Zinc Lead Mineralisation Discovered in Drilling
Released
Released
Announcement PDF
17th July 2023
Zinc – Lead mineralisation discovered in RC drilling
along the Sweetwater Trend – Earaheedy Project
Sweetwater Trend RC Drilling– E69/3787 – RTR 100%
•
•
RC drilling, testing an area 7.5km west of the Chinook Deposit, identified from
gravity interpretation and soil sampling, has intersected Zn-Pb sulphide
mineralisation in the first five drill holes at the newly named ‘Mato Prospect’
Geological logging of the drill holes importantly indicates that the Zn-Pb
mineralisation occurs within the Navajoh Unconformity Unit and has similar
geological controls that host the Chinook, Tonka, and Navajoh deposits
•
Further interpretation of the Airborne Gravity Gradiometry (FalconTM) Survey
(AGG) completed in 2022 has highlighted multiple new gravity targets at the
Mato Prospect that could potentially represent high-grade feeders
•
This initial drill testing along with coincident Zn-Pb soil geochemistry has outlined
a potential 9km long x 3km area (Mato Prospect) that could host a significant
new Zn-Pb sulphide deposit and add to the emerging world class base metal
system at Earaheedy
Chinook West EIS Diamond Drilling – E69/3787 – RTR 100%
•
•
A deep diamond drill hole has been completed at Chinook West intersecting a
broad zone of visible sphalerite, galena, and minor chalcopyrite within the
Navajoh Unconformity Unit and underlying Sweetwaters Well Dolomite
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
F +61 8 6555 3981
rumbleresources.com.au
ASX RTR
Executives &
Management
Mr Shane Sikora
Managing Director
Mr Matthew Banks
Non-executive Director
Ongoing geological logging and interpretation of the diamond drill core will assist
Rumble with vectoring towards potential high-grade feeder faults in the
underlying carbonate members and altered basement lithologies below
Rumbles’ Chinook, Tonka and Navajoh deposits
Mr Michael Smith
Non-executive Director
New Tenement Applications Increase Earaheedy Project by 170%
Mr Geoff Jones
Non-executive Director
•
Following a major geological targeting campaign, three new tenement applications
interpreted to have the potential to host high grade MVT deposits have been
lodged increasing the Earaheedy Project tenure by 170% to 1154km2
Mr Peter Venn
Non-executive Director
Mr Brett Keillor
Head of Technical
Mr Steven Wood
Company Secretary
Photo 1 – RC Drilling at Mato Prospect within 100% RTR E69/3787
Rumble Resources Limited (ASX: RTR) (“Rumble” or “the Company”) is pleased to announce it has had early success
from RC drilling within the Sweetwater Trend at the Earaheedy Project, located 110 km northeast of Wiluna, Western
Australia.
Sweetwater Trend RC Drilling – ‘Mato Prospect’ – E69/3787 - RTR 100%
A recently completed regional geology review has provided greater understanding of the geological controls of the
Chinook, Tonka and Navajoh mineralised systems, and highlighted the potential for the Sweetwater Trend to host
economic base metal mineralisation. This detailed study has delivered early exploration success at the newly named
Mato Prospect, with the first five RC drill holes intersecting Zn-Pb mineralisation recognised through portable
X-Ray Fluorescence (“XRF”) and logging – see Photos 1, 2 and 3. Rumble cautions that identification of mineralisation
and reporting of visual results is not considered a proxy or substitute for laboratory analyses. Samples will be
despatched for laboratory analysis and results and will be reported upon receipt of assay results in accordance with
the Company’s continuous disclosure policy.
Geological logging importantly also indicated that the Zn-Pb mineralisation occurs within the Navajoh Unconformity
Unit and the top of the underlying Sweetwaters Well Dolomite, which are also the host lithologies for the Chinook,
Tonka an Navajoh deposits. These three deposits were recently reported as part of a globally significant Inferred
Mineral Resource Estimate of 94Mt @ 3.1% Zn+Pb and 4.1g/t Ag (at a 2% Zn+Pb cut off) – refer to ASX release 19th
April 2023 – See Figure 1. The first five holes within the Mato Prospect were located 7.5km west of the Chinook
Deposit and 3km north of the only two historic holes along the Sweetwater Trend, which intercepted shallow Zn-Pb
mineralisation. The initial drill test results combined with the historic findings and regional interpretation (including soil
geochemistry and geophysics) has outlined an approximate 9km x 3km area that is interpreted to have the
potential to host significant Zn-Pb sulphide deposits at shallow depths – see Figure 1.
Ongoing interpretation of 2022 airborne gravity gradiometry survey (see announcement dated 23rd August 2022) has
also provided the Company with multiple drill targets, which could potentially represent the higher-grade s within an
extensive mineralised envelope at the Mato Prospect. The current RC drilling is being completed on broad 600-800m
spaced traverses at the Mato Prospect, which are designed as a first pass assessment of three key gravity and soil
geochemistry targets. A Heritage Survey request has been submitted for additional drilling, which will allow the
Company to explore the prospective 9km x 3km area and determine if the Mato Prospect hosts large scale
unconformity related Zn-Pb sulphide deposits similar to those already outlined at Chinook, Tonka and Navajoh.
Photo 2 & 3 – EHRC720 sieved Unconformity Unit and sulphide examples. Left: EHRC720 sieved unconformity unit host
lithology chips from 161-164m. Right: EHRC720 Select sieved sulphide bearing samples from interval 162-163m showing
coarse sphalerite, galena, and pyrite. Refer to Table 2 for further observations.
2
Figure 1 – Earaheedy Project – Location of Chinook and Tonka-Navajoh Deposits, new tenure in application covering the prospective basal Iroquois Carbonate-Granite contact
and the newly named Mato Prospect with partial leach geochemistry and recent drilling supporting the 9km prospective area.
3
Chinook West EIS Diamond Drilling - E69/3787 – RTR 100%
Drilling was recently completed on the EIS co-funded diamond drill hole at Chinook West. The EIS scheme is an
initiative by the WA government, under which Rumble is eligible to receive up to $150,000 of the drilling costs
associated with the hole.
The diamond hole, EHD034, intersected further unconformity related Zn-Pb mineralisation, recognised through
portable X-Ray Fluorescence (“XRF”) and visual inspection of significant potential high-grade zones of sphalerite,
galena and pyrite, hosted in the Navajoh Unconformity Unit and the top of the underlying Sweetwaters Well Dolomite
– See Figure 1, photo 4, 5 and Table 2. Rumble cautions that identification of mineralisation and reporting of visual
results is not considered a proxy or substitute for laboratory analyses. Samples will be despatched for laboratory
analysis and results reported will be reported upon receipt of analysis results in accordance with the Company’s
continuous disclosure policy.
The EIS diamond hole represents the first deep diamond drilling by Rumble within the Earaheedy Project and provides
the first continuous stratigraphic hole of the lower Yelma Formation stratigraphy. Ongoing logging of the diamond core
will assist Rumble in understanding the key stratigraphic, geochemical, and structural architecture of the Iroquois
Carbonate stratigraphy and aid in vectoring towards new high-grade feeder fault MVT related mineralisation.
Photo 4 - EHD034 PQ3 core from interval 122-126.5m showing Navajoh Unconformity Unit host and coarse-grained sphalerite,
galena and pyrite mineralisation. See table 2 for further observations.
4
Photo 5 - PQ3 half core collected at 121m from EHD034 showing coarse grained sphalerite, pyrite, and galena hosted
within the Navajoh Unconformity Unit. Note: core diameter is 83mm
New Tenure applications increases Earaheedy Project footprint by 170%
Following a major geological targeting campaign, Rumble recently applied (100% RTR) for three prospective
exploration licences, ELA69/4124, ELA69/4149 and ELA69/4165, which are contiguous with the existing Earaheedy
Project tenure – see Figure 1Error! Reference source not found.. The new tenure applications increase the overall
Earaheedy Project area by 170% to 1154km2.
Significantly, the new tenure applications cover the interpreted basal Iroquois Carbonate Member contact with the
Archean granite/granodiorite basement, proximal to a major interpreted northwest striking structure. This stratigraphic
position is considered favourable to host similar high-grade MVT related mineralisation to that reported at the recent
Iroquois discovery (including 4m @ 27.0% Zn and 19.9g/t Ag) by Strickland Metals (ASX: STK, refer ASX
announcement 17 May 2023).
Initial geological field reconnaissance work of the new applications has been completed utilising existing tracks, and
has confirmed Rumble’s interpretation that the basal Earaheedy Basin contact is further south than previously
interpreted, and has highlighted several high priority areas for geochemical sampling and field mapping once the
tenure is granted.
Navajoh Southeast Trend RC Drilling - E69/3787 100% RTR
Wide spaced RC scoping drilling is being completed to test several high priority gravity targets which are considered
analogous structural zones to known mineralisation at the Tonka and Navajoh deposits within E69/3464. Twentyone (21) drill holes have been completed to date, intersecting wide-spread base metal anomalism and structural
zones considered to be good pathways for mineralised fluids. This drilling has intersected stratigraphic units that
underlie the known mineralised hosts at the Chinook, Tonka and Navajoh deposits, which are considered less
favourable to host economic base metal mineralisation.
A Heritage Survey request has been submitted for additional drilling to extend the drill lines northeast of the
current drilling, where it is expected that drilling will intersect the more favourable upper Sweetwaters Well
Dolomite and Navajoh Unconformity Unit which are the recognised lithologies to the Chinook, Tonka and
Navajoh resources.
Additionally, interpretation of the completed Navajoh Southeast Trend drilling has highlighted the existing heritage
cleared drill hole traverses could also target structurally controlled, high-grade MVT related mineralisation
within the underlying Iroquois Carbonate Member, which has been intercepted at shallower depths than
expected.
5
About the Earaheedy Project
The emerging, world class Earaheedy Zn-Pb-Ag Project is located 110km northeast of Wiluna in Western Australia,
with access to major highways, power (gas pipeline), rail, ports, airports and experienced mining workforce (see Figure
2). The Project includes tenement (E69/3464), which forms the Rumble Resources Ltd 75% / Zenith Minerals Ltd
(ASX: ZNC) 25% Joint Venture (“JV”), E69/3787, E69/3862 and newly added E69/4124, E69/4149 and E69/4165,
which are 100% owned by Rumble (see Figure 1).
Rumble announced a major discovery on 19th April 2021 and 2 years later to the day on 19th April 2023, announced
a globally significant, pit constrained, maiden inferred Mineral Resource Estimate (MRE) of 94Mt @ 3.1% Zn+Pb and
4.1g/t Ag (at a 2% Zn+Pb cutoff) – refer to ASX release 19th April 2023. This maiden MRE confirmed the Earaheedy
Project as one of the largest global zinc sulphide discoveries in the last decade. The strength of the MRE is supported
by a 41mt of higher-grade resources that could be part of a possible early development scenario, and a much larger
462Mt resource that could potentially be upgraded via beneficiation, providing the project with significant future
flexibility.
The Project has exceptional near-term growth potential, with the deposits open in all direction and less than 35% of
the 45km mineralised Unconformity Unit (host to the current resources) effectively drill tested, whilst none of the thick
underlying geologically fertile formations which could potentially host high-grade MVT deposits having been tested.
The sheer scale, optionality, location and extraordinary growth potential of Earaheedy could see the Project stamp
itself as a world class, multi decade asset and play a key role in the future global renewable energy transition.
Figure 2 - The Earaheedy Zn-Pb-Ag-Cu Project location and existing infrastructure within Western Australia
6
Authorisation
This announcement is authorised for release by Shane Sikora, Managing Director of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au.
Previous Drill Results
Drill hole results are ongoing and previous assays have been reported in earlier ASX announcements.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
ASX Release 23/8/2019 – 14 High Priority Targets and New Mineralisation Style
ASX Release 23/1/2020 – Large Scale Zn-Pb-Ag Discoveries at Earaheedy
ASX Release 19/4/2021 – Major Zinc-Lead Discovery at Earaheedy Project, Western Australia
ASX Release 2/6/2021 – Large Scale Zinc-Lead-Silver SEDEX Style System Emerging at Earaheedy
ASX Release 8/7/2021 – Broad Spaced Scout Drilling Has Significantly Increased the Zn-Pb-Ag-Mn footprint at
Earaheedy
ASX Release 23/8/2021 – Earaheedy Zn-Pb-Ag-Mn Project – Exploration Update
ASX Release 13/12/2021 - New Zinc-Lead-Silver Discovery at Earaheedy Project
ASX Release 21/12/2021 – Major Zinc-Lead-Silver-Copper Feeder Fault Intersected
ASX Release 20/1/2022 – Two Key Tenements Granted at Earaheedy Zn-Pb-Ag-Cu Project
ASX Release 31/1/2022 – Shallow High-Grade Zn-Pb Sulphides Intersected at Earaheedy
ASX Release 21/2/2022 – Further High-Grade Zn-Pb Results and Strong Grade Continuity
ASX Release 9/3/2022 – Major Expansion of Zn - Pb Mineralised Footprint at Earaheedy
ASX Release 26/5/2022 - Multiple New High-Grade Zn-Pb Zones defined at Earaheedy
ASX Release 18/7/2022 – Heritage Clearance Confirmed- Sweetwater drilling Commenced
ASX Release 23/08/2022 – Significant Zones of Zn-Pb Sulphides Intersected
ASX Release 30/08/2022 – High grade Zn-Pb drill intercepts at Tonka
ASX Release 29/09/2022 – New 2.2km High Grade Chikamin Feeder Zone extends Chinook
ASX Release 3/11/2022 – High Grade System Discovery Chinook inc. 3.37% Cu 4450g/t Ag
ASX Release 17/11/2022 – Exceptional Metallurgical Results at Earaheedy Project
ASX Release 16/02/2023 – Multiple New High-Grade Feeder Targets Defined
ASX Release 14/03/2023 – Chinook Zn-Pb Prospect expands to 8km strike
ASX Release 19/04/2023 – Maiden Resource Confirms Earaheedy's World Class Potential
ASX Release 03/05/2023 – Heritage Clearance Received for Navajoh Southeast Trend
ASX Release 01/06/2023 – High impact drilling commences at the Earaheedy Project
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was
established with the aim of adding significant value to its current mineral exploration assets and will continue to look at mineral acquisition
opportunities both in Australia and abroad.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on and fairly represents information
compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans is an employee of
Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX market
announcements released on the date noted in the body of the text where that reference appears. The previous market announcements
are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcements. The Company confirms
that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcements. In respect of the previously reported maiden inferred resource at Earaheedy, the Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market announcement, and that all
material assumptions and technical parameters underpinning the estimate in the relevant market announcement continue to apply and
have not materially changed.
7
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production
levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth or other trend projections.
Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which
are beyond the control of Rumble Resources Ltd. Actual results and developments may differ materially from those expressed or implied
by these forward looking statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian
securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in
accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of
Geoscientists.
8
Table 1
Mato, Chinook West and Navajoh
RC Drill Hole Collar Positions – Assays Pending
9
Table 2
Sulphide Estimate % for Holes EHRC716 – EHRC720 and EHD034
10
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc.).
•
Assay sampling methodology and
results pending
•
RC drilling is face sampling bit.
•
Diamond core drilling is completed
with PQ3. Core is oriented if
ground conditions allow
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
•
Assay sampling methodology and
results pending
•
•
Not applicable
Geological logging pending
•
Assay sampling methodology and
results pending
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Commentary
11
Criteria
JORC Code explanation
Commentary
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits
reviews
or
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
•
Assay sampling methodology and
results pending
•
Assay sampling methodology and
results pending
•
All drill hole collar positions
surveyed by hand-held GPS.
•
Subject to results . Assay sampling
methodology and results pending
•
Pending - Geological logging and
Subsequent Interpretation
•
Assay sampling methodology and
results pending
• The results of any audits or reviews of sampling
techniques and data.
•
Assay sampling methodology and
results pending
12
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral
tenement
and
land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
•
The Earaheedy Project comprises of
E69/3464 (75% Rumble and 25%
Zenith Minerals – JV), E69/3787 and
E69/3862 (100% Rumble) and newly
acquired tenure E69/4124, E69/4165
and E69/4149 (all 100% Rumble)
•
All Tenements are in a state of good
standing and have no known
impediments to operate in the area.
Exploration
done
by
other
parties
• Acknowledgment and appraisal of exploration
by other parties.
•
Exploration solely completed by Rumble
Resources
Geology
• Deposit type, geological setting and style of
mineralisation.
•
The Earaheedy Project Deposit type is
considered to be a MVT variant (Irish
Style in part). Mineralisation is
predominantly stratiform sediment
unconformity hosted in both carbonate
and clastic flat lying lithologies.
Drill
hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are
usually Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
Data
aggregatio
n methods
Relationshi
p between
mineralisati
on widths
and
Commentary
13
•
Table 1 – Mato, Chinook West and Navajoh
Southeast RC Drill Hole Collar Positions –
Assays Pending
• Table 2 - Sulphide Estimate % for Holes
EHRC717, EHRC718 and EHD034
•
No Assaying Reported
•
Subject to final Geological Logging
Criteria
JORC Code explanation
intercept
lengths
Diagrams
Commentary
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
•
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
•
Photo 2 & 3 – EHRC720 sieved
Unconformity Unit and sulphide
examples. Left: EHRC720 sieved
unconformity unit host lithology chips
from 161-164m. Right: EHRC720 Select
sieved sulphide bearing samples from
interval 162-163m showing coarse
sphalerite, galena, and pyrite. Refer to Table
2 for further observations.
•
Photo 4 - EHD034 PQ3 core from
interval 122-126.5m showing
Unconformity Unit host and coarsegrained sphalerite, galena and pyrite
mineralisation. See table 2 for further
observations.
•
Photo 4 - EHD034 PQ3 core from
interval 122-126.5m showing Navajoh
Unconformity Unit host and coarsegrained sphalerite, galena and pyrite
mineralisation. See table 2 for further
observations.
•
Figure 2 - The Earaheedy Zn-Pb-Ag-Cu
Project location and existing
infrastructure within Western Australia
Balanced
reporting
•
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
•
Not applicable as no grades being
reported.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•
Airborne Gravity Gradiometry Survey
(Falcon) completed by Xcalibur
Multiphysics
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
•
Further
work
•
•
14
•
•
▪
Area over 400km2
▪
Flight lines – 250m
RC scoping and targeted drilling at the
Mato Prospect
RC Drilling along the Navajoh
Southeast Trend
Aircore Drilling – Iroquois Carbonate
Member
Share your feedback
Discover