RIU Conference Presentation
Released
Released
Announcement PDF
Earaheedy – Emerging World Class
Zinc-Lead-Silver Resource in Western Australia
Corporate
December
RIU
ExplorersPresentation|
Conference | 15
February2023
2024
ASX: RTR
Disclaimer
Disclaimer
This presentation has been prepared by Rumble Resources Limited (Rumble or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This
presentation is not to be distributed (nor taken to have been distributed) to any persons in any jurisdictions to whom an offer or solicitation to buy shares in the Company would be unlawful. Any recipient of the presentation should observe any such restrictions on the distribution of this
presentation and warrants to the Company that the receipt of the presentation is not unlawful. It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No
agreement to subscribe for securities in the Company will be entered into on the basis of this presentation or any information, opinions or conclusions expressed in the course of this presentation. This presentation is not a prospectus, product disclosure document or other offering document
under Australian law or under any other law. It has been prepared for information purposes only. This presentation contains general summary information and does not take into account the investment objectives, financial situation and particular needs of any individual investor. It is not
financial product advice and investors should obtain their own independent advice from qualified financial advisors having regarding to their objectives, financial situation and needs. Rumble nor any of their related bodies corporate is licensed to provide financial product advice.
This presentation and information, opinions or conclusions expressed in the course of this presentation contains forecasts and forward looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual
results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Rumble, and of a general nature which may affect the future operating and financial performance of Rumble, and the value of an investment in
Rumble including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, manganese demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
You should not act or refrain from acting in reliance on this presentation, or any information, opinions or conclusions expressed in the course of this presentation. This presentation does not purport to be all inclusive or to contain all information which its recipients may require in order to make
an informed assessment of the prospects of Rumble. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any
investment decision. Recipients of this presentation must undertake their own due diligence and make their own assumptions in respect of the information contained in this presentation and should obtain independent professional advice before may any decision based on the information. No
representation or warranty, express or implied, is made in relation to the fairness, accuracy or completeness of the information, opinions and conclusions expressed in the course of this presentation. To the maximum extent permitted by law, no representation, warranty or undertaking,
express or implied, is made and, to the maximum extent permitted by law, no responsibility or liability is accepted by the Company or any of its officers, employees, agents or consultant or any other person as to the adequacy, accuracy, completeness or reasonableness of the information in
this presentation. To the maximum extent permitted by law, no responsibility for any errors or omissions from this presentation whether arising out of negligence or otherwise is accepted. An investment in the shares of the Company is to be considered highly speculative.
The exploration targets or conceptual exploration targets in this presentation or expressed during the course of this presentation are subject to completion of the necessary feasibility studies, permitting and execution of all necessary infrastructure agreements. This presentation and
information, opinions or conclusions expressed in the course of this presentation should be read in conjunction with Rumble's other periodic and continuous disclosure announcements lodged with the ASX, which are available on the Rumble website. They involve risk and uncertainties that
could cause actual results to differ from estimated results. Forward-looking statements include, but are not limited to, statements concerning the Company’s exploration programme, outlook and target sizes. They include statements preceded by words such as “potential”, “target”,
“scheduled”, “planned”, “estimate”, “possible”, “future”, “prospective” and similar expressions.
Competent Person Statement:
The Exploration Results referenced in this presentation were first announced by the Company in accordance with ASX Listing Rule 5.7 in its announcements dated 14th November 2023, 31st October 2023, 24th October 2023, 5th October 2023, 17th July 2023, 19th April 2023, 14th March 2023
,16th February 2023, 17th November 2022, 3rd November 2022, 29th September 2022, 30th August 202, 23rd August 2022, 18th July 2022, 26 May 2022, 9 March 2022, 21 February 2022, 7 February 2022, 31 January 2022, 21 December 2021, 13 December 2021, 18 November 2021, 10
November 2021, 18 October 2021, 8 July 2021, 2 June 2021, 19 April 2021, 23 February 2021, 17 February 2021, 15 February 2021, 3 February 2021, 28 January 2021, 4 November 2020, 6 October 2020, 20 May 2020, 4 May 2020, 24 April 2020, 17 February 2020, 11 February 2020, 23
January 2020, 26 November 2019, 8 November 2019, 21November 2019, 21 October 2019, 1 October 2019, 23 August 2019, 22 August 2019, 6 August 2019, 11 July 2019, 1 July 2019, 4 April 2019, 12 March 2019, 12 February 2019, 6 February 2019, 17 December 2018, 27 November
2018, 30 August 2018 and 9 August 2018.
The Mineral Resource estimate for the Western Queen Project referenced in this presentation was first announced by the Company in accordance with ASX Listing Rule 5.8 in its announcement dated 2 August 2021. The Mineral Resource estimate for the Earaheedy Project referenced in
this presentation was first announced by the Company in accordance with ASX Listing Rule 5.8 in its announcement dated 19 April 2023.
Rumble is not aware of any new information or data that materially affects the information included in the relevant market announcements described above and, in the case of the Mineral Resource estimate, that all material assumptions and technical parameters underpinning the estimate in
the relevant market announcement continue to apply and have not materially changed.
Reference Source:
Slide 5 – Zincs Role in a low carbon economy -Source: International Zinc Association, A2Mac1, Slide 7 – Forecast Zinc Production and Future Supply Deficit - South 32 Analysis & Wood Mackenzie – 17-1-22 -): https://www.south32.net/docs/default-source/exchange-releases/hermosaproject-update-presentation43ee85d99c0a4238ab2df792d986f3d3.pdf?sfvrsn=24bde72d_4 Slide 30 - Putting Earaheedy Scale in Perspective - 911 Metallurgist - https://www.911metallurgist.com/blog/SEDEX-sedimentary-exhalative-ore-deposits and International Lead and Zinc Study
Group (ILZSG) and South 32 deal of Hermosa: https://www.south32.net/docs/default-source/exchange-releases/south32-to-acquire-arizona-mining-in-agreed-all-cash-offera845e39935e04d52bba69904f73c039a.pdf?sfvrsn=d6597986_4 . Slide 18 – Potential DMS & Ore Sorting benefits –
Pering Mine economic statement 31st December 2010, Sabre Resources ASX announcement 24th January 2012 - https://www.asx.com.au/asxpdf/20120124/pdf/423xbbgrpfxhy4.pdf , Boab Metals Asx announcements 19th November 2021 https://boabmetals.com/wpcontent/uploads/2021/11/20211119-2303039-DFS-Met-Testwork-results.pdf & 25th August 2020 - https://boabmetals.com/wp-content/uploads/2021/02/20200825_Sorby_Hills_PFS_Delivers_Outstanding_Results_final.pdf
2
Earaheedy: Globally Significant Zn/Pb/Ag Resource
Maiden Sulphide, pit constrained, inferred Mineral Resource Estimate (MRE)
94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) for
2.2Mt Zinc, 0.7Mt Lead and 12.6Moz Silver of contained metal
•
•
Large scale, low-cost open pit mining proposition in premier mining jurisdiction
One of the largest zinc sulphide discoveries globally over the last decade
Excellent metallurgical results
•
High recoveries and marketable concentrate grades support a potential simple low capex and opex
plant
Project optionality
•
The pit constrained MRE hosts a 41Mt higher-grade component >3% Zn+Pb cut-off
•
462Mt component > 0.5% Zn+Pb cut-off that could be upgraded through beneficiation
Exceptional resource growth and discovery potential
•
•
•
Deposits remain open with less than 30% of the now 70km Unconformity Unit effectively drill tested
Excellent potential to locate further near-surface high grade areas ie. Mato, Kalitan, Colorado zones
High grade MVT deposit targets in fertile underlying carbonate formations remain untested
3
Global Zinc Uses
Overview
Uses
• Zinc is one of the most versatile and essential materials
• 4th most used metal in the world behind iron, aluminum, and
Galvanising
5% 2%
copper
9%
Die-cast alloy
• Primary use of zinc is in the galvanizing – 60% of demand
• Zinc can be alloyed with other metals ie. with copper to
11%
Brass and castings
make brass, tin to make bronze
• Applications in energy storage - zinc-carbon batteries were
the first commercial dry batteries, providing a higher energy
density at a lower cost than previously available cells
Zn
Oxides and chemicals
13%
Semi-manufacturing
• Essential for future – due to its growing role in energy
storage and its superior ability to protect metals against
corrosion (galvanizing), zinc remains an essential
material for the future
60%
Miscellaneous products
Source: Natural Resources Canada
4
Zinc’s Role in a Low-Carbon Economy
Zinc is a critical mineral for renewal energy storage
Offshore wind turbines
require a zinc coating to
handle extreme
environmental conditions
A 10 MWh
offshore
wind
turbine
required 4
tonnes of
zinc
Source: International Zinc Association, A2Mac1
Zinc
coatings
protect
solar panel
fixtures and
prevent rust
A 100 megawatt hour
(MWh) solar power park
requires 240 tonnes of
zinc
1
Zinc is a key ingredient in
battery technology that enables
carbon emission reduction
2
Zinc-ion batteries are safer than
lithium-ion batteries as they use
water-based chemistry (avoiding
fires)
3
Galvanised steel requires zinc
and is the preferred material
used by EV manufacturers
5
Zinc Uses in Renewables
Accelerated investment and adoption of renewable energy is leading to growing zinc demand
61%
Zinc (Tonnes)
136,000
107%
14,000
162,000
150,000
300
85,000
62,000
66,000
2025*
2030*
24,000
2020
Source: CRU, IRENA
* Projected
Offshore wind
Solar
Storage battery
6
Forecast Zinc Production and Future Supply Deficit
• Zinc inventories at
historic lows
• Supply Deficit - 4 out of
10 major producers
estimated to have less
than 10 years remaining of
mine life
• Supply - Expected to fall
3.5% pa to 2030 due to
depleted mines
• Demand - Significant
production increase
required by 2040
• Underinvestment
globally for discoveries
• New mines are essential
to meet demand
Source: * Wood Mackenzie
* South 32 (17-1-22) - 1.5° (Climate Change Scenario): https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-presentation43ee85d99c0a4238ab2df792d986f3d3.pdf?sfvrsn=24bde72d_4
• 6 x increase in renewable energy capacity to 2050, with wind increasing by 10x and solar by 14x
• Primary Zinc Demand increasing 2x to 24mt
7
Earaheedy – Major Zn/Pb/Ag Sulphide Discovery
• Major sedimentary hosted base metal discovery
in the Earaheedy Basin announced in April 2021
Chinook discovery hole intersected:
o 34m @ 4.22% Zn+Pb from 66m, incl.
15m @ 6.97% Zn+Pb, from 74m
• Maiden JORC compliant Mineral Resource Estimate
delivered 24 months after discovery
• Maiden resource based on 658 holes for 102,000m
of drilling
• Zinc sulphide dominant (up to 10:1 Zn:Pb)
• Represents one of the largest zinc discoveries
globally in past decade
• Located 100km north of Wiluna in Western Australia,
a world class mining jurisdiction with access to
major highways, power, rail, ports and mining
workforce
8
Globally Significant Pit Constrained Maiden Resource
9
Exceptional Resource Growth Potential
• Inferred resources constrained
to closer spaced drilling with
potential to significantly grow
resources with infill and
extension drilling
• Exceptional resource
expansion with deposits open
in all directions
• Mineralisation intersected in
broader spaced drilling outside
of inferred resource areas
highlights the potential for
near term resource growth
• Potential to discover highgrade MVT and fault related
resources beneath existing
resource area in underlying
carbonate formations
10
Chinook: Resource Growth Potential
•
8km x 2km Navajoh
Unconformity Zn-Pb
mineralisation remains open
along strike and down dip
•
Chikamin and Kalitan highgrade feeder enrichment
zones (>5%) Zn-Pb remain
open
•
Potential to discover further
high-grade MVT and fault
related resources within and
outside the inferred
resource area (e.g. 6m @
10.51% Zn+Pb & 8m @
14.61% Zn+Pb)
•
Zinc sulphide dominant
•
Metallurgical (flotation and
beneficiation) diamond
drilling has now commenced
Planned Metallurgical Diamond Holes
for Flotation/Beneficiation test work
11
Chinook Deposit: Optimised Pit
• Optimised pits highlight potential
for a large tonnage, low-cost
open pit mining scenario
• Higher grade zones close to
surface highlight optionality
• Optimised open pits constrained
to depth of drilling
• Significant resource growth
potential with deposit open
along strike and at depth
• Potential to discover high-grade
MVT and fault related
mineralisation within the
current footprint and in
underlying carbonate sequences
Image: NW view of pits >1.5%Zn+Pb COG
12
Tonka and Navajoh: Resource Growth Potential
•
11km x 2km Navajoh Unconformity
Unit hosted Zn-Pb mineralisation
remains open along strike and down
dip
•
Colorado, Magazine and Navajoh
high-grade feeder enrichment zones
(>5%) Zn-Pb remain open
•
Mineralisation intersected in broad
spaced drilling outside of inferred
resource areas highlights the
potential for new resource
discoveries
•
Potential to discover further highgrade MVT and fault related
resources within and outside the
inferred resource area (e.g. 3m @
19.93% Zn+Pb & 5m @ 14.14%
Zn+Pb)
•
Zinc sulphide dominant (up to 10:1
Zn:Pb)
13
Tonka and Navajoh: Resource Growth Potential
14
Flat Lying Ore Zones - Open Pit Potential
•
Shallow and flat lying Zn-Pb
mineralisation hosted in Navajoh
Unconformity Unit Sweetwaters
Well Dolomite - Only formations
tested to date
•
Potential large scale open pit
mine development
•
Potential free dig scenario –
Low-cost waste removal
•
Potential to discover high-grade
MVT and fault related
mineralisation beneath inferred
resource area in underlying
carbonate formations - Untested
15
Metallurgy – Marketable Concentrate
•
•
•
•
•
•
TONKA
PROSPECT
CHINOOK
Composite
A - EHS001/002 B - EDH019
C- EDH027
High zinc recoveries to 90% Zn in
Host
Unconformity Unconformity
Dolomite
cleaner concentrates
Feed Grades
Zn
%
3.92
4.72
1.25
Coarse grind size (150 micron)
Pb
%
2.33
0.49
0.15
Rougher Recoveries
Fast flotation with clean sulphide
Zn
%
86.1
89.6
96.7
separation in site water
Pb
%
63
82.3
82.1
Cleaner Recoveries
Simple and conventional process
%
78.6
84.2
89.6
flowsheet – low capex/opex potential Zn
Pb
%
41
72
70
Zinc concentrate grade to 59% Zn is Cleaner Concentrate Grades
highly marketable
Zn
%
44.5
58.8
49.6
Pb
%
13.7
5.2
4.8
Higher end of global benchmark to
Zn+Pb
%
58.3
64.0
54.4
current developers and producers
•
Average
Tonka
Average
Combined
93.2
82.2
90.8
75.7
86.9
70.8
84.1
60.8
54.2
5.0
59.2
51.0
7.9
58.9
Table: Metallurgical Testwork Summary – incl Rougher Recoveries / Cleaner Recoveries and Concentrate Grades
Considerable potential for further
metallurgical improvements
(optimisation and beneficiation)
Table: Tonka Earaheedy Zinc Recoveries and Zinc Concentrate vs Global Producers
1 New Century Resources Limited – Quarterly Activities Report Dec-21,
2 Wood Mackenzie, August 2018 (N/A – information not available)
3 MMG Limited – Fourth Quarter Production Report 2021
4 – Vedanta Zinc - Wood Mackenzie August 2018 (N/A – information not available)
5 – Teck Resources Limited – Q2 2022 Financial Report
Refer to slide 35 for the details regarding the above peer comparison information.
16
Metallurgy – No Penalty Elements
Company
New Century
Glencore
MMG
Vedanta Zinc
Teck
Rumble
Project
Century
Mcarthur River
Dugald River
Gamsberg
Red Dog
Tonka Earaheedy
5.0
<0.01
4.5
0.4
0.02
80ppm
3.8
31.7
150ppm
6.6
<0.2
1.35
TBD
<0.1
TBD
5
33.7
TBD
% Unless otherwise stated
Fe
Mn
SiO2
Cd
As
Hg
Pb
S
Ag
3
<0.15
5
0.12
<0.01
<50 ppm
8
28.5
150 ppm
5.9
<0.01
4.6
0.12
0.2
40 ppm
4.6
30
130ppm
11
2
3.5
<0.1
0.02
15 ppm
0.2
31
80 ppm
8.9
2.6
2
<0.1
<0.01
22 ppm
0.1
29.4
2 ppm
Table: Tonka Earaheedy Low Penalty Elements vs Global Producers (orange - penalties apply)
Table: Peer Comparison Source Information from slide 35
17
Potential DMS & Ore Sorting benefits
•
Rumble will trial DMS and Ore Sorting in 2024 for the mineralisation outside the higher-grade Zn-Pb zones - benefits include;
o Technique can increase on average ore grade by 2-5 times
o Removes waste early which can significantly lower the plant CAPEX and OPEX
o Flotation recoveries can generally be increased with higher head grade
o Environment – reduce quantity of tailings
o Greater optionality and productivity
Project
DMS & Ore Sorting Examples
1
Pering (Zn-Pb)
South Africa
•
•
•
Resource 50Mt @ 1.1% Zn and 0.3% Pb – MVT Type Open Pit Deposit
DMS delivered 4x upgrade (3.9% Zn and 1.1% Pb)
DMS rejected 80% of waste
2
Sabre’s Border (Zn-Pb)
Namibia
•
•
•
Resource 16.2Mt @ 1.53% Zn and 0.59% Pb – MVT Type Open Pit Deposit
DMS delivered 8 x Upgrade (12.5% Zn and 6.3% Pb)
DMS rejected 83% of waste
3
Sorby Hills (Pb-Ag) Western
Australia
•
•
•
Resource 13.5Mt @ 3.6% Pb and 40g/t Ag (~2.6% ZnEq) MVT Type Open Pit Deposit
DMS delivered 2.5 x Upgrade of lower grade material
DMS rejected 70% of waste
Source:
•
Pering Mine economic statement 31st December 2010,
•
Sabre Resources ASX announcement 24th January 2012 - https://www.asx.com.au/asxpdf/20120124/pdf/423xbbgrpfxhy4.pdf
•
Boab Metals Asx announcements 19th November 2021 https://boabmetals.com/wp-content/uploads/2021/11/20211119-2303039-DFS-Met-Testwork-results.pdf & 25th August 2020 - https://boabmetals.com/wpcontent/uploads/2021/02/20200825_Sorby_Hills_PFS_Delivers_Outstanding_Results_final.pdf
18
Beneficiation – DMS/ Ore Sorting/ Hydrofloat testing
•
Dense media separation (DMS) is one of
several preconcentration methods used in early
waste rejection of ores at coarse particle sizes,
before additional milling and flotation.
•
Initially used in the diamond, coal and iron ore
industries, it has proven very successful in
separating and upgrading other minerals such
as Zinc-Lead ( sphalerite-galena) ores, Copper,
Nickel, Gold sulphides ores and more recently
Lithium based ores
•
•
Some development and production examples:
Prairie Creek Pb-Zn-Ag Project – NorZinc - NW
Territories – Canada
•
Pine Point Pb-Zn Project – Osisko Metals - NW
Territories – Canada
•
Kamfundwa Cu-Co Mine – Gecamines `- Kambove
DRC
•
Kroondal Pt Mine– Aquarius Platinum - South Africa
•
Navachab Au Mine – QKR - Namibia
•
Tati Nickel Mine – Norilsk Nickel - Botswana
19
Exploration Success – Mato Discovery
New Mato Discovery – 10km west of Chinook has the
hallmarks of a large mineralising system which
potentially could further enhance the potential
economics and development of Earaheedy into a world
class base metal camp.
• 16m @ 5.09% Zn + Pb from 153m (EHRC733) including
10m @ 7.05% Zn + Pb from 157m
• 29m @ 3.12 % Zn + Pb from 174m (EHRC734) including
14m @ 5.04% Zn + Pb from 183m and 4m @ 10.16%
Zn + Pb from 184m
• Zn-Pb sulphide mineralisation has near identical
geological controls to the Chinook, Tonka and
Navajoh Deposits
• High prospectivity within defined 9km x 3km area to
host high grade Zn-Pb sulphide mineralisation
• Exceptional up dip and strike potential where
multiple feeder faults have been interpreted
• MVT and structurally hosted high-grade underground
deposits in underlying geological formations – remain
untested
20
Exploration Success – Mato Discovery
21
Mato Resource Potential
22
Earaheedy – Targeted increases in Regional holdings
23
Rumble’s other Western Australian Projects
24
Sustainability
• Diversity in the workforce
• Utilising the local community stakeholders and
suppliers to create a positive contribution to the
region
• Recognise and engagement with traditional
owners
• Growing employment opportunities
• Incorporate best practice environmental principles
• Sponsor Murlpirrmarra Connection a not-for-profit
organisation that provide Aboriginal youth in
Wiluna support throughout secondary school
25
Corporate Overview
Capital Structure (RTR:ASX)
Shares On Issue
Board of Directors
(m)
700.6
Unlisted Options
(m)
12
Market Capitalisation4
(A$m)
~48
Cash and Equivalents
(31 December 2023)3
(A$m)
3.7
Debt
(A$m)
Nil
Enterprise Value
(A$m)
~44
1,2
Notes:
1. 5.5 million 58c Options (Various Expiry)
2. 5.0 million Performance Options Vesting $1 & $2 (unvested), 1.5 million Options @ 20c
3. As at 31 December 2023
4. As at 15 February 2024
Research Analyst Coverage
Sam Catalano
Management
Peter Harold
Managing Director & CEO
Brett Keillor
Technical Consultant
Peter Venn
Technical Director
Ben Jones
Chief Geologist
Geoff Jones
Non-Executive Director
Luke Timmermans
Project Manager, Earaheedy
Michael Smith
Non-Executive Director
Trevor Hart
Chief Financial Officer
& Joint Company Secretary
Matthew Banks
Non-Executive Director
Shareholders
Board and Management
Top 20
10%
29%
26
Catalysts for re-rate of Rumble in 2024
1.
Drill Programs at Earaheedy
Advance the recently delineated Mato Discovery
Target high-grade feeder zones at Chinook, Tonka and
Navajoh to upgrade and expand the maiden resources
2.
Flotation Testwork
Optimisatise recoveries and testing ore beneficiation
3.
Scoping studies
4.
Monetise non-core asset(s)
5.
Commodity prices bounce of lows
6.
Small cap resources feel the “love
Photo: Head of Technical Brett Keillor and Chief Geologist
Ben Jones studying Zn-Pb mineralisation
27
Simple message
1. We have a lot of zinc
2. Zinc fundamentals look great
3. Small cap resources are cheap
3. Buy Rumble
Lion Selection Clock – December 2023
28
Contacts
Peter Harold
Managing Director & CEO
info@rumbleresources.com.au
+61 8 6555 3980
www.rumbleresources.com.au
Level 1, 16 Ord Street,
West Perth, WA 6005
https://www.linkedin.com/company/
rumble-resources-ltd
https://twitter.com/RumbleResources
29
Analogy: Pering Open Pit Mine, South Africa
•
Pering Zinc-Lead discovery made in 1978 by BHP Billiton
•
70km Southwest of Vryburg, Northwest region of South Africa
•
Mined by a joint venture comprising Shell & BHP Billiton
•
20.5Mt mined at 2.6% Zn & 0.6% Pb over 17 years
•
1.2Mtpa mined from two open pits to 120m
•
Zn prices averaged US$0.60/lb between 1988 – 2005, in
2022 US$1.40/lb
Pering Zn-Pb Open Pit Mine, South Africa
Recent DMS processing enhancements at Pering
•
Successful preconcentration DMS studies were completed on
current reserves (51.3Mt @ 1.1%Zn 0.3%Pb) in 2010 by
Mintek, South Africa for PBM Pty Ltd
•
DMS PEA Study produced:
3-4 times increase to 4.2% Zn and 1.0% Pb
80% rejection of waste
Source: Pering Mine economic statement 31st December 2010
30
Share your feedback
Discover