Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 October 2024
September 2024 Quarterly Report
Rumble Resources Ltd (ASX: RTR) (“Rumble” or “the Company”) is pleased to provide an
update on the Company’s activities during the September 2024 Quarter, focusing on
discovery and growing the gold resources at the Western Queen Project, advancing the
emerging world class Earaheedy Zinc-Lead-Silver Project, and progressing the other
exploration projects in the portfolio. Highlights for the Quarter include:
Western Queen – Gold
Rumble Resources Ltd
Level 1, 16 Ord Street,
West Perth, WA 6005
T +61 8 6555 3980
•
The Western Queen Gold Mineral Resource Estimate (MRE) was upgraded to
4.42Mt @ 2.02g/t for 286,600oz representing a 123,200oz (or 76%) increase in the
Indicated and Inferred Resources compared to the August 2021 MRE
•
Indicated resources increased by 142% and represent 56% of the global MRE
rumbleresources.com.au
•
The Western Queen MRE occurs within existing 100% RTR controlled Mining
Licences, M59/208 and M59/45, located within a 100km radius of three gold
processing facilities
ASX RTR
•
Historical mining has produced 880,000 tonnes at 7.6g/t Au for 215,000oz
•
Mineralisation remains open along strike and at depth along the Western Queen
Shear Zone hosting the mineralisation with potential for additional high-grade
discoveries
•
Further drilling aimed at significantly increasing resources will commence in early
November with up to 20,000m of RC and diamond drilling planned
•
Discussions are well advanced with a potential mine development partner
Western Queen – Tungsten
•
Recent diamond drilling discovered exceptionally high-grade tungsten (scheelite)
mineralisation within the Western Queen gold system
•
Drill-hole WQDD013 returned:
o 4m @ 4.58% WO3, 0.72 g/t Au from 174.85m, including
o 2.05m @ 8.71% WO3, 1.38 g/t Au from 176.85m, and
o 0.65m @ 18.35% WO3, 2.97 g/t Au from 176.85m
•
Strong continuous tungsten anomaly outlined over 2km from drillhole pXRF data
parallels the Western Queen Shear and known high grade gold mineralisation
•
Tungsten assays received from selected drill pulp samples of an initial seven holes
drilled in 2021 have confirmed a potentially significant high-grade tungsten discovery
at Western Queen
•
Analysis of historical drilling including RC drill pulps is ongoing and given the
substantial diamond core library there is potentially sufficient data to classify an initial
resource estimate
•
Tungsten is a critical and strategic metal given its relative scarcity, supply risk,
defence applications and limited substitution options
Earaheedy Zn-Pb-Ag-Cu Project
•
Metallurgical test work on the Chinook Deposit area is currently being finalised with
results anticipated to be reported in the December Quarter
•
An internal scoping study will commence once the results of the metallurgical test
work have been reported
Corporate
Fund Raising
•
$1 million placement at 4 cent per share to strategic investor Bain Resource Holdings
Cash Balance
•
Company had $1.6 million in cash at the end of the Quarter
F +61 8 6555 3981
Executives &
Management
Mr Peter Harold
Managing Director & CEO
Mr Peter Venn
Technical Director
Mr Matthew Banks
Non-executive Director
Mr Michael Smith
Non-executive Director
Mr Geoff Jones
Non-executive Director
Mr Brett Keillor
Technical Consultant
Mr Steven Wood
Joint Company Secretary
Trevor Hart
CFO & Joint Company
Secretary
1. EXPLORATION AND DEVELOPMENT ACTIVITIES
Rumble has a significantly advanced exploration portfolio in Western Australia hosting a mixture of gold, base
metals and specialty metals.
Figure 1 – Location of the Company’s Projects
Rumble Resources Limited - ASX: RTR
Page | 2
1.1 Western Queen Gold-Tungsten Project, Mt Magnet, Western Australia
Figure 2 – Western Queen mining licences and proximity to existing mills
Western Queen Gold Resource Upgrade
During the Quarter, the Company reported the updated Mineral Resource Estimate (MRE) of 4.42Mt @ 2.02 g/t Au for
a total of 286,600 ounces for the Western Queen Project. The MRE includes Indicated and Inferred Resource
classifications in accordance with the Australasian Code of Reporting of Identified Mineral Resources and Ore Reserves
(JORC Code 2012), with all the resources located within granted Mining Leases. Indicated Resources are 2.39Mt @
2.11g/t Au for 163,800 ounces1, which is a 142% increase compared to the August 2021 MRE, and represents 56%
of the total MRE. The combined open cut and underground resource for the Western Queen Gold Project is presented
in Table 1.
Diamond drilling completed by the Company in June 2024 provided further geological understanding of the controls on
the mineralised system and prompted a comprehensive geological review of the Western Queen Project. This review
led to a lithostructural reinterpretation that incorporated new zones of mineralisation that were not previously wireframed
as part of the resource modelling exercise in 2021, as well as the extensions provided by the recent drill programs.
1.
Refer ASX release dated 15 October 2024 titled “Western Queen Gold Resources increased 76% to 287koz @ 2.02g/t”
Rumble Resources Limited - ASX: RTR
Page | 3
Table 1: Mineral Resource Estimate Tabulation for the Western Queen Project
Prospect
Cranes
Duke
WQC
Princess
WQS
Total
Tonnage
kt
Indicated
Au
g/t
Au
Ounces
50
590
180
1,560
2,390
4.23
3.11
0.92
1.79
2.11
7,000
59,300
5,200
90,300
161,800
Tonnage
kt
70
70
630
680
580
2,030
Inferred
Au
g/t
1.39
2.70
2.54
1.35
1.86
1.91
Au
Ounces
3,300
5,700
51,700
29,300
34,600
124,700
Tonnage
kt
70
120
1,230
850
2,140
4,420
Total
Au
g/t
1.39
3.37
2.81
1.26
1.81
2.02
Au
Ounces
3,300
12,800
111,000
34,600
124,900
286,600
Notes: Totals may differ due to rounding, Mineral Resources reported on a dry in-situ basis.
All Mineral Resources figures reported in the table above represent estimates at October, 2024. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape
and continuity of the occurrence and on the available sampling results.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
The pit optimisations have shown that a large proportion of the resource has the potential to be mined economically, and
further mining studies are warranted to further progress the project. Mineral Resources that are not Ore Reserves have
not demonstrated economic viability at this point. The estimate of Mineral Resources may be materially affected by
environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
Table 2 – Grade-Tonnage breakdown of the Western Queen Resource for varying economic cut-off grades
Total Resource above
245mRL
Tonnage
Au
Au
(t)
(g/t)
Ounces
Total Resource below
245mRL
Tonnage
Au
Au
(t)
(g/t) Ounces
0.0
3,621,463
1.31
152,208
3,810,757
1.69
207,004
0.3
3,501,177
1.34
151,271
3,714,350
1.73
206,355
0.5
2,915,699
1.53
143,557
3,379,240
1.86
202,105
0.7
2,285,138
1.79
131,447
3,073,401
1.99
196,241
1.0
1,526,057
2.26
111,044
2,344,144
2.34
176,104
1.2
1,209,625
2.57
99,898
1,915,774
2.61
160,903
1.5
856,578
3.08
84,786
1,499,678
2.97
143,001
1.8
651,755
3.53
73,923
1,115,797
3.42
122,668
2.0
552,937
3.82
67,918
910,560
3.76
110,168
2.5
408,930
4.38
57,564
529,827
4.89
83,299
Cut-off
Grade
(g/t)
Note: The Western Queen Resource has been reported at a 0.5g/t cut off grade for Resources above the 245mRL and
1.5g/t for Resources below the 245mRL. The corresponding reported numbers are highlighted in the table..
The updated Western Queen Project Mineral Resource Statement includes all RC and diamond drilling results from July
2024 and the new wireframes modelled and supplied by Rumble, whilst the MRE was prepared by Ashmore Advisory
Pty Limited (Ashmore). Ashmore undertook the MRE using Ordinary Kriging estimation methodology constrained by
interpreted domain wireframes and was depleted for all resources contained inside of existing open pit and underground
mining voids prior to reporting. The Western Queen Resource is reported at a 0.5g/t Au cut-off for open cut resources
above the 245mRL level and 1.5g/t Au cut-off below the 245mRL level for underground resources. The 245mRL level
was chosen as it is the base level of the Western Queen Central Open Pit, which has historical reconciled production of
660kt at 8.9g/t Au for 190,000 ounces.
The high-grade deposits remain open at depth (see Figure 3) and the Company believes there is significant potential for
new discoveries at the Western Queen Gold Project. Importantly, there are opportunities for new resources to be
discovered along strike to the north and to the south along the recently reinterpreted position of the Western Queen
Shear Zone (WQSZ). Figure 3 shows significant drillhole intercepts and the recently inferred position of the WQSZ that
remains largely untested.
Rumble Resources Limited - ASX: RTR
Page | 4
Figure 3 - Western Queen Gold Project – previous mining, previous drilling and near deposit exploration potential
The Western Queen Project is located within a 100km radius of three gold processing plants (refer to Figure 2). The
closest plant is Dalgaranga (48km by road from Western Queen) which has a capacity of 2.5 Mtpa (currently on care
and maintenance). The Checkers plant (Mt Magnet) has a capacity of 1.9 Mtpa and the Tuckabianna plant has a capacity
of 1.2 Mtpa. These two facilities could provide the possibility for a near-term toll treating option.
Proposed Exploration Program
The Company is prioritising a significant drill program to commence in early November at Western Queen. The
program will include up to 15,000m of reverse circulation (RC) and 5,000m of diamond core drilling. Discussions
with selected drilling contractors indicate that a portion of the program could be completed under a “drill for equity”
arrangement. Importantly, the program will target both the high-grade gold and the recently discovered tungsten
mineralisation and results will be applied to a future MRE upgrade expected in 2025.
Presented below are the initial priority areas for the upcoming drilling program within ML59/45 and ML59/208 (refer to
Figures 3 and 4)
•
The Princess deposit area between Western Queen South (WQS) and Western Queen Central (WQC) open
pit. This area has seen extensive historical small scale shaft mining, while only sparse exploration drilling
has occurred below the upper oxide-transitional zone (50-80m vertical depth).
•
Immediately below the WQS Resource, multiple high-grade lodes exist which are open at depth. Previous
exploration drilling at WQS returned high grade gold intercepts including:
o
o
o
•
4m @ 49.73 g/t Au from 134m (QND-38975-1)
5m @ 38.76 g/t Au from 193m (WQRC188)
17m @ 5.70 g/t Au from 221m (WQRC188)
o
5m @ 5.02g/t Au from 216m (WQDD013) – potential new parallel lode
o
6.4m @ 36.09 g/t Au from 305.7m (WQD-1072)
o
5m @ 22.00 g/t Au from 280m (WQRC150)
Beneath the WQC open pit and underground workings where multiple high-grade lodes exist which remain
open and untested at depth. Previous exploration drilling at WQC returned high-grade gold intercepts
including:
o
o
6m @ 34.24 g/t Au from 354m (WQRC007D)
11.8m @ 16.08 g/t Au from 340.4m (WQD-1089)
Rumble Resources Limited - ASX: RTR
Page | 5
•
Below the Duke Deposit, where mineralisation is open at depth. Previous exploration drilling at Duke returned
intercepts including:
o
8m @ 26.27 g/t Au from 14m (WQRC155)
o
6m @ 25.87 g/t Au from 48m (WQRC157)
o
6m @ 37.34 g/t Au from 50m (QNC-10310-1)
o
7m @ 60.60 g/t Au from 70m (WQJC-32)
•
Further north, over a 2km strike length between the Duke and Cranes deposits only limited RAB drilling with
an average end of hole depth of less than 20m and only three RC holes. There is a small gold in laterite and
oxide Inferred Resource of 3,314oz @ 1.39g/t Au (refer to Table 1 and Figure 4). The best intercepts at
Cranes have returned 14m @ 4.87 g/t Au and 11m @ 1.85 g/t Au from surface.
•
To the northeast of Cranes the position of the WQSZ has been recently reinterpreted using detailed airborne
magnetics flown by Rumble. This interpreted position remains untested by drilling.
Figure 4 - Western Queen Shear Zone Prospectivity over TMI Airborne Magnetics
Rumble Resources Limited - ASX: RTR
Page | 6
Western Queen Tungsten Discovery
During the Quarter, the Company announced a significant tungsten discovery at Western Queen with WQDD013
returning a spectacular intersection that included:
•
4.05m @ 4.58% WO3, 0.72 g/t Au from 174.85m, including
•
2.05m @ 8.71% WO3, 1.38 g/t Au from 176.85m, including
•
0.65m @ 18.35% WO3, 2.97 g/t Au from 176.85m.
The mineralisation contains large aggregates of scheelite grains (up to 5mm) occurring parallel to the main foliation
trend. The mineralisation is essentially multiple scheelite-pyroxene (tremolite)+/-magnetite+/-gold exoskarn zones
associated with the Western Queen orogenic Shear Zone (which hosts the gold mineralisation) within dominant
Archaean mafic amphibolite lithologies. The skarn development is thought to have been a later stage to the main gold
event at Western Queen.
Figure 5 – WQDD013 (0.65m @ 18.35 WO3) scheelite intersection under UV light
All previous drill holes completed by Rumble as part of the 2021 Western Queen gold resource drilling have
subsequently been analysed for tungsten (W) by pXRF. Review of the pXRF analytical data has shown some 87 RC
and DD drill holes completed by Rumble have reported >500ppm W.
Note: Analytical results from pXRF analysers are indicative and may not reflect the true tungsten (W) grade.
Contouring of the pXRF tungsten drill hole results (refer to Figure 6) has highlighted:
•
very strong tungsten continuity over 2km (>100ppm W contour) with the same strike direction and orientation
as the Western Queen Shear Zone which hosts the Western Queen gold deposits; and
•
the tenor of tungsten increases significantly with some 900m of strike >1,000ppm W between the Western
Queen Central and Western Queen South open pits.
The Company confirmed the tungsten discovery with assay intersections from pulp samples of an initial seven holes.
These seven holes were selected based on appropriate spatial coverage across the aforementioned 900m zone of
high tenor >1,000ppm W from pXRF and having at least one sample in the hole greater than 5,000ppm W in the pXRF
database.
Significant intersections from the pulp samples include 12m @ 0.56% WO3, 0.46g/t Au from 69m, with the higher
grade section of 2m @ 2.48% WO3 and 0.12g/t Au from 70m in WQRC032, 12m @ 0.34% WO3 and 3.22g/t Au from
202m, with a higher grade section of 7m @ 0.49% WO3 and 4.71g/t Au from 206m in WQRC178, 9m @ 0.22% WO3
plus 0.35g/t Au from 76m with a higher grade section of 2m @ 0.75% WO3 and 0.48g/t Au from 81m in WQRC178
and 5m @ 0.31% WO3, 0.31g/t Au from 220m in WQRC176 (refer to Figure 6).
Comparing the significant tungsten intersections returned to date at Western Queen with worldwide tungsten resources
for both operating mines and development projects which average between 0.20%-0.30% WO3 (refer to Figure 7)
suggests that Western Queen may contain a significant tungsten resource that is spatially related to the defined highgrade gold mineralisation.
Rumble Resources Limited - ASX: RTR
Page | 7
Figure 6 - Western Queen Project – Plan highlighting contoured maximum pXRF W in drill holes and
location and intercepts of significant W intersections from pulp samples and WQDD013.
The Company has retained the comprehensive pulp library of previous gold only assaying completed for the 2021 gold
resource. In addition, Rumble has access to the historic core library of diamond holes drilled at Western Queen by
previous operators. Assaying both the pulp library and historic core for tungsten would likely constitute the bulk of data
needed to classify a tungsten resource with only minimal direct drilling costs required.
Figure 7 - Size and grade comparison of worldwide tungsten resources for operating mines (green)
and resource development projects (blue).
Source: Group 6 Metals Noosa Presentation 17 July 2024
Rumble Resources Limited - ASX: RTR
Page | 8
About Tungsten⃰
Tungsten is classified as “critical raw material” and is subject to high supply risk and high economic importance. The
supply of tungsten (currently 78,000t annually) is highly dependent on China (produces 81% of the worlds tungsten).
Forecast annual demand growth for tungsten averages 3.5%pa compound however, some recent projections have a
more robust forecast of up to 8%pa compound.
Tungsten supply from China is forecast to decline due to diminishing reserves and grades making sources outside of
China significantly more valuable. Uses for tungsten include:
• Nano Tungsten Oxide for battery cathode and anode (Li-ion) manufacturing;
• Niobium Tungsten Oxide in batteries to reduce charge time and increase power density;
• Tungsten Hexafluoride gas to optimise all semiconductor production;
• Tungsten wire to essential replace diamond wire for photovoltaic cell silica wafer production;
• Tungsten Oxide coating to enhance hydrogen fuel cell durability;
•
•
Use in thermonuclear energy – excellent heat conductivity and very high melting temperature (includes both
100% tungsten (100-200 tonnes per reactor) and high tungsten steel surrounding the reactors); and
Military applications.
⃰ Sources: Study on the review of the list of critical raw materials, European Commission 2023 Merchant Research and Consulting:
2024 World Market Review and Forecast to 2033.
In Australia, tungsten is currently being produced on a small scale from the Dolphin mine on King Island (in Bass Strait)
by Group 6 Minerals. The Dolphin mine has produced tungsten from scheelite intermittently since 1917 and is
considered Australia’s largest and highest-grade deposit with a current resource of 9.6Mt @ 0.9% WO3. Other
resources in Australia include Mt Carbine (producer, EQ Resources, Queensland) which has intermittently produced
tungsten (wolframite) since the 1890s and currently has a resource of 28.7Mt @ 0.3% WO3.
Western Queen Project Next Steps
Gold
•
The Company is prioritising the planned 20,000m drill program at Western Queen which is scheduled to
commence in November. This program will include up to 15,000m RC and 5,000m diamond core drilling and
will test the multiple high-grade targets interpreted within the highlighted 2.7km zone that host the reported
mineral resources.
•
The program is expected to form the basis for a MRE upgrade in 2025.
•
Discussions are well advanced with a potential mine development partner.
Tungsten
•
The Company has submitted 1,150 pulps with anomalous pXRF tungsten from the previous Rumble gold
resource drilling programs. Results are expected during the December 2024 Quarter.
•
Previous diamond core completed both by the Company and previous operators will be re-sampled and
assayed for tungsten in the coming months.
•
The upcoming Western Queen drill program will target both gold and tungsten mineralisation and will provide
a proportion of the spatial data coverage required for tungsten to be included on future MRE updates.
Rumble Resources Limited - ASX: RTR
Page | 9
1.2 Earaheedy Zn-Pb-Ag Project, Wiluna, Western Australia
Chinook metallurgical test work - E69/3787 (100% RTR) and E69/3464 (75% RTR/ 25% ZNC)
Metallurgical test work on mineralised samples from the Chinook Deposit at the Earaheedy Project continued during
the September Quarter. The material was obtained from a drilling program that included 10 diamond holes from the
Chinook Deposit (see Figure 8), which provided 2,300kg of representative metallurgical core sample.
The Chinook metallurgical test work program includes:
• pilot beneficiation trials that will assess the potential to upgrade the significant volumes of lower grade Zn-Pb
mineralisation highlighted within the pit constrained MRE;
• early comminution test work; and
• further detailed mineralogy and flotation optimisation testing, for future planned scoping level studies.
The Chinook metallurgical program required some additional flowsheet optimisation studies and is now nearing
completion, with the program’s report due to be finalised in November and the results reported during the December
Quarter.
Figure 8 – Chinook - Metallurgical diamond drill hole Locations
Next Steps
•
Metallurgical studies
o
•
Completion of the current test work program on the Chinook material and release of the findings from
the studies.
Internal Scoping Study
o
Once the metallurgical test work program is completed work will commence on an internal scoping study,
which will consider possible future development scenarios/options.
Rumble Resources Limited - ASX: RTR
Page | 10
1.3
Other Gold, Base Metal & Lithium Projects, Western Australia
Wardawarra – Li-Cs-Ta, Ni-Cu-Co, Au Project, Mt Magnet, Western Australian
During the Quarter, the Company reviewed and interrogated the pXRF data for the 1,267 soil samples taken north of
the Western Queen Mine across the Wardawarra Greenstone Belt. In total, 699 samples were submitted for laboratory
analysis primarily to better understand the gold fertility, however the assay suite selected will also assist in
understanding the broad Lithium-Caesium-Tantalum (LCT) fertility at Wardawarra. The Company is anticipating assays
will be received early in the December Quarter and plans to undertake a field reconnaissance program of any gold and
LCT anomalies.
About Wardawarra Lithium-Caesium-Tantalum Project
Recent exploration has confirmed a significantly large and highly fractionated lithium-caesium-tantalum (LCT) fertile
system exists at Wardawarra, which warrants an expanded exploration program. The initial exploration program will
include detailed geological mapping and surface geochemical sampling of the Western Pegmatite Zone, including the
Lithium Creek Prospect and over the Eastern Pegmatite Swarm, including the Dunn’s Prospect.
Rumble Resources Limited - ASX: RTR
Page | 11
Figure 9 – Wardawarra Project LCT focused exploration overview
At the Western Pegmatite Zone exploration has highlighted a prospective 6km long trend (see Figure 9) containing
multiple, large pegmatites along the granite-ultramafic contact. Pegmatites trend towards the northwest and are greater
than 15m thick in outcrop with surface exposures of several hundreds of metres across strike, suggesting that the
pegmatites may have substantial true thicknesses. Multiple pegmatites appear to have undergone significant zonation
fractionation and many have fractionated quartz cores. Rock chip sampling has returned high-grade assays of up to
3.62% Li2O and 433ppm Ta2O5.
At the Eastern Pegmatite Swarm and Dunn’s Prospect exploration (see Figure 9) has confirmed that a 12km long
swarm of pegmatite dykes are lithium-cesium-tantalum (LCT) fertile with a 3km zone of high fertility (ie. K/Rb ratios
less than 20). Dunns Prospect is located in the southern portion of the zone of highest fertility. Rock chip sampling at
Dunns has returned high-grade assays including 4.95% Li2O, 4.91% Li2O, 4.84% Li2O and 4.72% Li2O.
Additionally, the Fence Prospect and the LCT fertile pegmatite field was previously held by Pancontinental Mining
Limited, who in 1983 ranked it in their top 5 lithium–tantalum prospects with a portfolio of projects that included
Pilgangoora, Wodgina, Tabba Tabba and Yinnetharra. Historic shallow alluvial mining has occurred for
tantalite/columbite, with lithium potential untested by drilling.
Rumble Resources Limited - ASX: RTR
Page | 12
Fraser Range Gold Project, Fraser Range, Western Australia
A field reconnaissance and soil sampling program was undertaken on the 100% Thunderbolt Project tenements during
the Quarter. In total, 82 soil samples were collected which have since been submitted for assay determination by
ultrafine fraction analysis. The results are expected in the December Quarter and will provide key understanding of the
gold fertility along major structures and the amenability for low-cost ultrafine soils sampling programs in the future.
Munarra Gully Gold-Copper-Silver Project, Western Australia
An extensive review of the Munarra Gully Project including all previous exploration and a comprehensive interpretation
of the geochemical datasets was undertaken during the Quarter. The Company has defined multiple new drill targets
at Munarra Gully and plans to submit a heritage survey request in the December Quarter.
Braeside Base Metal Project, East Pilbara, Western Australia
An extensive review of the Braeside Project including all previous exploration activities was completed during the
Quarter. As a result of this review, a rationalisation and reduction of the land holding was undertaken at Braeside,
resulting in the retention of the key prospects areas and/or priority targets that warrant further exploration.
Warroo Uranium and Base Metal Project, East Pilbara, Western Australia
During the Quarter, the Company completed an extensive review of the Warroo Project including all previous
exploration. As a result of this review, a rationalisation and reduction of the tenure holding at Warroo was undertaken,
resulting in the retention of the key prospects areas and/or priority targets that warrant future exploration.
2. CORPORATE
2.1 Strategic Investor-Capital Rasing
On the 27 September 2024 the Company announced it had entered into a Subscription Agreement with Bain Resource
Holdings Ltd (BRH), an associated company of the large Indian contractor, BGR Mining & Infra Limited (BGR). Under
the terms of the Subscription Agreement BRH subscribed for 25 million shares in Rumble at 4 cents per share for a
total investment of $1 million.
Cash and Investments
As at 30 September 2024, Rumble held $1.6 million in cash.
2.2 Appendix 5B – Quarterly Cashflow
The Appendix 5B – Statement of Consolidated Cash Flows is provided in a separate report. Information as disclosed
in the Cash Flow Report, with Exploration and Evaluation during the quarter totalling $1.055 million.
Cash outflows for the September 2024 Quarter totalled $1.9 million across exploration activity (57%), staff costs (25%),
administration and corporate costs (18%).
Cash inflows for the September 2024 Quarter totalled $1.3 million consisting of proceeds from capital raising (78%),
interest received and other (22%).
2.3 Appendix 5B – Payments to related parties and their associates
Payments to related parties and their associates totalled $124k for the Quarter, consisting of Technical Management,
Executive and Non-Executive Director fees and salaries, geological consulting, and superannuation payments.
Rumble Resources Limited - ASX: RTR
Page | 13
2.4 Tenement Holdings
In accordance with ASX Listing Rule 5.3.3, please refer to Appendix 1 for a listing of all tenement holdings.
Authorised for release on behalf of the Company by Peter Harold, Managing Director and CEO of the Company.
For further information, please visit www.rumbleresources.com.au to view our latest corporate presentation.
Follow our communications:
Linkedin: https://www.linkedin.com/company/rumble-resources-ltd
Twitter: https://twitter.com/RumbleResources
About Rumble Resources Ltd
Rumble Resources Limited is an Australian based ASX Listed exploration company that is firmly focussed on rapidly advancing the major
Zn-Pb-Ag discovery at the Earaheedy Project in Western Australia. Since its discovery in April 2021 broad spaced drilling has rapidly
uncovered an emerging world class scale base metal system, with interpretative geology and drilling continuing to make new discoveries
and highlight multiple large-scale deposit targets.
The Company also has a significant pipeline of advanced exploration base metal, lithium and gold projects located in Tier 1 regions of
Western Australia. While the Company is undertaking metallurgical studies and internal scoping studies on Earaheedy exploration
activities have been focused on Western Queen where an opportunity exists to grow the gold resources and potentially fast track the
project into production.
Rumble’s board and management team has a successful track record in making discoveries and project development
Competent Persons Statement
The information in this report that relates to Exploration Results at the Earaheedy, and other Rumble Projects is based on and fairly
represents information compiled by Mr Luke Timmermans, who is a Member of the Australian Institute of Geoscientists. Mr Timmermans
is a full-time employee of Rumble Resources Limited, Mr Timmermans has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Timmermans
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this release that relates to Mineral Resources at Western Queen is based on information compiled by Mr Shaun Searle
who is a Member of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and independent
consultant to Rumble Resources Limited. Mr Searle has sufficient experience, which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Searle consent