Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide an
update of the Company’s activities during the March 2017 quarter.
Highlights
Braeside Zn-Pb-Ag (Au, Cu) Project, Western Australia
Rumble exercised option to earn up to 70% in the high-grade Braeside Zn-Pb
project
Rumble Resources Ltd
Suite 9, 36 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
Historic mine produced zinc, lead and silver
rumbleresources.com.au
Significant historical grab sampling returned up to 18.9% Zn, 79% Pb, 11.64% Cu,
325 g/t Ag and 13 g/t Au
ASX RTR
Litho-geochemistry completed suggests the mineralisation is associated with sub
volcanic rhyolitic porphyry (Koongaling Felsic Volcanics) indicating potential for
VMS systems capable of hosting large base metal deposits
Executives & Management
Over 60km of strike potential with numerous untested Zn, Pb and Cu prospects
Mr Shane Sikora
Managing Director
Very limited modern exploration (only 6 drill-holes known) completed
Rumble to fast track systematic exploration targeting a VMS System
Ongoing Review of Resource Opportunities
Brett Keillor has enhanced the company strategy to proactively identify and review
potential acquisition and was instrumental in identifying and reviewing the
Braeside project
Mr Keillor has facilitated introductions to a number of other resources projects and
the company is now at advanced stages of due diligence and negotiations in
relation to those projects that met the company’s stringent criteria
R&D Refund
Rumble received $131,044 in R&D refund
During the quarter Rumble announced that it had exercised an option agreement to
acquire up to 70% of the historic high grade Braeside Zn-Pb (Ag-Cu-Au) Project (“the
Project”).
Brett Keillor as Technical Director was instrumental in identifying the Braeside
project opportunity. Brett has over 30 years’ experience in the mining industry
working across a diverse range of commodities with expertise in targeting large
deposits and identifying company making projects. Brett worked and reviewed
exploration and development projects across the globe for Independence Group and
Resolute and has been instrumental in discovering seven significant deposits.
Mr Brett Keillor
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Steven Wood
Company Secretary
Image 1 – Historic Zn-Pb-Ag Ragged Hills Mine
Braeside Project location and Geology
The Braeside Project (E45/2032) is located in the northern Gregory Ranges, 129 kilometres east of Marble
Bar with access to the main Telfer mine road. The project hosts the Braeside Zn-Pb Ag mining district which
includes the Ragged Hills mining centre (discovered in 1901) and numerous small mines along a major
structure known as the Braeside Fault zone. The historic mines were operative from 1925 to 1967.
On the discovery of the VMS potential Rumble secured 3 additional exploration licence applications covering
the fault structure to take the total area to over 646 km2. There is now over 60km of strike of numerous
untested Zn, Pb and Cu prospects along a mineralised fault structured corridor.
The Braeside Fault zone contains high grade poly-metallic mineralisation with dominant galena and
associated sphalerite and chalcopyrite. Mineralisation at the Ragged Hills Mine is up to 4.2m wide in steep
dipping fault/shears. Mineralised breccia/stockworking up to 50m in width is reported at Gossan Hill. Historic
artisanal mining focused on massive galena shoots (up to 1.5m in width) within the mineralised zones.
The Braeside Fault zone and associated mineralisation are hosted in Fortescue Group mafic volcanics and
volcaniclastics (Pearana Basalt and the Kylena Basalt) underlain by the Koongaling Felsic Volcanics. The
felsic volcanics are bimodal with the Fortescue Group basalts and are potentially the source of the polymetallic mineralisation. Pb age dating of the mineralised basalts hosting galena is the same age as the
Koongaling Felsics (2.76Ga).
Image 2: Braeside Tenement Area highlighting Fault Fracture System
Historic Exploration
Drilling
The reported historical exploration is limited to six known drill-holes. Three holes were completed in 1928 by
the Department of Mines and three by Anglo Westralian Pty Ltd in 1951, focussing on the workings at
Ragged Hills and Barker Well. The best historical drilling intercept at Ragged Hills was reported by Anglo
Westralian Pty Ltd in 1951 to be:
1.83m (horizontal width) at 8.1% Pb, 4.6% Zn and 6.2ppm Ag.
Due to the historical nature of the drill holes the Company has been unable to locate or provide further drill
hole data as required under ASX Listing 5.7.2, however does not believe the excluded information is material
and rather these limited results are included to support the Company’s belief in the exploration potential of
the Braeside Project.
Grab Sampling
Historic grab sampling conducted within the project area includes three surveys completed in 1987, 1990 and
1993. Very high grade base metal and gold reported in 1987 is interpreted to be associated with a line of
workings west of the main Ragged Hills mine area. A total of seventy seven (77) grab samples returned Zn
up to 18.9% (17 samples > 1% Zn), Pb up to 79% (35 samples >10% Pb), Cu up to 11.64% (22 samples
>1% Cu), Ag up to 325 g/t (44 samples > 20 g/t Ag) and Au up to 13 g/t (12 samples >1 g/t Au). The
Company is conducting further due diligence on the assay results from 1987 and considers the grab samples
likely to represent ore samples from old workings.
In 1990 and 1993 regional grab sampling throughout the project area was completed by helicopter and
ground traverses. A total of one hundred and sixty eight (168) grab samples were collected over a broad area
and very high grade results include Zn up to 8.1% (2 samples > 1% Zn), Pb up to 69.3% (11 samples
>10% Pb), Cu up to 7.5% (11 samples > 1% Cu), Ag up to 112 g/t (9 samples > 20 g/t Ag) and only a
trace of Au. It is important to note that the focus of the samples in 1990 and 1993 were to find gold
prospects.
A previous report in respect to the Ragged Hills mine area stated that “an average of 22 ore samples gives
27.2% Pb and 110.72 g/t Ag”, and noted that copper was present and enriched at the surface.
Please see Annexure A - tables 2, 3 & 4 for further sampling data in respect of the above historical results.
Rumble Due Diligence Completed
Rumble’s successful due diligence program included onsite inspection, legal /environmental/native title
review, check sampling and litho-geochemistry focused on the Ragged Hills Mine area.
Limited check sampling (17 grab samples) of mineralised structures at the Ragged Hills deposit and general
surrounds confirmed the high grade nature of the project with returns high in Zn and Pb values and strongly
elevated Ag and Cu. Au is anomalous and is associated with the polymetallic mineralisation at Ragged Hills.
Sample ID
BRRK001
BRRK002
BRRK007
BRRK008
BRRK009
BRRK012
BRRK013
BRRK014
BRRK015
BRRK017
Au
ppb
40
96
116
8
271
23
29
7
42
83
Ag
ppm
8
88
76
X
91
67
16
35
49
8
Cu
ppm
381
505
241
192
360
181
759
8
6
31165
Pb
%
1.95
31.54
26.34
11.94
35.69
14.51
0.065
14.88
23.42
1.08
Zn
%
7.09
5.48
0.08
0.14
0.06
0.11
8.43
0.07
0.05
7.17
Table 1. Check Sampling Ragged Hill Mine Area – Select High Grade Zn and Pb Grab Samples – April 2017
Litho-geochemistry (whole rock analysis) involved assaying proximal and distal wall rock alteration to the
main sulphide-silica veins at the Ragged Hills deposit. Unaltered country rock was analysed for background
reference. Approximately 4km east of the Ragged Hill deposit, relatively fresh outcrops of porphyritic rhyolite
(Koongaling Felsic Volcanics) was analysed (whole rock) to ascertain type and fertility.
Exploration Model
Litho-geochemistry and check sampling conducted by Rumble has highlighted that the base metal
mineralisation has a strong association with sub volcanic porphyritic rhyolites of the Koongaling Felsic
Volcanic sequence that lies immediately east of the Braeside Fault system. Litho-geochemistry analysis of
the porphyritic rhyolites (calc-alkaline type) indicate the rocks correlate with FIIIa type rhyolites which are
considered prospective for VMS deposits. Wall rock alteration geochemistry associated with the known base
metal mineralisation at the Ragged Hills Zn Pb Ag deposit returned strong Na, Ca depletion with strong K,
Ba, Sn and Al addition. The litho-geochemistry indicates the base metal mineralisation and associated
Braeside Fault Fracture system potentially represents a feeder fracture/fault network to underlying sub
volcanic porphyritic rhyolites.
Age dating by the Geological Survey of Western Australia supports potential bimodal volcanism with the
Koongaling Felsic Volcanics returning an age of 2760 +/- 10 Ma. The host rocks to the base metal
mineralisation (Kylena Basalt) has an age of 2760 +/- 30 Ma. Pb age dating of the mineralised basalts
hosting galena is the same age as the Koongaling Felsics Volcanics.
The exploration model supports the potential for VMS mineralisation associated with underlying sub volcanic
porphyritic rhyolite. At the Ragged Hills deposit, the mineralised feeders are relatively deep indicating the
potential VMS sub seafloor deposition level has been stripped off (erosion or tectonic). However, there is
potential for high grade Zn Pb Ag pipe like deposits located at feeder fault intersections.
Further north of the Ragged Hills deposit area and along the Braeside Fault fracture system (within the
project area), volcaniclastic and shale lithologies have been mapped and may represent palaeo-seafloor
positions that have potential to develop VMS deposits.
Image 3: Exploration Model for the Ragged Hills Mine area. Porphyry related
Massive Sulphides associated with feeder zones –Bimodal VMS Potential.
Exploration Process
The Braeside Project consists of multiple high grade Zn, Pb, Cu and Ag deposits and occurrences
associated with a major NNW fault zone within mafic volcanics and volcaniclastics over a strike of at least
30km. The poly-metallic mineralisation has not been tested by detail geophysics and geochemistry with only
6 historic drill-holes known partially testing immediately below historic workings.
Wide (50m) zones of breccia/stockworking within the highly mineralised structural corridor remain completely
untested at the Gossan Hill prospect.
Rumbles technical team has developed a program to systematically explore the Braeside projects looking to
generate first order VMS targets using proven exploration techniques. Rumble will fast track exploration in
stages outlined below:
Stage 1: Regional soil geochemistry (multielement) to cover E45/2032 – Team ready to be mobilised.
Stage 2: Airborne VTEM over the regional geochemical base metal trends.
Stage 3: Infill geochemistry over conductors (generated by VTEM) to rank targets.
Stage 4: Ground TEM surveys over the conductors (targets) with appropriate surface geochemistry to
delineate potential massive sulphide positions.
Stage 5: Drill test conductive plates.
Key Commercial Terms of the Braeside Binding Option Agreement
As a result of exercising the option, Rumble agrees to acquire 70% of the title and interest in the Braeside
Project based on the below Terms:
a. RTR to expend A$1,500,000 on exploration over a period of 3 years from the execution of the option to
earn 70%.
b. RTR to expend A$200,000 before it can withdraw from the earn-in agreement.
c. Rumble to pay Maverick Exploration Pty Ltd A$30,000 on exercising the option – complete.
d. Maverick Exploration Pty Ltd is free carried to decision to mine (after BFS).
e. Following the completion of a BFS and decision to mine, Maverick Exploration Pty Ltd can either elect to
contribute to ongoing project development or dilute to a 1.5% NSR.
Ongoing Review of Resource Opportunities
The addition to the board of Brett Keillor has enhanced the company strategy to proactively identify and
review potential acquisition opportunities to complement the Company's existing projects and activities.
Mr Keillor has facilitated introductions to a number of advanced resources projects. The company is now at
advanced stages of due diligence and negotiations in relation to those projects that met the company’s
stringent criteria.
The Company will keep the market updated should any of these discussions result in an agreement being
reached.
Rumble Current Portfolio
The Company continues to review its project portfolio which encompassed project prioritisation and
consideration of expenditure commitments with a view to rationalise costs. There was no on-ground
exploration activity during the quarter.
During the quarter Rumble sold the Sidewinder project for $20,000 cash consideration.
R&D Refund
Rumble received an R&D refund of $131,044 during the quarter.
Shane Sikora
Managing Director
- ENDS For further information visit rumbleresources.com.au or contact enquiries@rumbleresources.com.au.
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was established with
the aim of adding significant value to its current gold and base metal assets and will continue to look at mineral acquisition opportunities both in
Australia and abroad.
Forward Looking and Cautionary Statement
The information in this report that relates to historic exploration results was collected from DMP reports submitted by government agencies and
previous explorers. Rumble has not completed the historical data or the verification process. As sufficient work has not yet been done to verify the
historical exploration results, investors are cautioned against placing undue reliance on them.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Darryl Mapleson, who is a Member of the
Australasian Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Mapleson is an employee of BMGS who is a consultant
of Rumble Resources Limited. Mr Mapleson has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Mapleson consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Appendix
In accordance with Listing Rule 5.3.3. Rumble provides the following information in relation to its mining tenements.
1. The mining tenements held at the end of the quarter and their location.
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Beadell
E45/2405
Granted
Western Australia
100%
Beadell
E45/4891
Application
Western Australia
100%
Big Red
E28/2268
Granted
Western Australia
100%
Thunderstorm
E28/2528
Granted
Western Australia
100%
Thunderstorm
E28/2529
Granted
Western Australia
100%
Thunderstorm
E28/2595
Application
Western Australia
100%
Thunderdome
E28/2366
Granted
Western Australia
100%
Mt Gibson
E59/2215
Granted
Western Australia
100%
Mt Gibson
E59/2216
Granted
Western Australia
100%
Braeside
E45/4872
Application
Western Australia
100%
Braeside
E45/4873
Application
Western Australia
100%
Braeside
E45/4874
Application
Western Australia
100%
Derosa
Bompela
Granted
Burkina Faso
85% Note 1
Burkina Faso
Pogoro
Granted
Burkina Faso
100%
Burkina Faso
Yalore
Granted
Burkina Faso
100%
2. Mining tenements acquired during the quarter and their location:
Project
Tenement
Number
Status
Location
Beneficial
Percentage
Interest
Beadell
E45/4891
Application
Western Australia
100%
Braeside
E45/4872
Application
Western Australia
100%
Braeside
E45/4873
Application
Western Australia
100%
Braeside
E45/4874
Application
Western Australia
100%
3. Mining tenements disposed of during the quarter and their location:
Project
Tenement
Number
Status
Location
Comment
Beadell
E45/4662
Application
Western Australia
Withdrawn
Big Red
E69/3190
Granted
Western Australia
Surrendered
Sidewinder
E58/484
Granted
Western Australia
Divested
Sidewinder
E59/2119
Granted
Western Australia
Divested
1. Derosa Project, Burkina Faso
Bompela is subject to a Joint Venture agreement with Canyon Resources limited whereby Rumble owns
85% interest and Canyon a 15% interest.
Sampling Techniques and Data by Rumble Resources
Criteria
JORC Code explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
Drilling
techniques
Drill sample
recovery
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.)..
Method of recording and assessing core and chip
sample recoveries and results assessed.
Commentary
Sampling completed by Rumble.
Rock chip sampling – Ragged Hills
mine area and surrounds.
Samples taken of in situ
mineralisation and wall rock
alteration (proximal and distal)
Not applicable as no drilling
completed.
Not applicable as no drilling
completed.
Not applicable as no drilling
completed.
Not applicable as no drilling
completed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Logging
Subsampling
techniques
and sample
preparation
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Criteria
JORC Code explanation
Commentary
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
Seventeen (17) grab samples were
assayed by Intertek Genalysis Labs,
Maddington. Method was 4 acid digest
and analysed by ICP and OE. 33
elements tested. Au was assayed as a
25g charge using a agua regia digest
and anaylsied by MS.
Nine (9) channel grab samples were
assayed by Intertek Genalysis Labs,
Maddington. Whole rock analysis was
completed by lithium metaborate fusion
and analysed by ICP and OE. LOI was
completed by TGA.
Not applicable as no drilling
completed.
Verification
of sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
Both grab and channel grab sampling
was located by hand held GPS using
GDA94 Z51 as datum.
Not applicable as no drilling
completed.
Grab sampling was completed in situ in
association with the known historic
base metal mineralization system at
the Ragged Hills Pb – Zn deposit.
Directly sent to Lab in appropriate tied
polywoven and calico bags
The results of any audits or reviews of sampling
techniques and data.
Initial check sample of historic grab
samples
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
.
Section 2 – Reporting of Historic Exploration Results
Criteria
JORC Code explanation
Mineral
tenement and
land
tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The project comprises of a single
granted exploration licence –
E45/2032.
The licence is currently granted and
before the announced option, 100%
owned by Maverick Exploration Pty
Ltd.
The licence is granted, in a state of
good standing and have no known
impediments to operate in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
All data presented in this release is of
historical nature.
Geology
Unknown deposit style, current
assessment and data collection will aid
in determining style.
Drill
hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional
Drill hole location data is incomplete
A select drill hole intercept as defined
by Bulletin 15 is presented to highlight
metal association and likely indicative
grade.
No exclusion of information.
No averaging of drill assay results
reported
No aggregate intercepts reported
No metal equivalents reported
Historical drill holes seem to have
been design to best test near vertical
mineralization.
Select intercept is considered true
width as reported in Bulletin 15.
Refer Image 1 contained in body of
announcement.
Image of the historic Ragged Hills Pb,
Zn, Ag mine which lies within the
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
Diagrams
Deposit type, geological setting and style of
mineralisation.
Commentary
Criteria
JORC Code explanation
Commentary
project.
views.
Balanced
reporting
Other
substantive
exploration
data
Further work
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
Refer Image 2 contained in body of
announcement.
Diagrammatic image based on the
GSWA mapping show project area
with known prospects.
Only assay data verified from
Government report and submitted
Open File reporting used.
Data collection and validation is still in
progress
Due diligence as part of the option
agreement is ongoing
Annexure A
Table 1. Check Sampling Ragged Hill Mine Area – Select High Grade Zn and Pb Grab Samples – April 2017
Sample ID
BRRK001
BRRK002
BRRK007
BRRK008
BRRK009
BRRK012
BRRK013
BRRK014
BRRK015
BRRK017
Au
ppb
40
96
116
8
271
23
29
7
42
83
Ag
ppm
8
88
76
X
91
67
16
35
49
8
Cu
ppm
381
505
241
192
360
181
759
8
6
31165
Pb
%
1.95
31.54
26.34
11.94
35.69
14.51
0.065
14.88
23.42
1.08
Zn
%
7.09
5.48
0.08
0.14
0.06
0.11
8.43
0.07
0.05
7.17
.
Table 2 – Braeside Project - Significant Historical Assays– Analabs – November 1987
Sample
Number
Cu
Units
Results in Ppm unless otherwise specified
1.50%
340
21.5
1.720
3990
Zn
Ag
Au
Pb
560
3992
5.00%
405
42.5
0.425
260
3993
9.60%
2400
65.0
7.830
465
3994
1.50%
295
25.5
0.583
85
3995
4.30%
455
31.5
0.242
165
3996
3.10%
270
21.0
0.458
820
3997
2.40%
195
20.0
3.050
4700
3998
9.61%
1025
14.1
1.26
490
3999
4.50%
1800
13.0
1.17
305
4000
10.89%
825
7.0
1.73
500
4001
4.50%
460
23.5
3.200
0.97%
4003
4.70%
425
8.0
0.458
2900
4004
2.20%
220
19.5
13.00
835
4005
8000
340
6.0
2.48
585
4006
7400
210
15.0
0.975
1700
4007
6.00%
1350
7.0
0.167
1050
4008
4000
2.60%
11.5
0.533
28.70%
4009
1700
1900
165.0
0.117
58.30%
4010
2200
1.60%
175.0
0.333
54.30%
4011
4100
640
325.0
0.225
44.70%
4012
6400
1095
6.5
0.367
1.10%
4013
4.20%
1100
140.0
0.292
600
4014
3.10%
395
24.5
7.33
1090
4015
2.30%
515
38.0
0.100
110
4020
1.30%
60
-
-
0.78%
4022
280
235
210.00
0.267
26.85%
4023
555
120
105.00
0.04
37.25%
4024
500
130
275.00
0.108
39.80%
4025
1100
90
300.00
0.133
31.35%
4026
190
85
142.50
0.058
54.00%
4027
3800
4.90%
75.00
0.25
5