work for NQ2 and ¼
core for HQ3.
• Standards, blanks and duplicates inserted
at a rate of 8%. 4% Standards, 2% Blanks,
2% duplicates. Additional standards,
blanks and duplicates inserted where
required.
• pXRF readings taken with a Vanta M series
device every metre on clean
representative core. 2 beams with 10
second run times each.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc.).
• Diamond Rigs are Sandvik DE880s.
• Collars are drilled with mud rotary to
refusal. HQ3 then NQ2 core is drilled.
• Core is oriented using a downhole AXIS ori
tool.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Diamond core sample collected in trays,
orientated, logged, pXRF, and
photographed on site. Core was cut and
sampled by Rumble staff onsite.
• 100% core recovery was obtained.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
• The total length and percentage of the relevant intersections
logged.
• Diamond core is geologically, structurally
and geotechnically logged with full
orientation and photography. Core
recovery is calculated based on 1m
intervals. Entire diamond core logged
including mineralisation and country rock.
• pXRF data will be used to refine logging of
units, particularly using the Ti/Zr ratio.
• Core photographed post marking up dry
and wet.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
• size of the material being sampled.
• Diamond core was orientated and marked
based on 1 metre or geological
boundaries. The core was cut 30 degrees
off the orientation mark line (retaining in
tray the orientation mark).
• For duplicates (approximately every 20
samples), sample is split at the crushing
stage at ALS Laboratories. At all times, half
or quarter core was retained for future
reference.
Quality of
assay data
and
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
• Sample preparation by crushing, splitting
to 3kg sample if required, and pulverising
of up to 3kg.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 11
Criteria JORC Code explanation Commentary
laboratory
tests
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
• For tungsten (W), assaying methodology
utilised complete digest through lithium
borate fusion with an ICP-MS finish. High
grade samples that could not be
determined by this method underwent a
lithium metaborate - lithium tetraborate
fusion with an XRF finish.
• Certified tungsten standards were: CDN-
W-4 and CDN-W-6.
• In addition, each metre of core was
analysed by Vanta M Series pXRF, with 2
10 second beams.
• Blanks and standards analysed at the
beginning of each usage of pXRF.
• For Gold (Au) assaying was completed by
50g charge Fire Assay with AA finish (total
digest).
• Certified Gold standards were industry
CRMs from OREAS and Geostats which
included low-grade and high-grade along
with blanks.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Verification of significant intersections by
Rumble personnel.
• No twinned holes completed.
• All data and documentation are
electronic, backed up to company
SharePoint or Dropbox.
• Logging using digital software package.
pXRF, survey and other data entered using
excel.
• Complete hole data and assay results sent
to company database administrator to
load into online hosted database.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Diamond drill-hole collars have been
surveyed using handheld GPS. DGPSsurvey
to be completed.
• Rumble has flown a high-resolution DEM
to ascertain topographic control for
collars where the natural surface still
exists.
• Down-hole surveys were completed by
Gyro every 20 to 30 m.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Data spacing is based on surface DGPS
drill hole pick-up including RL, and
historical survey data.
Orientation of
data in
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• Structural orientation of mineralisation is
well known. Most historical drilling is
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 12
Criteria JORC Code explanation Commentary
relation to
geological
structure
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
appropriately angled for this orientation.
• Drilling orientation is not considered to
have introduced a sampling bias.
Sample
security
• The measures taken to ensure sample security. • All samples are managed and transported
by Rumble personnel from mining lease to
laboratory.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• No audits completed.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186
Share your feedback
Discover