Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
30 April 2024
March 2024 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide an
update with respect to the Company’s activities during the March 2024 quarter, focusing on
advancing the emerging world class Earaheedy Zinc-Lead-Silver Project. Highlights include:
Rumble Resources Ltd
Earaheedy Zn-Pb-Ag-Cu Project, Western Australia
Level 1, 16 Ord Street,
West Perth, WA 6005
Mato Prospect RC Drilling (100% RTR)
T +61 8 6555 3980
• Further significant high-grade Zn-Pb sulphide mineralisation intersected in RC drilling
up-dip and along strike of the exciting new Mato Prospect discovery at Earaheedy.
• The latest drilling highlights a potential 3km x 3km area of high grade Zn-Pb
mineralisation at Mato, which is highly prospective and likely to lead to additional
resource expansion at the Earaheedy Project. Latest significant intersections include:
o 12m @ 6.07% Zn + Pb from 146m (EHRC776)
Including 8m @ 8.71% Zn + Pb from 148m
o
o
19m @ 4.23% Zn + Pb from 119m (EHRC778)
Including 12m @ 5.28% Zn + Pb from 119m
13m @ 3.31% Zn + Pb from 145m (EHRC783)
Including 6m @ 6.95% Zn + Pb from 145m
Western Queen – Au Project, Mt Magnet, Western Australian
•
•
•
The last reported drill program at Western Queen South intersected multiple,
high-grade intervals in drill hole WQRC188 including:
o
5m @ 38.76 g/t Au from 193m,
o
3m @ 5.68 g/t Au from 210m; and
o
17m @ 5.70 g/t Au from 221m.
The Western Queen gold deposits are associated with a major orogenic shear
zone similar to Spartan Resources Never Never Lode below the Gibley’s open
cut (40 km south of Western Queen).
Drilling planned to test down dip/plunge of a series of open, high-grade gold
lodes at the Western Queen Gold Project
•
Wardawarra – Li-Cs-Ta, Ni-Cu-Co Project, Mt Magnet, Western
Australian
•
A field reconnaissance and rock-chip sampling program was completed during the
Quarter to assist in understanding the lithium fertility of the Wardawarra Project.
•
This exploration work has confirmed a significantly large and highly fractionated
lithium-caesium-tantalum (LCT) fertile system exists at Wardawarra.
•
Pegmatites contain significant zonation fractionation and are greater than 15m
thick in outcrop with surface exposures of several hundreds of metres across strike,
suggesting that the pegmatites may have substantial true thicknesses.
•
Rock-chip sampling at the Lithium Creek Prospect returned assays of up to 3.62%
Li2O and 433ppm Ta2O5.
•
Rock-chip sampling at the Dunn’s Prospect returned high-grade assays including
4.95% Li2O, 4.91% Li2O, 4.84% Li2O and 4.72% Li2O.
•
A detailed mapping and geochemical sampling program has been planned to
vector the best fertility zones within the Western and Eastern Pegmatite prospect
areas, to assist with immediate drill hole targeting.
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Joint Company Secretary
Trevor Hart
Joint Company Secretary
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
1.1 Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna, Western Australia. The
Project includes granted tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals Ltd
(ASX: ZNC) 25% Joint Venture (“JV”) and E69/3787, E69/3862, E69/4124 and ELA69/4149 which are 100% owned
by Rumble (see Figure 1).
In addition to the above tenements, Rumble has now acquired (100% RTR) four granted exploration licences that lie
north and northwest of the existing tenure (refer to ASX release 24th October 2023). These tenements comprise of
E69/3815, E69/3842, E69/3889 and E52/3879.
Figure 1 - Earaheedy Project – Location of Chinook, Tonka-Navajoh Deposits, and Mato Prospect over interpretative solid
geology.
Rumble Resources Limited - ASX: RTR
Page | 2
Mato Prospect RC drilling – E69/3787 and E69/3862 (100% RTR)
During the Quarter, the Company released the assays for broad spaced extensional RC drilling at the Mato Prospect,
within 100% RTR tenements – E69/3787 and E69/3862. The drilling has confirmed further significant high-grade ZnPb sulphide mineralisation has been intersected in RC drilling up-dip and along strike at the Mato Prospect discovery.
The latest drilling at Mato highlights a potential 3km x 3km area of high-grade Zn-Pb mineralisation (see Figures 2 &
3), which is highly prospective and likely to lead to additional mineral resource expansion. Drill hole assays returned
include best intercepts of 12m @ 6.07% Zn + Pb from 146m in EHRC776, with a higher-grade zone of 8m @ 8.71%
Zn + Pb from 148m, 19m @ 4.23% Zn + Pb from 119m in EHRC778, with a higher-grade zone of 12m @ 5.28% Zn
+ Pb from 119m and 13m @ 3.31% Zn + Pb from 145m in EHRC783, with a higher-grade zone of 6m @ 6.95% Zn +
Pb from 145m.
The assay results received during the Quarter highlight that the Mato discovery has the hallmarks of a large
mineralising system and provides further support to Earaheedy developing into a world class base metal camp.
Heritage clearance has been granted that will allow future extensional drilling throughout the outlined 3km x 3km Mato
target area. Geological interpretation is ongoing to maximise upcoming drilling campaigns, which will be focused on
intersecting the higher-grade mineralising trends within the Mato system.
Figure 2 - Mato Prospect discovery area and location of Section 1 – RC drill hole locations and assay results.
Rumble Resources Limited - ASX: RTR
Page | 3
Figure 3 - Mato Prospect – Section 1 – Drill hole assays results and interpreted geology and structure. Note: see Figure 2 for section 1 location
Rumble Resources Limited - ASX: RTR
Page | 4
Chinook metallurgical test work- E69/3787 (100% RTR) and E69/3464 (75% RTR/ 25% ZNC)
During the quarter, the Company commenced metallurgical test work on material from the Chinook Deposit at the
Earaheedy Project. The material was obtained from a drilling program that included 10 diamond holes from the Chinook
Deposit (see Figure 4), which provided 2,300kg of representative metallurgical core sample.
Results from the metallurgical test work program are expected late in the June quarter. The program includes:
• pilot beneficiation trials (including dense media separation [DMS] and sensor ore sorting) that will assess the
potential to upgrade the significant volumes of lower grade Zn-Pb mineralisation highlighted within the pit
constrained MRE;
• early comminution test work; and
• further detailed mineralogy and flotation optimisation testing, for future planned scoping level studies.
Figure 4 - Chinook - Metallurgical diamond Drill Hole Locations
Rumble Resources Limited - ASX: RTR
Page | 5
Next Steps at the Earaheedy Project
•
Metallurgical studies
o
•
Discovery and Resource drilling
o
•
Variability and composite samples provided by diamond drilling have now been collected to confirm the
simple and conventional flowsheet, and further improve the flotation performance. Additionally, value
adding beneficiation work has now commenced on the representative core from across the Chinook
Deposit. Sighter comminution results will also be reported.
RC drilling aimed at defining the limits of the emerging world class Zn-Pb-Ag base metal system within
the Navajoh Unconformity Unit, with a focus on discovering new high-grade zones (cf. Kalitan, Chikamin,
Colorado and Magazine Feeder Faults) within the currently outlined mineralised footprints in E69/3464,
and along the 12km Sweetwater Trend (i.e. Mato Prospect) that occur within the 100% RTR E69/3787
and E69/3862 tenements.
Scoping studies
o
Work will commence on initial supporting scoping studies for the Earaheedy Project following flotation
optimisation and beneficiation testing, which will review some of the possible future development
scenarios/options.
Rumble Resources Limited - ASX: RTR
Page | 6
1.2 Other Projects, Western Australia
Western Queen – Au Project, Mt Magnet, Western Australian
During the Quarter, the Company completed a review of the Western Queen Gold Project assessing opportunities to
expand the mineral resources and potentially emulate the success of Spartan Resources’ Never Never lode discovery,
located only 40km south of Western Queen. The last reported drilling at Western Queen was in early 2021, when the
price of gold was roughly A$2700/oz, and intersected multiple, high-grade gold intervals in drill hole WQRC188
including 5m @ 38.76 g/t Au from 193m, 3m @ 5.68 g/t Au from 210m; and 17m @ 5.70 g/t Au from 221m (see
Figure 5). The Western Queen gold mineralisation is completely open along-strike and down-plunge of the existing
mineral resource .
Figure 5. Western Queen South Deposit - WQRC188 Composite Section – Drill Hole Results and Proposed Drilling
Rumble Resources Limited - ASX: RTR
Page | 7
During the June quarter, the Company plans to initially complete a 3-hole diamond drilling programme targeting the
down dip/plunge of the open, high-grade gold lodes at Western Queen South (see Figure 5). Initially the Company will
focus on the high-grade south plunging “core” zone of the Western Queen South deposit, which has previously been
drilled to a maximum vertical depth of only 250m.
The planning of the proposed drill programme at the Western Queen Gold Project has referenced Spartan Resources
highly successful drilling programmes at their Never Never deposit that led to the discovery and maiden resource
estimate. Spartan’s work and interpretations have highlighted the potential for down-plunge continuity of the highgrade zones currently delineated at the Western Queen Central and Western Queen South gold deposits. The Never
Never Lode is part of the Dalgaranga Gold Project and is located 40km south of the Western Queen Gold Project and
lies within the Archaean Dalgaranga Greenstone belt which is contiguous with the Archaean Wardawarra Greenstone
belt (host to the Western Queen Gold Project). The resource defined by Spartan for Never Never currently stands at
952,900oz @ 5.74 g/t Au (December 2023).
Figure 6 – Western Queen South Deposit – Never Never Lode Gram Metre Comparison
The comparison between the Western Queen South deposit and the Never Never Lode (same scale) has been
presented in Figure 6. With Figure 6, the same grams x metre contouring has been applied to both deposits which
emphasises the down-plunge potential for the Western Queen South Deposit.
Gold mineralisation at the Western Queen Gold Project has already been defined over approximately 2.7km and is
associated with a large-scale structural flexure (jog feature) within the regionally extensive auriferous Western Queen
Shear Zone (WQSZ).
Whilst the Western Queen mineral resource currently stands at 2.1Mt @ 2.42 g/t Au for 163,200oz, the historic open
pit and underground production from the Western Queen Central and Western Queen South deposits was 880,000t
@ 7.6g/t Au for 215,000 oz gold.
Rumble Resources Limited - ASX: RTR
Page | 8
Figure 7 – Western Queen Gold Deposit Longitudinal Section – Highlighting Previous Production, Resources and Potential
New Resource Areas
Review of Rumble’s’ previous exploration work highlights strong continuity down-plunge from both the Western Queen
Central and Western Queen South deposits. High-grade gold zones have developed as moderate south plunging
systems within the main WQSZ. Figure 7 highlights the multiple sets of south plunging zones in longitudinal section
with the Duke and Baron prospects open at surface and unmined. Of significance is the poorly tested zone between
the Western Queen Central and Western Queen South deposits along with the down-plunge positions that remain
completely untested.
Wardawarra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
During the Quarter, the Company completed a field reconnaissance and rock-chip sampling program to assist in
understanding the lithium fertility of the Wardawarra Project (see Figure 8). Exploration has confirmed a significantly
large and highly fractionated lithium-caesium-tantalum (LCT) fertile system exists at the Project which warrants an
expanded exploration program. The initial exploration program will include detailed geological mapping and surface
geochemical sampling of the Western Pegmatite Zone, including the Lithium Creek Prospect and over the Eastern
Pegmatite Swarm, including the Dunn’s Prospect.
Rumble Resources Limited - ASX: RTR
Page | 9
Figure 8 - Wardawarra Project surrounds Western Queen Gold mining licences – Tenement Location Plan
At the Western Pegmatite Zone exploration has highlighted a prospective 6km long trend (see Figure 9) containing
multiple, large pegmatites along the granite – ultramafic contact. Pegmatites trend towards the northwest and are
greater than 15m thick in outcrop with surface exposures of several hundreds of metres across strike, suggesting that
the pegmatites may have substantial true thicknesses. Multiple pegmatites appear to have undergone significant
zonation fractionation and many have fractionated quartz cores. Rock chip sampling has returned high-grade assays
of up to 3.62% Li2O and 433ppm Ta2O5.
At the Eastern Pegmatite Swarm and Dunn’s Prospect Exploration (see Figure 9) has confirmed that a 12km long
swarm of pegmatite dykes are lithium-cesium-tantalum (LCT) fertile with a 3km zone of high fertility (ie. K/Rb ratios
less than 20). Dunns Prospect is located in the southern portion of the zone of highest fertility. Rock chip sampling at
Dunns has returned high-grade assays including 4.95% Li2O, 4.91% Li2O, 4.84% Li2O and 4.72% Li2O.
Additionally, the Fence Prospect and the LCT fertile pegmatite field was previously held by Pancontinental Mining
Limited, who in 1983 ranked it in their top 5 lithium– tantalum prospects with a portfolio of projects that included
Pilgangoora, Wodgina, Tabba Tabba and Yinnetharra. Historic shallow alluvial mining has occurred for
tantalite/columbite, with lithium potential untested by drilling.
Rumble Resources Limited - ASX: RTR
Page | 10
Figure 9 - Wardawarra Project Lithium focused exploration overview.
Braeside Base Metal Project, East Pilbara, Western Australia
During the Quarter, the Company received the final assay results for the eleven hole slimline RC and three hole
diamond drill programme completed at the Braeside Project in Q4 2023.The programme was designed to target high
grade Pb Zn Ag Au mineralisation below coherent soil anomalies and gossans at the Barkers Well Prospect where
high grade shoots within pipe-like bodies have been delineated by earlier drilling campaigns. Geological interpretation
of the results in context with the previous drilling at Braeside is ongoing, and the Company plans to announce these
results during the June quarter.
Rumble Resources Limited - ASX: RTR
Page | 11
Lamil Gold-Copper JV Project, Paterson Province, Western Australia
No significant exploration activities occurred during the Quarter.
Warroo Base Metal Project, East Pilbara, Western Australia
No significant exploration activities occurred during the Quarter.
Fraser Range Gold Project, Fraser Range, Western Australia
No significant exploration activities occurred during the Quarter.
Rumble Resources Limited - ASX: RTR
Page | 12
2. CORPORATE
2.1 Appointment of highly experienced mining executive as Managing Director and CEO
On the 12 February 2024 the Company announced Peter Harold has commenced as Managing Director and Chief
Executive Officer (MD and CEO). Peter will oversee Rumble’s next critical growth phase as it continues to expand and
enhance the emerging Tier 1 Earaheedy Zn-Pb-Ag Project and the Company’s other highly prospective exploration
projects in Western Australia.
On the 13 March 2024, the Company issued 2,291,047 Rumble ordinary shares as consideration for the completion
of the acquisition of Exploration Licences s E69/3815, E69/3842, E69/3889 and E52/3879, as announced on the 24
October 2024.
2.2 Cash and Investments
As at 31 March 2024, Rumble held $1.2 million in cash, with and $220k in ASX: AIC listed shares.
2.3 Appendix 5B – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling A$1.6 million.
Cash outflows for the March 2024 Quarter totalled $2.5 million across exploration activity (65%), staff costs (26%),
administration and corporate costs (9%).
Cash inflows for the March 2024 Quarter totalled $24k consisting of proceeds from interest received (100%).
2.4 Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $163k for the Quarter, consisting of Technical Management,
Executive and Non-Executive Director fees and salaries, geological consulting, and superannuation payments.
Rumble Resources Limited - ASX: RTR
Page | 13
2.5 Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Peter Harold, Managing Director and CEO of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing the major
Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced drilling has rapidly
uncovered an emerging world class scale base metal system, with interpretative geology and drilling continuing to make new discoveries
and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1 regions of
Western Australia.
Rumble’s board and management team has a successful track record in making discoveries and project development
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy, and other Rumble Projects is based on and fairly
represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans
is a full-time employee of Rumble Resources Limited,. Mr Timmermans has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources in relation to the Earaheedy Project is based on and fairly
represents information compiled under the supervision of Mr Mark Carder who is a Member of the Australian Institute of Geoscientists
(AIG) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity to which he is undertaking to qualify as a competent person as defined in the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. The Company confirms that it is not aware of any new information or data
that materially affects the Mineral Resource information included in the Announcements.
The Information in this announcement that relates to prior Exploration Results for the Earaheedy Project is extracted from the following
ASX announcements:
30th April 2024 - Wardawarra Project - Exploration Update
29th April 2024 - Drilling to test high-grade Gold Zones at Western Queen
21st February 2024 Mato Discovery Continues to Grow
9th January 2024 – Metallurgical Diamond Drilling Completed Successfully
14th November 2023 – Diamond drilling commences at Earaheedy Project
31st October 2023 – Mato Discovery confirmed with further high-grade Zn-Pb
24th October 2023 – Acquisition Increase Further Zn – Pb Potential
5th October 2023 – High Grade Zinc-Lead intersected at the Mato Prospect
17th July 2023 - Zinc Lead Mineralisation Discovered in Drilling
1st June 2023 - High impact drilling commences at the Earaheedy Project
3erd May 2023 - Heritage Clearance Received for Navajoh Southeast Trend
19th April 2023 - Maiden Mineral Resource - Earaheedy (Zn-Pb-Ag) Joint Venture
14th March 2023 - Chinook Zn-Pb Prospect expands to 8km strike.
16th February 2023 - Multiple New High-Grade Feeder Targets Defined
5th December 2022 - Drilling Results from Lamil Gold-Copper Project
17th November 2022 - Exceptional Metallurgical Results at Earaheedy Project
3rd November 2022- High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results information
included in the Announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the Announcements. The Company confirms that it is not aware of any information or
data that materially affects the information included in the relevant market announcement and all material assumptions and technical
parameters underpinning the estimates in the original announcement in respect of the Earaheedy MRE continue to apply and have not
materially changed.
Rumble Resources Limited - ASX: RTR
Page | 14
Appendix 1
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderstorm
E28/2528
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2529
Granted
Western Australia
30% Note 2
Thunderstorm
E28/2595
Granted
Western Australia
30% Note 2
Thunderdome
E28/2366
Granted
Western Australia
30% Note 2
Thunderbolt
E28/2924
Granted
Western Australia
100%
Thunderbolt
E28/3062
Granted
Western Australia
100%
Thunderbolt
E28/3065
Granted
Western Australia
100%
Thunderbolt
E28/3240
Granted
Western Australia
100%
Thunderbolt
E28/3219
Granted
Western Australia
100%
Thunderbolt
E28/3220
Granted
Western Australia
100%
Thunderbolt
E28/3221
Granted
Western Australia
100%
Thunderbolt
E28/3352
Granted
Western Australia
100%
Thunderbolt
E69/4170
Granted
Western Australia
100%
Thunderbolt
E28/3313
Application
Western Australia
100%
Thunderbolt
E28/3384
Application
Western Australia
100%
Squall
E28/3155
Granted
Western Australia
100%
Braeside
E45/4873
Granted
Western Australia
100%
Braeside
E45/4874
Granted
Western Australia
100%
Braeside
E45/4368
Granted
Western Australia
100%
Braeside
E45/2032
Granted
Western Australia
100%
Warroo
E45/5366
Granted
Western Australia
100%
Warroo
E45/5689
Granted
Western Australia
100%
Warroo
E45/5860
Application
Western Australia
100%
Earaheedy
E69/4062
Application
Western Australia
100%
Earaheedy
E69/4063
Application
Western Australia
100%
Earaheedy
E69/4099
Application
Western Australia
100%
Earaheedy
E69/3464
Granted
Western Australia
75% Note 1
Earaheedy
E69/3787
Granted
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 15
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Earaheedy
E69/3862
Granted
Western Australia
100%
Earaheedy
E69/4124
Granted
Western Australia
100%
Earaheedy
M69/0150
Application
Western Australia
75% Note 1
Earaheedy
L69/0058
Application
Western Australia
75% Note 1
Earaheedy
E69/4149
Application
Western Australia
100%
Earaheedy
E59/2816
Application
Western Australia
100%
Earaheedy
E69/4170
Application
Western Australia
100%
Munarra Gully
E51/1677
Granted
Western Australia
80% Note 3
Munarra Gully
E51/1919
Granted
Western Australia
100%
Munarra Gully
E51/1927
Granted
Western Australia
100%
Lamil
E45/5270
Granted
Western Australia
50% Note 4
Lamil
E45/5271
Granted
Western Australia
50% Note 4
Western Queen
M59/0045
Granted
Western Australia
100%
Western Queen
M59/0208
Granted
Western Australia
100%
Western Queen
L59/40
Granted
Western Australia
100%
Western Queen
E20/0967
Granted
Western Australia
100%
Western Queen
E59/2443
Application
Western Australia
100%
Yelina
E38/3919
Application
Western Australia
100%
Yelina
E38/3920
Application
Western Australia
100%
Yelina
E38/3921
Application
Western Australia
100%
Yelina
E38/3922
Application
Western Australia
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage Interest
Thunderbolt
E28/3352
Granted
Western Australia
100%
Thunderbolt
E69/4170
Granted
Western Australia
100%
Rumble Resources Limited - ASX: RTR
Page | 16
3. Mining tenements disposed of during the quarter and their location:
No tenements were disposed of during the quarter ending March 2024.
Rumble Joint Ventures - Notes
1. Earaheedy Project, Western Australia
E69/3464 75% RTR / 25% Zenith Minerals
M69/0150 75% RTR / 25% Zenith Minerals
L69/0058 75% RTR / 25% Zenith Minerals
2. Fraser Range Projects, Western Australia
E28/2528, E28/2529, E28/2595, E28/2366 - IGO 70% / RTR 30%
3. Munarra Gully, Western Australia
E51/1677 RTR 80% / 20% Marjorie Anne Molloy
4. Lamil Project, Western Australia
E45/5270, E45/5271 - RTR 50% / AIC Mines 50%
Rumble Resources Limited - ASX: RTR
Page | 17
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Rumble Resources Limited
ABN
Quarter ended (“current quarter”)
74 148 214 260
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(655)
(2,199)
(e) administration and corporate costs
(239)
(1,092)
1.3
Dividends received (see note 3)
1
1
1.4
Interest received
24
82
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
200
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(869)
(3,008)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(5)
(83)
(c) property, plant and equipment
(3)
(29)
(1,613)
(7,949)
(e) investments
-
-
(f)
-
-
(a) entities
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(1,621)
(8,061)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
8,670
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(2)
(587)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
(2)
8,083
Cash and cash equivalents at beginning of
period
3,685
4,179
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(869)
(3,008)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,621)
(8,061)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(2)
8,083
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
1,193
1,193
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
1,145
1,621
5.2
Call deposits
48
2,064
5.3
Bank overdrafts
-
-
5.4
Other (provide detail
Share your feedback
Discover