Western Queen Drilling & Development Update
Released
Released
Announcement PDF
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 1
ASX ANNOUNCEMENT
22 October 2025
Western Queen Drilling & Development Update
Key points
• Exploration
o Diamond drilling well underway
o 929 metres completed to date
• Potential mine development
o Underground mining project demonstrates superior economics over the open pit project
o Underground mining scoping study well advanced
• Third party ore processing
o Non-binding MoU signed with Gylden Resources in relation to processing ore through Kirkalocka
o A draft toll treating agreement has been received from Gylden
Peter Harold, Managing Director and CEO commented:
“The drilling is off to a good start with two holes completed to date.
Our review of the open pit compared to the underground mine plan shows the underground project has superior
economics and we are now progressing the underground as our preferred scenario.
We are also delighted to have signed a MoU with Gylden Resources in relation to potentially processing Western
Queen ore through their Kirkalocka plant.”
Figure 1 – Western Queen Long Section showing target areas below Western Queen South and Central
deposits
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 2
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) provides this update on the current
exploration program and potential development of the Western Queen Gold Project.
Exploration – diamond drill program underway
The Company commenced a diamond drill program of up to 20,000m at Western Queen last week. The first of
two rigs to be supplied by DDH1 Drilling (DDH1) has drilled 929 metres as at 20 October 2025. The second rig is
due on-site in the next few weeks. The program is scheduled to be completed during February 2026.
Figure 2 – DDH1 Drilling rig at Western Queen South
The objectives of the current drill program are:
1. Discover more Gold Resources - The key focus of the drill program is to target high-grade, down plunge
extensions to the Western Queen South and Central deposits (refer Figure 1) to grow the Western Queen
gold Mineral Resource Estimate (MRE) of 3.72Mt @ 3.1g/t Au for a total of 370,000 oz Au1
.
2. Upgrade Inferred to Indicated Resources - A small portion of the program will infill the existing Western
Queen South MRE which currently stands at 2.32Mt @ 2.66g/t Au for 198,900 oz1
, with the aim of
converting existing Inferred to Indicated Resources ahead of the commencement of mining operations,
subject to permitting, executing an ore sales or ore toll milling agreement and all other necessary conditions
required for a Financial Investment Decision.
3. Discover more Tungsten Resources – Drilling to discover more high-grade tungsten lodes, which are spatially
adjacent, and sub-parallel to, the high-grade gold lodes with the aim of growing the recently announced
maiden Western Queen tungsten MRE of 4.31Mt @ 0.31% WO3 for 13.2Kt WO3
2
at a 0.1% WO3 cut-off which
contains a higher-grade portion of 1.44Mt @ 0.51% WO3 for 7.4Kt WO3
2
at 0.3% WO3 cut off. The drill
program will also further assist in developing the understanding of the controls and timing of the tungsten
1
Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au”
2
Refer to Rumble ASX release 11 August 2025 “Maiden Tungsten Resource at Western Queen Project”.
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 3
mineralisation at Western Queen and provide critical information that can be applied to the targeting of the
tungsten potential at a local and district scale.
4. Geotechnical review - Two holes will be drilled to understand the geotechnical conditions in the area where
the underground portal and decline is proposed.
5. Gold recovery confirmation - Selected diamond holes will be used to provide samples for a metallurgical
testwork program across both the Western Queen South and Central deposits to validate the previously
achieved high gold recoveries of +93% from prior mining operations. The drill program should provide the
basis for a revised Western Queen MRE in early 2026.
Mining Studies – underground the preferred option
• Western Queen Open Pit Option – Review of Smaller Pit
The smaller pit option for the Western Queen South open pit has been reviewed by the Company. The
underground mining project has superior economic outcomes based on an internal assessment and consequently
the Company is now pursuing the underground as the preferred option.
• Western Queen South and Central Underground Option – Scoping Study
The scoping study on mining both Western Queen South and Central from underground is well advanced and on
track to be delivered during the December 2025 quarter.
Third party processing
Discussions have continued with the owners of gold processing plants in the vicinity of Western Queen. A non-
binding Memorandum of Understanding has been signed with Gylden Resources Pty Ltd (“Gylden”) in relation to
the potential to treat Western Queen ore through their Kirkalocka plant (see Figure 3) and Gylden has provided
a draft ore tolling agreement.
Figure 3 – Location of Western Queen Project in relation to gold processing plants within a 200km radius
Rumble Resources Limited
ASX:RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +6186555 3980
E:info@rumbleresources.com.au
HeadOffice
Level1, 16 OrdSt
WestPerth, WesternAustralia6005 4
Authorisation
This announcement is authorised for release by the Board of the Company.
-Ends-
For further information visit rumbleresources.com.au or contact info@rumbleresources.com.au
Peter Harold
Managing Director & CEO
Rumble Resources Limited
Peter Venn
Technical Director
Rumble Resources Limited
Trevor Hart
Chief Financial Officer
Rumble Resources Limited
About Rumble
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold Project which is being
developed to deliver near term cash flow from the existing resources and resource growth through future
exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the
capabilities of the exploration team to find world class orebodies.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX
market announcements released on the date noted in the body of the text where that reference appears. The previous market
announcements are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Share your feedback
Discover