Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
30 January 2025
December 2024 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide a
summary of the Company’s activities during the December 2024 Quarter, focusing on
discovery and growing the gold resources at the Western Queen Project, generating cash
flow from the existing gold resources, advancing the emerging world class Earaheedy ZincLead-Silver Project and progressing the other exploration projects in the portfolio.
Highlights for the Quarter include:
Western Queen Project
1. Pathway to near term gold production
•
Rumble entered into an Indicative Non-Binding Term Sheet with Bain Global
Resources (Bain) and MEGA Resources (MEGA) to develop the open pit resources
at Western Queen. Keys terms are:
o Mining Services - MEGA to provide the open pit mining services and pay all
costs up to a maximum of $25 million in development and working capital
(with a further $10 million cost overrun facility available), no investment
required by Rumble
o Sharing of cashflow - Rumble and Bain will share the free cashflow from the
Western Queen open pits after the initial development costs are recovered
o Definitive Agreements - the parties are currently negotiating the commercial
arrangements including a Joint Venture Agreement and Mining Services
Agreement and with the target of signing these agreements by no later than
28 February 2025
o First development - the current plan is to cutback and deepen the existing
Western Queen South open pit (JORC Resource of ~1.42Mt @ 1.59 g/t for
~72.5koz gold) 1 and some of the smaller open pits (i.e. Duke and Princess)
2. Resource Upgrade to 4.42Mt at 2.02g/t for 286,600 oz 1
•
•
•
•
Mineral Resource Estimate (MRE) upgraded to 4.42Mt at 2.02g/t for 286,600 oz an
increase of 76% in the Indicated and Inferred Resources compared to the August
2021 MRE
Indicated Resources have increased by 142%, representing 56% of the total MRE
Historical mining from Western Queen has produced 880,000t at 7.6g/t Au for
215,000 oz Au
Western Queen MRE is contained within granted Mining Licences, M59/208 and
M59/45 and located within a 100km radius of three gold processing facilities
3. Gold-tungsten discovery drilling
•
A major drilling program commenced on M59/208 and M59/45 in November 2024
•
Phase 1 completed late December - 4,736m of RC and 680m of diamond drilling
•
Assays are expected to be received first half of Q1 2025
•
Phase 2 program scheduled to commence mid Q1 2025
•
Mineralisation remains open along strike and at depth along the Western Queen
Shear Zone hosting the mineralisation with potential for additional high-grade
discoveries
4. Tungsten pulp assays
•
Tungsten resource potential confirmed following receipt of remaining 87 holes from
the 2021 Western Queen gold resource drilling with anomalous pXRF tungsten
>500ppm
•
64 of the 87 RC and diamond holes displayed anomalous tungsten and returned
significant intercepts grading greater than 0.1% WO3
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Joint Company Secretary
Trevor Hart
CFO & Joint Company
Secretary
•
•
•
Significant assays from pulp samples include 2:
o 12m @ 0.56% WO3 and 0.46g/t Au from 69m in WQRC032
o 3m @ 0.69% WO3 from 90m and 2m @ 1.55% WO3 from 159m in WQRC101
o 3m @ 0.52% WO3 from 86m in WQRC118
o 2m @ 0.51% WO3 and 0.44g/t Au from 68m in WQRC0282
The significant pulp assays received complement the high-grade assays received in drill-hole WQDD013,
which returned:
o 4m @ 4.58% WO3, 0.72 g/t Au from 174.85m, including
o 2.05m @ 8.71% WO3, 1.38 g/t Au from 176.85m, and
o 0.65m @ 18.35% WO3, 2.97 g/t Au from 176.85m
Tungsten mineralisation has now been intersected over a continuous strike length of 1,300m with
mineralisation open in all directions
5. Tungsten Metallurgy Program
•
500kg of coarse scheelite containing samples were collected at Western Queen from mining waste dumps
and containment bunds
•
A preliminary tungsten metallurgy program will commence in early 2025
Earaheedy Zn-Pb-Ag-Cu Project
•
The metallurgical test work program on the Chinook Deposit was completed with the key findings being3
•
Excellent Metallurgical Results - final recoveries of 79% Zn were achieved into a high-grade, 61%
Zn+Pb, marketable bulk concentrate suitable for the Imperial Smelting Process, using a coarse
primary grind (P80 > 200μm), which should lead to significant energy savings in the plant.
o Innovative HydroFloat™ Technology – coarse gangue rejection tests demonstrated the ability to
reject over 30% of barren material early in processing, which should result in a reduced plant footprint
and operating costs utilising the HydroFloat Technology
o Simplified and Cost-Efficient Flowsheet - testwork confirmed Chinook ore is amenable to semiautogenous milling, with coarse grinds delivering excellent metal recoveries. This work supports a
simplified, low capex/opex processing strategy that adapts to variable feed grades while producing
a high-value bulk concentrate.
An internal scoping study is due to commence during Q1 2025
o
Corporate
Fund Raising
•
$7.1 million raising achieved via a two-tranche placement at 4 cents per share with support from existing
shareholders including Bain Resource Holdings, new institutional and sophisticated investors
Cash Balance
•
Company had $5.6 million in cash at the end of the Quarter
Rumble Resources Limited - ASX: RTR
1. Refer ASX release date 15th October 2024 titled ‘“Western Queen Gold Resources increased 76% to 287koz @ 2.02g/t”
2. Refer ASX release dated 2nd September 2024 titled “Tungsten Discovery at Western Queen Confirmed”
3. Refer ASX release date 28th November 2024 titled “Excellent Metallurgical Results Highlight Earaheedy’s Development Potential”
Page | 2
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals.
Figure 1 – Location of the Company’s Projects
Rumble Resources Limited - ASX: RTR
Page | 3
1.1 Western Queen Gold-Tungsten Project, Mt Magnet, Western Australia
Figure 2 - Western Queen mining licences and proximity to existing mills
Pathway to near term Production – Term Sheet with Bain Global Resources and MEGA Resources
In line with the Company’s stated corporate strategy to generate early cashflow from Western Queen, in October 2024
Rumble entered into an Indicative Non-Binding Term Sheet (Term Sheet) with the Australian entities of the large Indian
mining contractor, BGR Mining & Infra Limited (BGR) to mine the open pit resources at Western Queen. BGR are a
large scale, Indian mine developer and operator with a current order book of +US$10billion (see
https://www.bgrmining.com).
The Term Sheet is between Rumble and BGR’s Australian entities, Bain Global Resources Pty Ltd (Bain) and MEGA
Resources Pty Ltd (MEGA) and contemplates the formation of a joint venture between Rumble and Bain for the
development of the Western Queen Gold Project. The parties propose to undertake development by cutting back and
deepening the existing Western Queen South open pit (JORC Resource of ~1.42Mt @ 1.59 g/t for ~72.5koz gold)
and some of the smaller open pits (ie. Duke and Princess). The joint venture and development proposal remains subject
to executing the required binding definitive agreements, preparation of a detailed mining plan and financial model,
securing an ore tolling/ore sale agreement with a local gold process plant, obtaining all the necessary approvals for
mining and making the Final Investment Decision.
Key terms of the Term Sheet are as follows:
•
Joint Venture – Rumble and Bain propose to enter into a Joint Venture (JV) for the development and operation
of the Western Queen Gold Project (limited to the existing MRE that can be mined by open pit methods) (Project).
The key terms of the JV are proposed to include:
o
The JV will be managed by a co-owned Australian proprietary company (Manager). The Manager will
oversee day-to-day operations, adhering to approved business plans, budgets, and good mining practices.
Rumble Resources Limited - ASX: RTR
Page | 4
o
A JV management committee (comprising equal representation from Rumble and Bain) will be responsible
for the overall decision making, direction and management of the JV. Decisions by the management
committee will be made on a simple majority basis, except for reserved matters requiring a 75% vote.
Reserved matters to include significant financial, operational, and governance decisions.
o
The parties will agree on an initial business plan and budget, including a detailed annual budget for the
first contract year and forecasts for the following two years or until the Project's open pits are depleted.
The formal Joint Venture Agreement will outline an annual process for updating the business plan and
budget, with input from participants and approval by the management committee.
•
Mining Services – MEGA (via a standalone Mining Services Agreement) will provide the open pit mining services
to the JV (at prevailing market rates) and Bain will pay all costs up to a maximum of $25 million for development
and working capital (repayable from any future revenue generated from the Project). Rumble will not be required
to contribute funds below this $25 million threshold. Bain will also provide a Cost Overrun Facility for an additional
$10 million on commercial terms, if required.
•
Sharing of free cashflow – once the initial development costs, working capital and ongoing mining costs outlaid
by Bain has been recouped in full, all remaining free cashflow from the Project will be shared between Bain and
Rumble.
Other terms – other standard terms for an agreement of this nature including representations and warranties,
termination rights, etc.
•
Definitive Agreements – a binding, full-form Joint Venture Agreement and Mining Services Agreement are
currently being negotiated, targeting execution by no later than 28 February 2025.
Western Queen is located within a 100km radius of three gold processing plants (refer to Error! Reference source not
found.2). The closest plant is Dalgaranga (48km by road from Western Queen) which has a capacity of 2.5 Mtpa
(currently on care and maintenance). The Checkers plant (Mt Magnet) has a capacity of 1.9 Mtpa and the Tuckabianna
plant has a capacity of 1.2 Mtpa. These two facilities could provide the possibility for a near-term toll treating option.
Significant Resource Upgrade to 286,000oz gold
During the Quarter, the Company announced a 76% increase to the Company’s Mineral Resource Estimate (MRE) for
Western Queen from that which was previously announced on 2 August 2021. The revised MRE is 4.42Mt @ 2.02 g/t
Au for a total of 286,600 ounces. Refer ASX release dated 15 October 2024 titled “Western Queen Gold Resources
increased 76% to 287koz @ 2.02g/t.” The MRE includes Indicated and Inferred Resource classifications in accordance
with the Australasian Code of Reporting of Identified Mineral Resources and Ore Reserves (JORC Code 2012), with all
the resources located within granted Mining Leases. Indicated Resources are 2.39Mt @ 2.11g/t Au for 163,800 ounces,
which is a 142% increase compared to the August 2021 MRE, and represents 56% of the total MRE. The combined
open cut and underground resource for the Western Queen Project is presented in Table 1.
Table 1: Mineral Resource Estimate Tabulation for the Western Queen Project
Prospect
Cranes
Duke
WQC
Princess
WQS
Total
Tonnage
kt
Indicated
Au
g/t
Au
Ounces
50
590
180
1,560
2,390
4.23
3.11
0.92
1.79
2.11
7,000
59,300
5,200
90,300
161,800
Tonnage
kt
70
70
630
680
580
2,030
Inferred
Au
g/t
1.39
2.70
2.54
1.35
1.86
1.91
Au
Ounces
3,300
5,700
51,700
29,300
34,600
124,700
Tonnage
kt
70
120
1,230
850
2,140
4,420
Total
Au
g/t
1.39
3.37
2.81
1.26
1.81
2.02
Au
Ounces
3,300
12,800
111,000
34,600
124,900
286,600
Diamond drilling completed by the Company in June 2024 provided further geological understanding of the controls on
the mineralised system and prompted a comprehensive geological review of the Western Queen Project. This review
led to a lithostructural reinterpretation that incorporated new zones of mineralisation that were not previously wireframed
as part of the resource modelling exercise in 2021 as well as the extensions provided by the recent drill programs.
The updated Western Queen Project Mineral Resource Statement includes all reverse circulation (RC) and diamond
drilling results from July 2024 and the new wireframes modelled and supplied by Rumble, whilst the MRE was prepared
by Ashmore Advisory Pty Limited (Ashmore). Ashmore undertook the MRE using Ordinary Kriging estimation
methodology constrained by interpreted domain wireframes and was depleted for all resources contained inside of
existing open pit and underground mining voids prior to reporting. The Western Queen Resource is reported at a 0.5g/t
Rumble Resources Limited - ASX: RTR
Page | 5
Au cut-off for open cut resources above the 245mRL level and 1.5g/t Au cut-off below the 245mRL level for underground
resources. The 245mRL level was chosen as it is the base level of the Western Queen Central Open Pit, which has
historical reconciled production of 660kt at 8.9g/t Au for 190,000 ounces.
The deposits remain open at depth and the Company believes there is significant near-term exploration potential at
Western Queen. In particular, the Princess Deposit area, between the Western Queen Central and South Open Pits has
only previously been sparsely drilled below the oxide-transitional zone, 50-80m below surface (refer to Figure 3). A
significant RC and diamond program was designed to test this potential and commenced in November 2024.
Additionally, significant exploration potential also exists along strike to the north and to the south along the recently
reinterpreted position of the Western Queen Shear Zone (WQSZ) – refer Figure 5.
Figure 3 - Western Queen Project – longitudinal section of resources, previous mining and near deposit exploration
potential
Current Western Queen Drilling Program – Phase 1 completed
During the Quarter, the Company commenced drilling to further test the significant potential around the Princess Deposit
and between the Western Queen Central and South Open Pits. Phase 1 of this program was completed in late
December. A total of 4,736m (19 holes) of reverse circulation (RC) and 680m (6 holes) of diamond drilling were
completed on M59/208 and M59/45. Assay results are expected to be received during the first half of Q1 2025, which
will assist in determining the Phase 2 priority holes. It is anticipated that Phase 2 drilling will commence mid Q1 2025.
This drill program is targeting high-grade gold as well as the recently discovered tungsten mineralisation. Results of this
program will inform a future Mineral Resource Estimate (MRE) upgrade and maiden tungsten MRE expected later in
2025.
The initial priority areas for the current drilling program within ML59/45 and ML59/208 are as follows (refer to Figures 4
and 5):
•
The Princess deposit area between Western Queen South (WQS) and Western Queen Central (WQC) open
pit. This area has seen extensive historical small scale shaft mining, while only sparse exploration drilling
has occurred below the upper oxide-transitional zone (50-80m vertical depth).
•
Immediately below the WQS Resource, multiple high-grade lodes exist which are open at depth. Previous
exploration drilling at WQS returned high grade gold intercepts including:
o
o
o
o
4m @ 49.73 g/t Au from 134m (QND-38975-1)
5m @ 38.76 g/t Au from 193m (WQRC188)
17m @ 5.70 g/t Au from 221m (WQRC188)
5m @ 5.02g/t Au from 216m (WQDD013) – potential new parallel lode
Rumble Resources Limited - ASX: RTR
Page | 6
•
Beneath the WQC open pit and underground workings where multiple high-grade lodes exist which remain
open and untested at depth. Previous exploration drilling at WQC returned high-grade gold intercepts
including:
o
o
o
o
•
6.4m @ 36.09 g/t Au from 305.7m (WQD-1072)
6m @ 34.24 g/t Au from 354m (WQRC007D)
5m @ 22.00 g/t Au from 280m (WQRC150)
11.8m @ 16.08 g/t Au from 340.4m (WQD-1089)
Below the Duke Deposit, where mineralisation is open at depth. Previous exploration drilling at Duke returned
intercepts including:
o
o
o
o
8m @ 26.27 g/t Au from 14m (WQRC155)
6m @ 25.87 g/t Au from 48m (WQRC157)
7m @ 60.60 g/t Au from 70m (WQJC-32)
6m @ 37.34 g/t Au from 50m (QNC-10310-1)
•
Over a 2km strike length between the Duke and Cranes deposits only limited shallow RAB and RC drilling has
tested the WQSZ, resulting in a small gold in laterite and oxide Inferred Resource of 3,314oz @ 1.39g/t Au
(refer to Table 1 and Error! Reference source not found.5). The best intercepts at Cranes have returned
14m @ 4.87 g/t Au and 11m @ 1.85 g/t Au from surface.
•
To the northeast of Cranes, the position of the WQSZ has been recently reinterpreted using detailed airborne
magnetics flown by Rumble.
Figure 4 - Western Queen Project – previous mining, previous drilling and near deposit exploration potential
Rumble Resources Limited - ASX: RTR
Page | 7
Figure 5 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
Western Queen Tungsten
Durning the Quarter, the Company confirmed the resource potential of economic tungsten mineralisation at Western
Queen when it received the remaining assay results for the 87 RC and diamond holes from the 2021 Western Queen
gold resource drilling which were anomalous for tungsten on pXRF, however were not previously assayed.
Significant assay intersections received from pulp assays during the quarter, included:
•
•
•
•
•
3m @ 0.52% WO3 from 86m in WQRC118, with a high-grade zone of 1m @ 1.24% WO3 from 86m
2m @ 0.51% WO3 and 0.44g/t Au from 68m in WQRC028
3m @ 0.42% WO3 from 146m and 6m @ 0.24% WO3 and 3.85g/t Au from 259m in WQRC179, with a higher
grade zone of 2m @ 0.40% WO3 and 9.09g/t Au from 259m
4m @ 0.25% WO3 from 85m in WQRC060, with a higher grade zone of 1m @ 0.53% WO3 from 88m
5m @ 0.24% WO3 and 0.21g/t Au from 12m in WQRC078, with a higher grade zone of 3m @ 0.33% WO3 and
0.12g/t Au from 13m.
Rumble Resources Limited - ASX: RTR
Page | 8
Figure 6 – Western Queen Project – Plan highlighting contoured maximum pXRF W in drill holes and location and selected
intercepts of significant WO3 intersections returned to date.
The significant assay intersections received from pulp samples during the quarter complement the previously reported
tungsten mineralisation within drillhole WQDD013 (refer to ASX announcement “High-grade Tungsten Discovery at
Western Queen” 6 August 2024) which returned a spectacular intersection of 4.05m @ 4.58% WO3, 0.72 g/t Au from
174.85m; including 2.05m @ 8.71% WO3, 1.38 g/t Au from 176.85m; including 0.65m @ 18.35% WO3, 2.97 g/t Au
from 176.85m and previously reported pulp assay intersections (refer to ASX announcement “Tungsten Discovery at
Western Queen Confirmed” 2 September 2024) including 12m @ 0.56% WO3 and 0.46g/t Au from 69m in WQRC032,
with a high-grade interval of 2m @ 2.48% WO3 and 0.12g/t Au from 70m and 3m @ 0.69% WO3 from 90m and 2m @
1.55% WO3 from 159m in WQRC101.
Pleasingly, 64 of the original 87 RC and diamond holes drilled by the Company at Western Queen with anomalous
pXRF samples grading greater than 500ppm W have returned significant tungsten intervals grading greater than
0.1% WO3. Tungsten mineralisation has now been intersected over a continuous strike length of 1,300m (refer to Figure
6), with mineralisation open in all directions. The improved spatial data coverage of tungsten assays at Western Queen
has highlighted both the resource potential and zones of higher grade tungsten mineralisation that represent immediate
follow up drill targets
Geological investigations of the tungsten mineralisation at Western Queen are ongoing. The tungsten mineralisation
contains large aggregates of scheelite grains (up to 5mm) occurring parallel to the main foliation trend (refer to Figure
7). The mineralisation is essentially multiple scheelite-pyroxene (tremolite)+/-gold endoskarn zones associated with the
Western Queen Shear Zone (host to gold mineralisation) within dominant Archaean mafic amphibolite lithologies.
Tungsten mineralisation occurs spatially proximal to gold mineralisation, however high-grade tungsten mineralisation
Rumble Resources Limited - ASX: RTR
Page | 9
does not always corelate with high-grade gold mineralisation. The skarn development is interpreted to have been a later
stage to the main gold event at Western Queen.
Figure 7 – WQDD013 (0.65m @ 18.35 WO3) scheelite intersection under UV light
Comparing the significant tungsten intersections returned to date at Western Queen with worldwide tungsten resources
for both operating mines and development projects suggests that Western Queen may contain a significant tungsten
resource. The worldwide resource grades of operating mines average between 0.20%-0.30% WO3, while the significant
intersections returned at Western Queen including 4.05m @ 4.58% WO3, 12m @ 0.56% WO3 including 2m @ 2.48%
WO3, 12m @ 0.34% WO3 including 7m @ 0.49% WO3, and the 1,300m continuous strike of significant tungsten
mineralisation now intercepted that a potential tungsten resource at Western Queen will likely be high-grade compared
to worldwide projects. The Company has access to the extensive historic core library of diamond holes drilled at Western
Queen by previous operators. None of the historic diamond core has been previously pXRF analysed or assessed for
economic tungsten mineralisation. The Company plans to re-log, pXRF analyse and sample anomalous tungsten
intervals observed in historic core in early 2025.
Western Queen Tungsten Metallurgical Program
During the Quarter, Company geologists completed an inspection of the historic mine waste dumps and containment
bunds with an ultraviolet light. A large number of scheelite containing boulders were identified that visually contain
abundant, coarse grained scheelite (refer to Figure 8). Scheelite is extremely resistive to weathering and on that basis,
the Company has collected approximately 500kg of sample material containing coarse scheelite in order to undertake a
preliminary tungsten metallurgy program in early 2025.
Figure 8 – Examples of scheelite bearing samples identified by UV light in containment bunds and on waste rock
dumps at Western Queen. Note: samples shown are not to scale.
About Tungsten⃰
Tungsten is classified as “critical raw material” and is subject to high supply risk and high economic importance. The
supply of tungsten (currently 78,000t annually) is highly dependent on China (produces 81% of the worlds tungsten).
Forecast annual demand growth for tungsten averages 3.5%pa compound however, some recent projections have a
more robust forecast of up to 8%pa compound.
Rumble Resources Limited - ASX: RTR
Page | 10
Tungsten supply from China is forecast to decline due to diminishing reserves and grades making sources outside of
China significantly more valuable. Uses for tungsten include:
• Nano Tungsten Oxide for battery cathode and anode (Li-ion) manufacturing;
• Niobium Tungsten Oxide in batteries to reduce charge time and increase power density;
• Tungsten Hexafluoride gas to optimise all semiconductor production;
• Tungsten wire to essential replace diamond wire for photovoltaic cell silica wafer production;
• Tungsten Oxide coating to enhance hydrogen fuel cell durability;
•
•
Use in thermonuclear energy – excellent heat conductivity and very high melting temperature (includes both
100% tungsten (100-200 tonnes per reactor) and high tungsten steel surrounding the reactors); and
Military applications.
⃰ Sources: Study on the review of the list of critical raw materials, European Commission 2023 Merchant Research and Consulting:
2024 World Market Review and Forecast to 2033.
In Australia, tungsten is currently being produced on a small scale from the Dolphin mine on King Island (in Bass Strait)
by Group 6 Minerals. The Dolphin mine has produced tungsten from scheelite intermittently since 1917 and is
considered Australia’s largest and highest-grade deposit with a current resource of 9.6Mt @ 0.9% WO3. Other
resources in Australia include Mt Carbine (producer, EQ Resources, Queensland) which has intermittently produced
tungsten (wolframite) since the 1890s and currently has a resource of 28.7Mt @ 0.3% WO3.
1.2 Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
Chinook metallurgical test work - E69/3787 (100% RTR) and E69/3464 (75% RTR/ 25% ZNC)
The metallurgical test work on mineralised samples from the Chinook Deposit at the Earaheedy Project was completed
during the December Quarter. The material was obtained from a drilling program that included 10 diamond holes from
the Chinook Deposit (refer to Figure 9), which provided 2,300kg of representative metallurgical core sample.
The Chinook metallurgical testwork program included:
• Pilot beneficiation trials that assessed the potential to upgrade the significant volumes of lower grade Zn-Pb
mineralisation highlighted within the pit constrained MRE;
• Early comminution test work; and
• Further detailed mineralogy and flotation optimisation testing, for future planned scoping level studies.
Figure 9 – Chinook - Metallurgical diamond drill hole Locations
The objectives of the 2024 metallurgical testwork program were to understand and establish the following:
Rumble Resources Limited - ASX: RTR
Page | 11
•
Ore mineralogy and geochemical relationships;
•
Ore hardness and comminution characteristics;
•
Amenability of the base metals to pre-concentration using DMS and HydrofloatTM technologies;
•
Amenability of the base metals to recovery by conventional froth flotation;
•
Optimal grind size analysis; and
•
Concentrate product analysis
The final aim being, the development of the most optimal means for processing the various Chinook lithotypes and
therefore, the establishment of the most viable process flowsheet to best suit the deposit.
Results - Highlights
Full details of the testwork undertaken and the results are contained in the ASX released dated 28 November 2024
titled “Excellent Metallurgical Results Highlight Earaheedy’s Development Potential”. The highlights from the program
include:
• Excellent Metallurgical Results - recoveries of 79% Zn were achieved into a high-grade, 61% Zn+Pb,
marketable bulk concentrate suitable for the Imperial Smelting Process (ISP), using a coarse primary grind (P80
> 200μm), which should lead to significant energy savings in the plant.
• Innovative HydroFloat™ Technology - coarse gangue rejection tests demonstrated the ability to reject over
30% of barren material early in processing utilising the HydroFloat Technology, which should result in a reduced
plant footprint and operating costs, improved tailings design.
• Simplified and Cost-Efficient Flowsheet - testwork confirmed Chinook ore is amenable to semi-autogenous
milling, with coarse grinds delivering excellent metal recoveries. This should support a simplified, low-capex/opex
processing strategy that adapts to variable feed grades while producing a high-value bulk concentrate.
Conceptual Flowsheet(s)
Following the more comprehensive metallurgical testing at Chinook in 2024, including scoping level comminution
studies, two simple and robust flowsheet options were developed, both pursuing the idea of treatment of a high volume
of lower grade feed with simpler technical requirements, refer Figure 10.
•
Option 1 – A conventional flotation flowsheet producing a bulk Zn-Pb concentrate
•
Option 2 – A HydrofloatTM flotation flowsheet producing a bulk Zn-Pb concentrate
Option 1 was previously proposed following the November 2022 sighter studies and consists of a single stage crusher
feeding a SAG (+/- Ball) mill grinding circuit in parallel prior to flotation.
In Option 2 the HydrofloatTM would be installed within the grind section of the plant. Here, the coarser size fraction in
the secondary classification process is fed to the HydrofloatTM. The tailings produced from the HydrofloatTM are final
tailings, allowing the removal of roughly 35% w/w of the total coarse gangue material at coarse fractions (>400μm) in
the early stages of the process.
In both options the remaining flotation circuit will consist of a conventional scheme that includes rougher, scavenger
flotation with the rougher concentrate being reground prior to two stages of cleaner flotation.
Rumble Resources Limited - ASX: RTR
Page | 12
Figure 10 - Proposed Flowsheet Options – Chinook
Rumble Resources Limited - ASX: RTR
Page | 13
Next Steps
•
Complete an internal scoping study to provide an order of magnitude estimation of the potential project
economics of the Earaheedy mineral resource including the examination a range of options and studies that
will assist in delivering an optimised open pit, plant flowsheet and other infrastructure inputs for engineering
design;
•
Complete further geometallurgical studies to improve ore characterisation of the resources and when
combined with spatial modelling, the resulting block model and mine schedule will provide the optimal ore feed
schedule to the process plant;
•
Further optimise metal recovery and concentrate grade to improve the project economics, particularly the lead
and silver in the concentrates using alternate collectors and or conditions;
•
Identify alternate techno-economic opportunities to lower any penalty elements in the bulk concentrate;
•
Carry out a marketing study to review the op
Share your feedback