Braeside Project Exploration Update
11 July 2017
Highlights
Stage 1 - Soil Sampling Program Update
Rumble Resources Ltd
Suite 9, 36 Ord Street,
West Perth, WA 6005
Phase 1 - 80% completed with assay results expected in 3 weeks
T +61 8 6555 3980
Phase 2 - Remaining 20% and Stage 3 infill soil sampling to start in 3 weeks
F +61 8 6555 3981
Additional Exploration Permits Secured – 100% RTR
rumbleresources.com.au
Large strategic license applications adjoining existing Braeside Project licences
ASX RTR
Rumbles tenement footprint at the Braeside Project area increases by 74%
Prospective strike length is now over 80km’s
Executives &
Management
Braeside Project area expands to 957 sq km’s in the underexplored and highly
prospective base metal region
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide
an update on the first modern systematic exploration program being undertaken at the
Braeside High Grade Zinc – Lead Project (“the Project”), located some 140km east of
Marble Bar (East Pilbara region of Western Australia).
Stage 1 - Regional soil geochemistry (multi-element) - E45/2032
The regional soil geochemistry program covering the entire E45/2032 license is a
staggered 400m by 400m regional surface soil programme primarily designed to
delineate base metal and gold geochemical trends. The regional geochemistry is
anticipated to coincide with the scheduled Stage 2 – Airborne VTEM Survey.
Mr Shane Sikora
Managing Director
Mr Brett Keillor
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Steven Wood
Company Secretary
In addition, significant historic rock chip gold anomalism (up to 13 g/t Au) will also be
tested by the soil geochemistry to identify any gold geochemical trends that may not be
picked up by the Stage 2 VTEM. This stage of exploration is the first step to identifying
the potential for any high-grade gold vein systems at the Project.
Phase 1
80% of the Stage 1 program has been successfully completed and samples collected
in the field are currently at the laboratory being assayed. Results are expected by the
Company in 3 weeks.
Phase 2
The field crew are resupplying and are set to re-commence the Stage 1 program in 3
weeks’ time.
The field crew will complete the remaining 20% of Stage 1 and send the collected
samples to the assay laboratory for testing.
Upon completion of the remaining 20% of Stage 1, the field crew will move onto Stage
3 of the program, being infill soil geochemistry sampling program across any identified
metal trends in Stage 1, and over any conductors identified by the VTEM in Stage 2, as
soon as it is completed and results analysed.
1
Systematic Exploration Process of High Grade Zinc Lead Braeside Project
The Braeside Project consists of multiple high grade Zinc, Lead, Copper and Silver deposits and occurrences
associated within a major NNW fault zone within mafic volcanics and volcaniclastics over a strike of at least
60km’s The poly-metallic mineralisation has not been tested by detailed geophysics, geochemistry and very
limited drilling with only 10 known drill holes. Recent litho-geochemistry completed by Rumble suggests the
mineralisation is associated with sub volcanic rhyolitic porphyry (Koongaling Felsic Volcanics) indicating
potential for a VMS system capable of hosting large base metal deposit.
Rumble’s technical team lead by Technical Director Mr Brett Keillor is systematically exploring the Braeside
Project with the intention to generate first order VMS feeder pipe targets using proven, modern exploration
techniques.
Rumbles exploration program is the first modern systematic exploration program being undertaken at the
Braeside High Grade Zinc – Lead Project.
Rumble is fast tracking exploration as per the stages outlined below. The first 4 stages are anticipated to be
completed over the coming months, and the Company expects to complete the stage 5 drill testing of any first
order VMS targets identified prior to the end of 2017.
Rumble is fully funded to complete all 5 stages of exploration.
Stage
Exploration Activity
Progress
Stage 1
Regional soil geochemistry (multi-element) Phase 1 - 80% completed
to cover Braeside Project Area
Phase 2 – Remaining 20% to start in
3 weeks
Stage 2
Fly Airborne VTEM
Stage 3
Infill geochemistry over any gold metal Subsequent to Stage 1
trends.
Infill geochemistry over any conductors Subsequent to VTEM
generated by VTEM in Stage 2 to rank key
drill targets
Stage 4
Ground TEM surveys over the highest
ranked conductors (drill targets) to further
delineate drill targets
Stage 5
Drill test any conductive plates identified in Subsequent to Stage 4
order of ranking
Agreement signed, VTEM Scheduled
for July
Subsequent to infill geochemistry
New Strategic License Applications – 100% Rumble
The new exploration license applications outlined in Image 1 on page 3 increases the Braeside Project area to
957 square kilometres, and expands Rumble’s footprint at the Project area by 74%. Rumble secured these
licenses for nil consideration, enabling Rumble to utilise its cash for high impact exploration.
The new applications have had minimal base metal exploration, with the initial technical review identifying the
Koongaling Felsic and Kyleena Andesite Basalts to be highly prospective for base metal deposits.
The new applications extend the strike to over 80kms within the Braeside Fault Fracture system which contains
identified high grade poly-metallic mineralisation.
2
Image 1: Braeside Regional Project Location, Regional Geology and Tenements
-
Ends -
About Rumble Resources Ltd
Rumble Resources Ltd is an Australian based exploration company, officially admitted to the ASX on the 1st July 2011. Rumble was
established with the aim of adding significant value to its current gold and base metal assets and will continue to look at mineral
acquisition opportunities both in Australia and abroad.
Forward Looking and Cautionary Statement
The information in this report that relates to historic exploration results was collected from DMP reports submitted by government
agencies and previous explorers. Rumble has not completed the historical data or the verification process. As sufficient work has not yet
been done to verify the historical exploration results, investors are cautioned against placing undue reliance on them.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Brett Keillor, who is a Member of
the Australasian Institute of Mining & Metallurgy and the Australian Institute of Geoscientists. Mr Keillor is an employee of Rumble
Resources Limited. Mr Keillor has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mapleson consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
3
Share your feedback
Discover