Company Presentation
Released
Released
Announcement PDF
Earaheedy – Emerging World Class
Zinc-Lead-Silver Resource in Western Australia
Corporate Presentation | August 2023
ASX: RTR
Earaheedy: Globally Significant Maiden Resource
Maiden Sulphide, pit constrained; Inferred Mineral Resource Estimate (MRE):
94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cutoff) for
2.2Mt Zinc, 0.7Mt Lead and 12.6Moz Silver of contained metal
•
Large scale, low-cost open pit mining proposition in premier mining jurisdiction of Western Australia
•
Represents one of the largest zinc sulphide discoveries globally over the last decade
•
Highly leveraged to the global renewable energy transition
Exceptional resource growth and Tier 1 scale potential
•
Deposits remain open with less than 35% of the 45km Unconformity Unit effectively drill tested
•
•
High grade MVT deposit targets in fertile underlying carbonate formations untested
Significant potential to increase to Super Giant category (>300Mt)
Excellent metallurgical results
•
High recoveries and marketable concentrate grades support a potential simple low Capex and
Opex flowsheet
Project Optionality
•
The Pit Constrained MRE hosts a 41Mt higher-grade component >3% Zn+Pb cut-off and a very large
462Mt component > 0.5% Zn+Pb cut-off that could be upgraded through beneficiation
2
Corporate Overview
Capital Structure (RTR:ASX)
Shares On Issue
Board of Directors
(m)
636.7
(m)
10.5
Market Capitalisation3
(A$m)
108.2
Cash and Equivalents
(30 June 2023)
(A$m)
4.4
Debt
(A$m)
Nil
Enterprise Value3
(A$m)
103.6
Unlisted Options
1,2
Notes:
1. 5.5 million 58c Options (Various Expiry)
2. 5.0 million Performance Options Vesting $1 & $2 (unvested)
3. As at 8th August 2023
Research Analyst Coverage
Bradley Watson
Management
Shane Sikora
Managing Director
Brett Keillor
Head of Technical
Peter Venn
Non-Executive Director
Ben Jones
Chief Geologist
Geoff Jones
Non-Executive Director
Luke Timmermans
Project Manager, Earaheedy
Michael Smith
Non-Executive Director
Trevor Hart
Chief Financial Officer
Matthew Banks
Non-Executive Director
Shareholders
Board and Management
Top 20
10%
29%
Sam Catalano
3
Major Zinc Sulphide Discovery in Western Australia
• Major sedimentary hosted base metal discovery
in the Earaheedy Basin announced on 19 April 2021
Chinook discovery hole intersected:
o 34m @ 4.22% Zn+Pb from 66m, incl.
15m @ 6.97% Zn+Pb, from 74m
• Maiden JORC compliant Mineral Resource Estimate
in 24 months
• Maiden resource based on 658 holes for 102,000m
of drilling
• Zinc Sulphide dominant (up to 10:1 Zn:Pb)
• Represents one of the largest zinc discoveries
globally in past decade
• Located 100km north of Wiluna in Western Australia;
a world class mining jurisdiction with access to
major highways, power, rail, ports and mining
workforce
4
Globally Significant Pit Constrained Maiden Resource
5
Exceptional Resource Growth Potential
• Inferred resources constrained
to closer spaced drilling with
potential to significantly grow
resources with extensional
drilling
• Exceptional resource growth
potential with deposits open in
all directions
• Mineralisation intersected in
broad spaced drilling outside of
inferred resource areas
highlights the potential for
new resource discoveries
• Potential to discover highgrade MVT and fault related
resources beneath inferred
resource area in underlying
formations
6
Chinook: Resource Growth Potential
•
8km x 2km Navajoh
unconformity Zn-Pb
mineralisation (host to Zn-Pb
Pit Constrained Resources)
remains open along strike
and down dip
•
Chikamin and Kalitan highgrade feeder structures (>5%
>8%) Zn-Pb remain open
•
Potential to discover highgrade MVT and fault
related resources beneath
inferred resource area in
underlying carbonate
formations (evidenced by
6m @ 10.51% Zn+Pb & 8m
@ 14.61% Zn+Pb in
interpreted feeder zone)
•
Zinc sulphide dominant
(approximately 3:1 Zn:Pb)
7
Chinook Deposit: Optimised Pit
• Optimised pits highlight
potential for a large tonnage,
low-cost open pit mining
scenario
• Higher Grade resources close
to surface highlight optionality
• Optimised open pits
constrained to depth of
drilling
• Significant resource growth
potential with deposit open in
all directions
• Potential to discover highgrade MVT and fault related
mineralisation beneath inferred
resource area in underlying
carbonate formations
Image: NW view of pits >1.5%Zn+Pb COG
8
Tonka and Navajoh: Resource Growth Potential
•
11km x 2km Navajoh unconformity ZnPb mineralisation (host to Zn-Pb Pit
Constrained Resources) remains
open along strike and down dip
•
Colorado, Magazine and Navajoh
high-grade feeder faults (>5% >8%)
Zn-Pb remain open
•
Mineralisation intersected in broad
spaced drilling outside of inferred
resource areas highlights the
potential for new resource
discoveries
•
Potential to discover high-grade MVT
and fault related resources beneath
inferred resource area in underlying
carbonate formations (evidenced by
3m @ 19.93% Zn+Pb & 5m @ 14.14%
Zn+Pb in interpreted feeder zone)
•
Zinc sulphide dominant (up to 10:1
Zn:Pb)
9
Flat Lying, Feeder Faults with Open Pit Potential
•
Shallow and flat lying Zn-Pb
mineralisation hosted in Navajoh
Unconformity Unit Sweetwaters
Well Dolomite - Only formations
tested to date
•
Potential large scale open pit
mine development
•
Potential free dig scenario –
Low-cost waste removal
•
Colorado and Magazine higher
Grade Zn-Pb Feeder Faults –
Untested at depth
•
Significant potential to discover
high-grade MVT and fault
related mineralisation beneath
inferred resource area in
underlying carbonate formations Untested
10
Metallurgy – A Highly Marketable Concentrate
•
•
•
•
•
•
PROSPECT
CHINOOK
TONKA
Composite
A - EHS001/002 B - EDH019
C- EDH027
High zinc recoveries to 90% Zn in
Host
Unconformity Unconformity
Dolomite
cleaner concentrates
Feed Grades
Zn
%
3.92
4.72
1.25
Coarse grind size (150 micron)
Pb
%
2.33
0.49
0.15
Rougher Recoveries
Fast flotation with clean sulphide
Zn
%
86.1
89.6
96.7
separation in site water
Pb
%
63
82.3
82.1
Cleaner Recoveries
Simple and conventional process
flowsheet – low capex/opex potential Zn
%
78.6
84.2
89.6
Pb
%
41
72
70
Zinc concentrate grade to 59% Zn is Cleaner Concentrate Grades
highly marketable
Zn
%
44.5
58.8
49.6
Pb
%
13.7
5.2
4.8
Higher end of global benchmark to
Zn+Pb
%
58.3
64.0
54.4
current developers and producers
•
Average
Tonka
Average
Combined
93.2
82.2
90.8
75.7
86.9
70.8
84.1
60.8
54.2
5.0
59.2
51.0
7.9
58.9
Table: Metallurgical Testwork Summary – incl Rougher Recoveries / Cleaner Recoveries and Concentrate Grades
Considerable potential for further
metallurgical improvements
(optimisation and beneficiation)
Table: Tonka Earaheedy Zinc Recoveries and Zinc Concentrate vs Global Producers
1 New Century Resources Limited – Quarterly Activities Report Dec-21,
2 Wood Mackenzie, August 2018 (N/A – information not available)
3 MMG Limited – Fourth Quarter Production Report 2021
4 – Vedanta Zinc - Wood Mackenzie August 2018 (N/A – information not available)
5 – Teck Resources Limited – Q2 2022 Financial Report
Refer to slide 35 for the details regarding the above peer comparison information.
11
Metallurgy – No Penalty Elements
Company
New Century
Glencore
MMG
Vedanta Zinc
Teck
Rumble
Project
Century
Mcarthur River
Dugald River
Gamsberg
Red Dog
Tonka Earaheedy
5.0
<0.01
4.5
0.4
0.02
80ppm
3.8
31.7
150ppm
6.6
<0.2
1.35
TBD
<0.1
TBD
5
33.7
TBD
% Unless otherwise stated
Fe
Mn
SiO2
Cd
As
Hg
Pb
S
Ag
3
<0.15
5
0.12
<0.01
<50 ppm
8
28.5
150 ppm
5.9
<0.01
4.6
0.12
0.2
40 ppm
4.6
30
130ppm
11
2
3.5
<0.1
0.02
15 ppm
0.2
31
80 ppm
8.9
2.6
2
<0.1
<0.01
22 ppm
0.1
29.4
2 ppm
Table: Tonka Earaheedy Low Penalty Elements vs Global Producers (orange - penalties apply)
Table: Peer Comparison Source Information from slide 47
12
Potential DMS & Ore Sorting benefits
•
Rumble will trial DMS and Ore Sorting in 2023 for the mineralisation outside the higher-grade Zn-Pb zones - benefits include;
o Technique can increase on average ore grade by 2-5 times – Examples in Table below
o Removes waste early which can significantly lower the CAPEX and OPEX
o Flotation recoveries can generally be increased with higher head grade
o Environment – Reduce tailings
o Greater optionality and productivity
Project
DMS & Ore Sorting Examples
1
Pering (Zn-Pb)
South Africa
•
•
•
Resource 50Mt @ 1.1% Zn and 0.3% Pb – MVT Type Open Pit Deposit
DMS delivered 4x upgrade (3.9% Zn and 1.1% Pb)
DMS rejected 80% of waste
2
Sabre’s Border (Zn-Pb)
Namibia
•
•
•
Resource 16.2Mt @ 1.53% Zn and 0.59% Pb – MVT Type Open Pit Deposit
DMS delivered 8 x Upgrade (12.5% Zn and 6.3% Pb)
DMS rejected 83% of waste
3
Sorby Hills (Pb-Ag) Western
Australia
•
•
•
Resource 13.5Mt @ 3.6% Pb and 40g/t Ag (~2.6% ZnEq) MVT Type Open Pit Deposit
DMS delivered 2.5 x Upgrade of lower grade material
DMS rejected 70% of waste
Source:
•
Pering Mine economic statement 31st December 2010,
•
Sabre Resources ASX announcement 24th January 2012 - https://www.asx.com.au/asxpdf/20120124/pdf/423xbbgrpfxhy4.pdf
•
Boab Metals Asx announcements 19th November 2021 https://boabmetals.com/wp-content/uploads/2021/11/20211119-2303039-DFS-Met-Testwork-results.pdf & 25th August 2020 - https://boabmetals.com/wpcontent/uploads/2021/02/20200825_Sorby_Hills_PFS_Delivers_Outstanding_Results_final.pdf
13
Discovery Potential – Tip of the Iceberg
Targets 1 & 2 - Unconformity Zn-Pb-Ag
• Flat lying Zn-Pb-Ag at Chinook, Tonka and Navajoh Prospects
• Only style currently drill testing
Target 3 - MVT Type Zn-Pb-Ag
• Historic drilling intersected MVT Zn-Pb-Ag
• Multiple targets to be tested in 2023
• Untested to date
Target 4 & 5 - High Angle Fault/Feeder Zone Zn-Pb-Ag
• Strickland Metals intersected high-grade Zn-Pb in the Iroquois
• Rumble drilling intercepted Zn-Pb-Cu in the Purple Shale
• Multiple targets to be tested in 2023
• Untested to date
14
Tonka/Navajoh Southeast Trend: High-Grade Feeder Targets
Tonka/Navajoh Prospect
•
Gravity gradient interpretation has shown
strong association with gravity lows
and high-grade Zn-Pb feeder faults
•
Soil geochemistry is reflecting the up
dip Zn-Pb mineralised position
•
Numerous gravity lows has defined new
untested high grade feeder fault
targets and extensions to feeders
within the prospect
Navajoh Southeast Trend - Untested
•
Soil geochemistry returned equivalent or
higher tenor Zn-Pb mineralisation than
the Navajoh Prospect along the entire
9km’s
•
Numerous gravity lows along the entire
9km represent new untested high
grade feeder fault targets
15
Tier 1 Scale Potential
45km Unconformity (Targets 1-5) Strike
• Chinook Prospect mineralised footprint is 8km x
2km - open in all directions
• Tonka - Prospect mineralised footprint is 11km x
2km - open in all directions
• 12km of the Sweetwater Trend – Newly
Discovered Mato Prospect
• 9km of Navajoh Southeast Trend – Drilling
Commenced
• MVT and structurally hosted high-grade
underground deposits in underlying geological
formations - Untested
35km of Iroquois Carbonate Strike (Target 4)
• Limited historic drilling intercepted Zn-Pb and
Strickland’s drill results along trend, highlights
potential for near surface MVT deposits untested
16
Zinc’s Role in a Low-Carbon Economy
Zinc is a critical mineral for renewal energy storage
Offshore wind turbines
require a zinc coating to
handle extreme
environmental conditions
A 10 MWh
offshore
wind
turbine
required 4
tonnes of
zinc
Source: International Zinc Association, A2Mac1
Zinc
coatings
protect
solar panel
fixtures and
prevent rust
A 100 megawatt hour
(MWh) solar power park
requires 240 tonnes of
zinc
1
Zinc is a key ingredient in
battery technology that enables
carbon emission reduction
2
Zinc-ion batteries are safer than
lithium-ion batteries as they use
water-based chemistry (avoiding
fires)
3
Galvanised steel requires zinc
and is the preferred material
used by EV manufacturers
17
Forecast Zinc Production and Future Supply Deficit
• Zinc inventories at
historic lows
• Supply Deficit - 4 out of
10 major producers
estimated to have less
than 10 years remaining of
mine life
• Supply - Expected to fall
3.5% pa to 2030 due to
depleted mines
• Demand - Significant
production increase
required by 2040
• Underinvestment
globally for discoveries
• New mines are essential
to meet demand
Source: * Wood Mackenzie
* South 32 (17-1-22) - 1.5° (Climate Change Scenario): https://www.south32.net/docs/default-source/exchange-releases/hermosa-project-update-presentation43ee85d99c0a4238ab2df792d986f3d3.pdf?sfvrsn=24bde72d_4
• 6 x increase in renewable energy capacity to 2050, with wind increasing by 10x and solar by 14x
• Primary Zinc Demand increasing 2x to 24mt
18
One of the largest undeveloped zinc deposits globally
• Maiden MRE: 94Mt @ 3.1% Zn+Pb Sulphide
Optimised Pit Constrained
• Globally only 8% of zinc is mined open pit significantly lower mining costs
• Few deposits that have comparable scale –
Globally significant discovery
• 92% of zinc is mined underground –
Substantially higher mining costs
• High potential to discover new MVT and
structurally hosted high-grade underground
deposits in underlying geological formations
• Recent Zn-Pb asset transaction:
• South 32 purchased Hermosa Deposit
Arizona (underground Zn-Pb mine) for
US$1.3bn (A$2.0bn)*
Source
• * South 32 deal of Hermosa: 18-6-18 - https://www.south32.net/docs/default-source/exchange-releases/south32-to-acquire-arizona-mining-in-agreed-all-cash-offera845e39935e04d52bba69904f73c039a.pdf?sfvrsn=d6597986_4
•
911 Metallurgist - https://www.911metallurgist.com/blog/SEDEX-sedimentary-exhalative-ore-deposits
19
Sustainability
• Diversity in the workforce
• Utilising the local community stakeholders and
suppliers to create a positive contribution to the
region
• Recognise and engagement with traditional
owners
• Growing employment opportunities
• Incorporate best practice environmental principles
• Sponsor Murlpirrmarra Connection a not-for-profit
organisation that provide Aboriginal youth in
Wiluna support throughout secondary school
20
Near Term Catalysts at Earaheedy
1.
Drill Program Planned for 2023
▪
Advance the 9km x 3km Newly Discovered ‘Mato Prospect’
▪
Target high-grade feeder structures along the untested 9km
Navajoh Southeast Trend
▪
Target high-grade feeder structures at Chinook, Tonka and Navajoh
and expand on maiden resources
▪
Sonic drilling for beneficiation testing and enhance classification
2.
Flotation optimisation and testing beneficiation techniques in 2023
3.
Scoping Studies to commence in 2023
Photo: Head of Technical Brett Keillor and Chief Geologist
Ben Jones studying Zn-Pb mineralisation
21
Capital raise
22
Capital raising overview
Institutional and Conditional Placement to raise ~A$7.0 million and Security Purchase Plan to raise up to ~A$3.0 million
• An Institutional Placement to raise approximately A$7.0 million capital raising through the issue of 51.9m shares (the
“Placement” or “Offer”). There is potential to upsize the raise, subject to demand achieved during the wall crossing and
bookbuild process
Offer structure
and size
• SPP to eligible shareholders in Australia and New Zealand, under which eligible shareholders have an opportunity to subscribe
for up to A$30,000 of new shares. Eligible applicants may be subject to scale back 1
• SPP to raise up to A$3.0 million. Eligible applicants may be subject to scale back. Rumble may (in its absolute discretion) decide
to increase or decrease the amount to be raised under the SPP or scale back applications at its discretion
• The Placement is not underwritten
Offer price
• Offer price of A$0.135 per new share (“Offer Price”), which represents a:
–
20.6% discount to the last closing price of A$0.170 on 9th August 2023
–
22.1% discount to the 10-day Volume Weighted Average Price (“VWAP”) of A$0.173 to 9 th August 2023
Director
participation
• Directors intend to participate subject to shareholder approval
Ranking
• Shares issued under the Placement and SPP will rank equally in all respects with existing ordinary shares on issue
Sole Lead
Manager
• Wilsons Corporate Finance Limited has been appointed as Sole Lead Manager to the Offer
1. A waiver has been applied to conduct an SPP at a discount greater than 20% of the 5 day VWAP. if not granted the SPP will be conditional on shareholder approval
23
Use of Funds
▪
Monies raised will be used to fund further drilling
to test high-grade zones and continue scoping
studies, including:
•
•
Exploration drilling – discovery and expansion of
near surface deposits
Exploration drilling – targeting high grade MVT’s
at depth
•
Scoping study drilling – DMS/flotation/updated
resource classification
•
Project evaluation – initial scoping studies (incl.
consultants)
•
•
Corporate and technical administration
General working capital
Sources
A$M
Placement
10.0
Uses
A$M
Exploration drilling to expand near surface
deposits and to drill high grade zones at depth
5.0
Scoping studies, including DMS, flotation and
updated resource classification
2.7
Technical and general working capital
2.3
Total
10.0
24
Indicative offer timetable
Event
Trading Halt lifted, announce completion of the Placement
Settlement of new shares issued under the Placement
Allotment and trading of new shares issued under the Placement, SPP offer
booklet dispatched, SPP offer period opens
SPP offer period closes
Settlement and issue of new shares issued under the SPP
Commencement of normal trading of new shares issued under the SPP
EGM to approve issue of director shares
2023
Monday, 14th August
Wednesday, 16th August
Thursday, 17th August
5:00pm (Sydney time) Thursday, 31st August
Thursday, 7th September
Friday, 8th September
Expected to occur in September
Disclaimer: The above dates are indicative only and may change without notice. The Company, in consultation with the Sole Lead Manager, reserves the right to vary the times and dates of the Offer including
to close the Offer early, extend the Offer or to accept late applications, either generally or in particular cases, without notification. Applications received under the Offer are irrevocable and may not be varied or
withdrawn except as required by law.
25
Appendix
26
Building a Team to Deliver Earaheedy
Board of Directors
Shane Sikora
Managing Director
•
•
Founding member of Rumble
appointed Managing Director in
2015
Over 20 years in business
development, public relations,
strategy, project acquisitions,
capital raisings, financial partners
and joint ventures
Peter Venn
Non-Executive Director
•
•
•
Geologist with over 30 years
experience
Exploration and Development of
10+ mining operations across
Africa and Australia
Previously Chief Business
Development Officer at Resolute
Mining Limited
Geoff Jones
Non-Executive Director
•
•
•
Civil engineer with over 30 years
experience
CEO for MACA interquip and ex
MD for GR Engineering Services
Limited (ASX: GNG)
Previously Group Engineer for
Resolute Mining, developed mines
in Australia, Ghana and Tanzania.
Matthew Banks
Non-Executive Director
•
•
•
Founding member of Rumble
Over 20 years specialising in
marketing, public relations and
corporate finance
Executive director of Wildcat
Resources (ASX: WC8)
Michael Smith
Non-Executive Director
•
•
•
Founding member of Rumble
Chartered Accountant with over
25 years experience
Fellow of the Taxation Institute of
Australia, member of ICAA’s
Forensic Accounting Special
Interest Group
Senior Management
Brett Keillor
Head of Technical
•
•
•
Geologist with over 30 years experience
Senior roles and discoveries with Resolute
Mining and Independence Group
Twice recipient of the AMEC Award
“Prospector Of The Year” for the Plutonic
(5.5Moz Au), and Tropicana Gold (7.6M Oz
Au) Deposits
Ben Jones
Chief Geologist
•
•
•
Geologist with over 20 years experience
Senior roles at Evolution Mining,
Independence Group, Jabiru Metals Ltd and
AngloGold Ashanti
Oversaw feasibility of 1Moz of Sunrise Dam
Au Deposit, 7.6Moz Tropicana Au Deposit
and Stockman 14mt Cu-Pb-Zn deposit
Luke Timmermans
Project Manager, Earaheedy
•
•
•
Geologist with over 10 years experience
Senior roles with Gold Fields, Red 5 and
Essential Metals
Co-lead team that increased King of the Hills
Au deposit to over 3Moz and oversaw
feasibility studies and mill construction
Trevor Hart
CFO
•
•
Certified Practicing accountant with over 25
years experience in mining industry serving
on boards and executive management
teams
Recently Develop Global Limited (ASX:
DVP) CFO, instrumental in the company
acquiring the Woodlawn Zinc/Copper mine
and $400m in underground mining services
contracts
27
Metallurgy – Conceptual Process Flowsheet
28
Zinc Uses in Renewables
Accelerated investment and adoption of renewable energy is leading to growing zinc demand
61%
Zinc (Tonnes)
136,000
107%
14,000
162,000
150,000
300
85,000
62,000
66,000
2025*
2030*
24,000
2020
Source: CRU, IRENA
* Projected
Offshore wind
Solar
Storage battery
29
Global Zinc Uses
Overview
•
•
•
•
•
Uses
Zinc is one of the most versatile and essential materials known to
mankind. It is the fourth most used metal in the world behind iron,
aluminum, and copper.
The primary use of zinc is in the galvanizing process, which protects
iron and steel from rusting. Zinc coatings play a key role in public
transportation and infrastructure by extending the life of steel used in
bridge rails and support beams, railway tracks, and public
transportation hubs and terminals.
Additionally, zinc can be alloyed with other metals and used for diecasting into shapes such as door handles, alloyed with copper to
make brass, and alloyed with copper and sometimes other metals to
make some types of bronze, like architectural bronze or commercial
bronze.
Galvanising
5% 2%
9%
Die-cast alloy
11%
Brass and castings
Zn
60%
Oxides and chemicals
13%
Semi-manufacturing
Miscellaneous products
Furthermore, zinc also has applications in energy storage. Zinccarbon batteries were the first commercial dry batteries, providing a
higher energy density at a lower cost than previously available cells.
Source: Natural Resources Canada
Due to its growing role in energy storage and its superior ability to
protect metals against corrosion, zinc remains an essential material
for the future.
30
Analogy: Pering Open Pit Mine, South Africa
•
Pering Zinc-Lead discovery made in 1978 by BHP Billiton
•
70km Southwest of Vryburg, Northwest region of South Africa
•
Mined by a joint venture comprising Shell & BHP Billiton
•
20.5Mt mined at 2.6% Zn & 0.6% Pb over 17 years
•
1.2Mtpa mined from two open pits to 120m
•
Zn prices averaged US$0.60/lb between 1988 – 2005, in
2022 US$1.40/lb
Pering Zn-Pb Open Pit Mine, South Africa
Recent DMS processing enhancements at Pering
•
Successful preconcentration DMS studies were completed on
current reserves (51.3Mt @ 1.1%Zn 0.3%Pb) in 2010 by
Mintek, South Africa for PBM Pty Ltd
•
DMS PEA Study produced:
▪ 3-4 times increase to 4.2% Zn and 1.0% Pb
▪ 80% rejection of waste
Source: Pering Mine economic statement 31st December 2010
31
Earaheedy Basin – New Zinc Province
E69/3464 - 75% Rumble / 25% Zenith (ASX:ZNC) E69/3787& E69/3862 - 100% Rumble
32
Chinook: Copper Potential
• Vertical drill holes targeting
flat lying Zinc-Lead
mineralisation discovered
vertical fault/structure related
copper, with associated
molybdenum, tungsten and
nickel in a newly recognised
polymetallic system
• The polymetallic system is a
separate mineralising
event to the unconformity
and MVT style Zinc-Lead
mineralisation
• Multiple intersections over
2km in a NE trending fault
• Rumble to target Copper
potential with angled holes
33
Earaheedy Project - Regional Copper Deposits
•
Significant
potential for
independent
copper dominant
deposits
throughout the
Earaheedy Project
yet to be drill
targeted and tested
•
Major copper
deposits including
the high-grade
Degrussa Cu-AuAg VMS system
occur in older
Yerrida and Bryah
Basins to the west
(120km) of the
Earaheedy project
34
Rumble’s Pipeline of Projects Strategy
Project Pipeline Strategy
Targeting Valuable Discovery
Project Development
• Generate a pipeline of projects at various
stages of development
• Critically review each project to ensure
capable of world class discoveries
• Negotiate low-cost upfront optionality
• De-risked due to multiple avenues to discovery
• Fast track low-cost drill target generation
• Drill first order targets for discovery
• Technical team discovered multiple deposits
that turned into mines
• Establish a Board and Management
experienced in developing discoveries into
mines
35
Summary of key risks
This section identifies the areas that the directors regard as the major risks associated with an investment in the Company. Investors should be aware that an investment in the Company involves many risks, many of which are outside of the control
of the Company and its directors. There are numerous widespread risks associated with investing in any form of business, with investing in the exploration, development and mining industry, and with investing in the share market generally. There
is also a range of specific risks associated with the Company’s business. The following is a non-exhaustive summary of some of the major risk factors which potential investors need to be aware of.
Risk
Description
The future capital requirements of the Company will depend on many factors including the results of future exploration and development activities and landowner negotiations. The
Company believes its available cash and resources following the Offer should be adequate to fund its obligations in respect of its exploration and development activities and other objectives
as disclosed in this presentation. Additional funding will likely be required to complete further feasibility studies and other development costs for the Earaheedy Project or for other projects.
Additional requirements
for capital
Additional funding may be raised by the Company via the issue of equity or debt or a combination of debt and equity or asset sales. Any additional equity financing will dilute shareholders,
and debt financing, if available, may involve restrictions on financing and operating activities.
If the Company is unable to obtain additional financing as needed, it may be required to reduce the scope of its operations and scale back its programs or enter joint venture arrangements to
reduce expenditure, and this could have a material adverse effect on the Company’s activities. Unfavourable market conditions may adversely affect the Company’s ability to raise additional
funding regardless of the Company’s performance.
Budget risk
The exploration costs of the Company are based on certain assumptions with respect to the mining and timing of exploration. By their nature, these estimates and assumptions are subject to
uncertainties and, accordingly, the actual costs may materially differ from these estimates and assumptions.
Exploration risk
Mineral exploration by its nature is a high-risk activity and there can be no guarantee of exploration success on the Company’s projects. There can be no assurance that exploration of the
tenements, or any other tenements that may be acquired in the future, will result in the discovery of an economic deposit. Even if an apparently viable deposit is identified, there is no
guarantee that it can be economically exploited. Further, exploration involves certain operating hazards, such as failure and or breakdown of equipment, adverse geological, seismic, and
geotechnical conditions, access to water, industrial accidents, labour disputes, adverse weather conditions, pollution and other environmental hazards and risks. The Company’s activities may
also be delayed by shortages in the availability of personnel (see personnel and operating costs risks below) and equipment shortages such as drilling rigs.
The Company has declared its maiden Mineral Resource estimate for the Earaheedy Project. No assurance can be given that the Mineral Resource estimate will result in an Ore Reserve and
be commercially viable and economically exploited.
Resources risk
Mineral Resource estimates are prepared in accordance with the JORC Code (2012 Edition) and are expressions of judgement based on knowledge, experience and industry practice.
Estimates that are valid when made may change significantly when new information becomes available, which could in turn affect the Company’s mining plans and ultimately its financial
performance and value. In addition, commodity price fluctuations, as well as increased production costs or reduced throughput and/or recovery rates, may render Ore Reserves and Mineral
Resources uneconomic and so may materially affect any such estimates.
36
Summary of key risks
This section identifies the areas that the directors regard as the major risks associated with an investment in the Company. Investors should be aware that an investment in the Company involves many risks, many of which are outside of the control
of the Company and its directors. There are numerous widespread risks associated with investing in any form of business, with investing in the exploration, development and mining industry, and with investing in the share market generally. There
is also a range of specific risks associated with the Company’s business. The following is a non-exhaustive summary of some of the major risk factors which potential investors need to be aware of.
Risk
Metallurgical risk
Description
Metal and/or mineral recoveries are dependent upon the metallurgical process, and by its nature contain elements of significant risk such as identifying a metallurgical process through test
work to produce a saleable product, developing an economic process route to produce a saleable product, and changes in mineralogy in the ore deposit can result
Share your feedback
Discover