ASX ANNOUNCEMENT
11 August 2025
Maiden Tungsten Resource of 13,200 tonnes of WO3 highlights
the exceptional potential of the Western Queen Project
Key points
•
The maiden Western Queen Tungsten Mineral Resource Estimate is 4.31Mt @ 0.31% WO3 for 13.2kt
WO3 at a 0.1% WO3 cut-off.
•
Open and continuous high-grade cores within the global mineral resource estimate total 1.44Mt @
0.51% WO3 for 7.4kt WO3 at a 0.3% WO3 cut off.
•
Tungsten skarn mineralisation at Western Queen occurs as a series of lodes subparallel to the highgrade gold resource (3.72Mt @ 3.1g/t Au for 370,000oz 1) and has been identified over a 1500m strike
between the Western Queen South and Central open pits.
•
Tungsten mineralisation remains open along strike and at depth within the granted Western Queen
mining leases.
•
Preliminary metallurgical testwork has indicated that a meaningful revenue stream could potentially be
generated from the tungsten bearing material.
•
The majority of the maiden tungsten MRE is situated at the Western Queen South Deposit, where
approvals for the proposed open pit mining of the 2.32Mt @ 2.66g/t Au for 198,900 oz1 gold resource
have been submitted to the DMPE.
•
Recent geological interpretation has identified multiple additional high priority target areas prospective
for tungsten endoskarn type mineralisation across the broader Western Queen Project, with a
reconnaissance field program underway.
Peter Harold, Managing Director and CEO commented:
“This is a fantastic outcome. To have reported a maiden tungsten resource of over 13,000 tonnes of tungsten
trioxide demonstrates that Western Queen is more than just a high-grade gold project that we recently upgraded
to 370,000 ounces. Given the potential to grow the tungsten resources we could be sitting on a major tungsten
project at Western Queen in addition to the near-term high-grade gold production we are progressing.
I would like to congratulate the geological team for their vision and diligence in identifying and completing this
maiden resource, in under 12 months from first identifying the mineralisation, at a time when tungsten is such a
sort after mineral given its strategic importance. Tungsten is a critical mineral due to its unique properties such as
high melting point, hardness, and density, which make it vital in the aerospace, defence and electronics application.
China currently produces over 85% of the world’s tungsten ore and there is now a strong push to reduce the reliance
on Chinese sourced tungsten.
We look forward to seeing the tungsten resources grow at Western Queen and the results of the metallurgical
testwork as we look to understand the quantum of revenue that could potentially be generated by exploiting these
new tungsten resources.”
1
Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au” – refer to
Appendix 1, Table 2 for a breakdown of resources by deposit area.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
1
Western Queen Maiden Tungsten Resource
Rumble Resources Limited (ASX: RTR) (“Rumble” or the “Company”) is pleased to announce the maiden tungsten
Mineral Resource Estimate (MRE) at the Western Queen Project (Western Queen” or the “Project”). The MRE is
4.31Mt @ 0.31% WO3 for 13.2Kt WO3 at a 0.1% WO3 cut-off and contains a higher-grade portion of 1.44Mt @
0.51% WO3 for 7.4Kt WO3 at 0.3% WO3 cut off (see Figure 1). The MRE is classified as Inferred Resources and is
reported in accordance with the Australasian Code of Reporting of Identified Mineral Resources and Ore Reserves
(JORC Code 2012), and all the resources are located within granted Mining Leases M59/208 and M59/45. Refer
to Table 1 for breakdown of Inferred Resources by deposit area at Western Queen.
The maiden MRE was prepared by Ashmore Advisory Pty Limited (Ashmore). Ashmore undertook the MRE using
Ordinary Kriging estimation methodology constrained by interpreted domain wireframes produced by Company
Geologists and was depleted for all resources contained inside of existing open pit and underground mining voids
prior to reporting. The Western Queen Resource is reported at a 0.1% WO3 cut-off.
Figure 1 – Maiden Western Queen Tungsten MRE showing extents of WO3 lodes and diagrammatic
contoured block grades displaying emerging high-grade trends and select significant WO3 intercepts
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
2
Geological investigations and petrographic studies have confirmed tungsten mineralisation at Western Queen
represents an early prograde endoskarn mineralisation event which predates orogenic gold mineralisation. Up
to 18 individual tungsten skarn lodes have been identified over a 1500m strike between the Western Queen
South and Central open pits, and are spatially adjacent, and sub-parallel to, the high-grade gold lodes which
comprise the recently updated gold MRE of 3.72Mt @ 3.1g/t Au for a total of 370,000 oz Au 2
Importantly, the extent of tungsten mineralisation observed to date at Western Queen has been sourced entirely
from previously completed exploration drilling targeting gold mineralisation and no dedicated drilling has been
undertaken at Western Queen targeting tungsten. Petrographic studies have also confirmed that the observed
tungsten mineralisation observed to date represents a very distal skarn mineralisation environment.
On this basis, Company geologists have undertaken a comprehensive technical review and targeting exercise to
understand the broader tungsten mineralisation potential at Western Queen. This review, combined with an
improved understanding of the tungsten proximal geochemical signature through interpretation of detailed
geochemical data, has identified multiple high priority targets that extend over a 5km X 2.5km area at the
Western Queen Project prospective for tungsten skarn type mineralisation (refer to Figure 2). These targets are
defined by tungsten and coincident pathfinder (Ba and Sn) anomalism in geochemical and rockchip sampling
completed by the Company in 2024. Rumble has commenced a field program to assess the potential of each of
these targets, the results of which will inform future exploration activities targeting tungsten at Western Queen.
Preliminary metallurgical testwork has indicated a meaningful revenue stream could potentially be generated
from the tungsten bearing material. This needs to be verified by detailed metallurgical testing. A bulk sample of
the tungsten bearing (scheelite) material is being prepared for further metallurgical testing by Mineral
Technologies, who specialise in mineral separation solutions and equipment supply. The aim of this program is
to develop a grade versus recovery curve for the scheelite material to be used to determine the quantum of the
tungsten revenue stream that could be generated.
2 Refer to Rumble ASX release 23 July 2025 “Significant Increase to Western Queen Gold Resources 370koz @ 3.1g/t Au” – refer to Appendix
1, Table 2 for a breakdown of resources by deposit area.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
3
Figure 2 – High-priority tungsten and coincident pathfinder element targets and extent of tungsten
mineralised lodes interpreted from existing gold drilling at the Western Queen Project.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
4
Western Queen Tungsten Mineral Resources Summary
The tungsten deposits at Western Queen have been interpreted as a prograde scheelite-clinopyroxene bearing
endoskarn mineralisation system which predates orogenic gold mineralisation. Tungsten mineralisation, similar
to the gold mineralisation, appears to be broadly structurally controlled along the Western Queen Shear Zone
(WQSZ) that strikes NE-SW and dips steeply (70o to the west). Structural logging and ongoing interpretation
indicate that high-grade tungsten mineralisation trends broadly mirror the shallow south plunges (30-40o)
observed in gold mineralisation (see Figure 1). The maiden tungsten MRE is classified as Inferred with technical
studies and interpretation ongoing. The updated Mineral Resources have been constrained by mineralisation
domains built using Leapfrog software based on interval selection interpretation mineralisation domain
wireframing criteria used for this MRE update was:
•
Composite tungsten grade interval >0.1% WO3;
•
Maximum of 2m internal waste; and
•
Zones extended up and down-dip halfway to the nearest unmineralised hole in well-drilled areas, and
no more than 60m in sparsely drilled areas.
Table 1 – Western Queen August 2025 Tungsten Mineral Resource Estimate (0.1% WO3 Cut-off)
Prospect
WQC
Princess
WQS
Total
Tonnage
kt
790
810
2,710
4,310
Inferred Mineral Resource
WO3
%
0.27
0.22
0.34
0.31
WO3
t
2,200
1,800
9,200
13,200
Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of Ashmore
Advisory and a Member of the AIG. Mr. Searle has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity that he has undertaken to qualify as a Competent Person as
defined in the JORC Code (2012).
All Mineral Resources figures reported in the table above represent estimates as at August 2025. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location,
shape and continuity of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
History
The Western Queen Project has undergone numerous ownership changes in the past. The most recent transfer
of ownership was from Ramelius Resources Limited’s wholly-owned subsidiary Mt Magnet Gold Pty Ltd, to
Rumble in August 2019.
The oldest known historical gold production from Western Queen was between 1936-1937, when 9,991 tonnes
at an average grade of 17.3 g/t Au for 5,550oz Au was mined. Subsequently the Western Queen Central Mine
produced 660,000 tonnes at 8.9 g/t Au for 188,800oz Au. The Western Queen South Open Pit was most recently
mined by Ramelius, with total production of 220,000 tonnes at 3.6 g/t Au for 25,000oz Au. Scheelite, the
tungsten mineral observed at Western Queen has long been recognised as spatially associated with gold
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
5
mineralisation, however tungsten mineralisation has never been assessed as potentially economically
extractable at Western Queen.
Mineral Title Status
There are two contiguous mining leases (M59/45 and M59/208, total area 9.8 km2) within the project area and
both are 100% owned by Rumble. Both mining leases are in good standing. In addition, there are two
exploration tenements (E20/0967 and ELA59/2816) over the area, covering the northern and southern strike
extent of the mineralised Western Queen Shear Zone (WQSZ) in the Warda Warra greenstone belt.
Geology and Geological Interpretation
The Western Queen tenements lie within the Archaean Warda Warra Greenstone Belt, a north trending enclave
within the Murchison Province of the Yilgarn Craton.
The Western Queen and Western Queen South deposits are within the Kylie Mining Group and are the largest
known deposits within the Warda Warra Greenstone Belt. The Warda Warra Greenstone Belt is approximately
35km in length, and at the southern end near the Western Queen deposit it is 2km wide, while at the northern
end it is up to 7km wide. The north striking and steeply west dipping Warda Warra Greenstone Belt is a layered
sequence that has been metamorphosed to amphibolite grade and is enveloped by recrystallised granitoids.
At Western Queen, the geology is steep westerly dipping and comprises intercalated sheared amphibolites of
mafic to ultramafic composition with thin iron formation horizons, komatiitic basalt, dolerite sills, and talc
chlorite schists. Later dolerite and pegmatitic felsic intrusives cut across the amphibolites and gold
mineralisation.
Tungsten mineralisation is associated with a scheelite-clinopyroxene bearing endoskarn mineralisation system,
hosted within both mafic amphibolites and ultramafic lithofacies. Depth of complete oxidation is approximately
30m to 60m with depth to fresh rock approximately 45 to 80m. A zone of lacustrine sediments up to 45m thick
overlies the WQS deposit.
Sampling and Sub-Sampling Techniques
Tungsten assaying was not previously conducted at Western Queen by historical operators, with the Company
completing resampling of visible scheelite intersections in the historical diamond core. Since 2019, RC drilling
by Rumble was used to obtain 1 m samples with a cone splitter at the rig to produce a 1.5 – 2.5kg sample. The
samples were transported to the laboratory (ALS Perth) for tungsten analysis. Diamond drilling completed by
Rumble was sawn as ½ core (for NQ) and sampled.
Drilling Techniques
The Western Queen deposit has been sampled using Rotary Air Blast (RAB), Air Core (AC), Reverse Circulation
(RC) and Diamond (DD) drilling over numerous campaigns by several operators. The RC drilling for resource
definition and grade control used a nominal 5½ inch diameter face sampling hammer. AC drilling used a
conventional 3½ inch face sampling blade to refusal or a 4½ inch face sampling hammer to a nominal depth.
The diamond drilling was undertaken as diamond tails to the RC holes or diamond core from surface, using NQ2
sized equipment. RAB and AC drilling has been excluded from the estimate.
RC sample recovery was visually assessed and recorded where significantly reduced. Very little sample loss was
noted. The diamond drilling recovery was excellent with very little or no core loss identified. RC samples were
visually checked for recovery, moisture and contamination. A cyclone and splitter were used to provide a
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
6
uniform sample and these were routinely cleaned. DD drilling was undertaken and the core measured and
orientated to determine recovery, which was generally 100%.
Classification Criteria
The Western Queen Tungsten Mineral Resource was classified as Inferred Mineral Resource based on data
quality, sample spacing, and lode continuity and was assigned to areas up to a maximum of 80m from drilling.
Tungsten assaying was not previously conducted at Western Queen, so Rumble completed resampling of visible
scheelite intersections in the historical diamond core. Consequently, sample density is lower compared to gold
sampling and is confined to Rumble drilling and historical diamond core with visible scheelite mineralisation.
Sample Analysis Method
Tungsten assaying was not previously conducted at Western Queen by historical operators, with the Company
completing resampling of visible scheelite intersections in the historical diamond core. Tungsten laboratory
analysis was via a complete digest through lithium borate fusion with an ICP-MS finish (ME-MS85 with
overrange determination by ME-MS85h). High grade samples that could not be determined by this method
underwent a lithium metaborate - lithium tetraborate fusion with an XRF finish (ME-XRF15b and ME-XRF15c).
Estimation Methodology
The mineralisation was constrained by wireframes prepared using a 0.1% WO3 cut-off grade, which were
generated in Leapfrog Software by Rumble geologists. Following a review of the population histograms and log
probability plots, it was determined that the application of high-grade cuts was not required.
The block model parent block dimensions used were 5m NS by 1m EW by 1m vertical with sub-cells of 0.625m
by 0.5m by 0.5m and the model was rotated on a bearing of 020° to match the approximate strike of the
mineralisation. The parent block size dimension was selected on the results obtained from Kriging
Neighbourhood Analysis, as well as input from the mining engineer to assist with underground optimisation
processes.
The Mineral Resource block model was created and estimated in Surpac using Ordinary Kriging (OK) grade
interpolation. An orientated ‘ellipsoid’ search was used to select data and adjusted to account for the variations
in lode orientations, however all other parameters were taken from the variography. Up to four passes were
used for each domain. First pass had a range of 30m, with a minimum of six samples. For the second pass, the
range was extended to 60m, with a minimum of four samples. For the third pass, the range was extended to
150m, with a minimum of two samples. A final pass was used to estimate the remaining unestimated blocks. A
maximum of 16 samples was used for all passes, with a maximum of six samples per hole.
Bulk densities used for the Western Queen Tungsten Mineral Resource estimate was based on 171
measurements completed by Rumble on rock core samples using the water displacement method, as well as
known values from historical mining. The following bulk densities as tonnes per cubic metre (t/m3) were used:
•
Oxide: 1.9t/m3
•
Transition: 2.56t/m3
•
Fresh: 2.87t/m3
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
7
Cut-off Grade
The Mineral Resource has been reported at 0.1% WO3 cut-off, in anticipation of the material being potentially
mined with open pit and underground methods. The reporting cut-off parameters were selected based on
assumed economic cut-off grades for the Project.
Mining and Metallurgical Methods and Parameters
The deposit has previously been mined for gold using selective open pit mining methods and small-scale
underground development. Preliminary metallurgical test work has indicated a meaningful revenue stream
could potentially be generated from the tungsten bearing material. This needs to be verified by detailed
metallurgical test work. A bulk sample of the tungsten bearing (scheelite) material is being prepared for further
metallurgical testing.
Authorisation
This announcement is authorised for release by the Board of the Company.
-EndsFor further information visit rumbleresources.com.au or contact info@rumbleresources.com.au
Peter Harold
Peter Venn
Trevor Hart
Managing Director & CEO
Technical Director
Chief Financial Officer
Rumble Resources Limited
Rumble Resources Limited
Rumble Resources Limited
About Rumble
Rumble Resources Ltd is an Australian based exploration company, listed on the ASX in July 2011. Rumble was
established with the aim of adding significant value to its selected mineral exploration assets and to search for
suitable mineral acquisition opportunities in Western Australia.
Rumble has a unique suite of resources projects including the Western Queen Gold Project which is being
developed to deliver near term cash flow from the existing resources and is aiming for resource growth through
future exploration success. In addition, the discovery of the Earaheedy Zn-Pb-Ag Project has demonstrated the
capabilities of the exploration team to find world class orebodies.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
8
Previous ASX Announcements – Western Queen Gold Project
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
6/8/2019 – Option to Acquire High-Grade Western Queen Gold Project
4/11/2019 – Western Queen Gold Project – Multiple Targets to be Drilled
22/11/2019 – Drilling Commenced at Western Queen Gold Project
17/2/2020 – High Grade Gold Discovery at the Western Queen Project
25/2/2020 – Drilling Commenced at the Western Queen Gold Project
14/4/2020 – Exploration Update – Three Drill Programmes Completed
20/5/2020 – Drilling Identifies Multiple High-Grade Gold Shoots
9/6/2020 – Major Drill Programme to Commence – Western Queen Gold Project
24/6/2020 – Major Drill Programme Commenced at The Western Queen Gold Project
16/7/2020 – 500% Increase in Landholding Extends Western Queen Project
31/8/2020 – Option Exercised to Acquire the Western Queen Gold Project
10/9/2020 – 100% Acquisition of Western Queen Gold Project Complete
4/11/2020 – Discovery High-Grade Gold Shoots and Shear Zone Extension
3/2/2021 – High-Grade Gold Shoots at Western Queen South Deposit
2/8/2021 – Western Queen Resource Upgrade to 163,000 oz
29/4/2024 – Drilling to test High-Grade Gold Zones at Western Queen
29/5/2024 – Western Queen Drilling Commenced
16/7/2024 – Western Queen Drilling Update
6/8/2024 – High-Grade Tungsten Discovery at Western Queen
2/9/2024 – Tungsten Discovery at Western Queen Confirmed
27/09/2024 - Rumble welcomes new Strategic Investor
15/10/2024 – Western Queen Gold Resources increased 76% to 287k oz
20/11/2024 – Commencement of Drilling at Western Queen
28/11/2024 – Development of Western Queen Gold Project
11/12/2024 – High-Grade Tungsten Assays Highlights Resource Potential at WQ
17/2/2025 – High-grade Gold and Tungsten Assays from Phase 1 Drilling
28/2/2025 – Development of Western Queen Gold Project.
4/2/2025 – High Grade Tungsten from Historical Core
16/4/2025 – Western Queen - Mine Development and Exploration Update
30/5/2025 – Western Queen Gold Mine Development
4/6/2025 – High-grade Gold and Tungsten at Western Queen Project
23/7/2025 – Significant Increase to Western Queen Gold Resources.
4/8/2025 – High-Grade Tungsten Assays at Western Queen.
Competent Persons Statement
The information in this release that relates to Mineral Resources is based on information compiled by Mr Shaun Searle who
is a Member of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and
independent consultant to Rumble Resources Limited. Mr Searle has sufficient experience, which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Searle consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
The information in this report that relates to exploration data, geological Interpretation and sampling information informing
the Mineral Resource Estimate and potential for eventual economic extraction of the Mineral Resources is based on and fairly
represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr
Timmermans is an employee of Rumble Resources Limited. Mr Timmermans has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr Timmermans consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
9
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the Company’s ASX
market announcements released on the date noted in the body of the text where that reference appears. The previous market
announcements are available to view on the Company's website or on the ASX website (www. asx.com.au). The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources,
production levels and rates, costs, prices, future performance or potential growth of Rumble Resources Ltd, industry growth
or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and
uncertainties, as well as other factors which are beyond the control of Rumble Resources Ltd. Actual results and
developments may differ materially from those expressed or implied by these forward-looking statements depending on a
variety of factors. Nothing in this report should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which
may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore
reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be,
prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and
Australian Institute of Geoscientists.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
10
Appendix 1
Table 2 – Mineral Resource Estimate Tabulation for the Western Queen Project broken down by Resource Area and split of
Indicated and Inferred Resources for reported Open Pit and Underground economic cut-offs.
Prospect
Cranes
Duke
WQC
Princess
WQS
Total
Tonnage
kt
Indicated
Au
g/t
Au
Oz
30
250
100
830
1,210
7.2
7.2
1.9
3.0
3.8
6,900
56,600
5,900
78,600
148,000
Tonnage
kt
70
4
560
380
1,490
2,510
Inferred
Au
Au
g/t
Oz
1.4
3,300
6.4
800
3.8
67,300
2.5
30,300
2.5
120,200
2.8
222,000
Tonnage
kt
70
34
800
480
2,320
3,720
Total
Au
g/t
1.4
7.1
4.8
2.3
2.7
3.1
Au
Oz
3,300
7,700
124,000
36,200
198,900
370,000
The Statement of Estimates of Mineral Resources has been compiled by Mr. Shaun Searle who is a Director of Ashmore
Advisory and a Member of the AIG. Mr. Searle has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the
JORC Code (2012).
All Mineral Resources figures reported in the table above represent estimates as at July 2025. Mineral Resource estimates are
not precise calculations, being dependent on the interpretation of limited information on the location, shape and continuity
of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Cranes Mineral Resource figures are derived from the 2024 Mineral Resource estimate.
Open Pit optimisations and preliminary underground Mining Shape Optimisations (MSO) have shown that a large proportion
of the resource has the potential to be mined economically, and further mining studies are warranted to further progress the
project. Mineral Resources that are not Ore Reserves have not demonstrated economic viability at this point. The estimate
of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political,
marketing, or other relevant issues.
Rumble Resources Limited
ASX: RTR
ABN 74 148 214 260
rumbleresources.com.au
T: +61 8 6555 3980
E: info@rumbleresources.com.au
Head Office
Level 1, 16 Ord St
West Perth, Western Australia 6005
11
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
Commentary
Nature and quality of sampling (eg cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting
the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosu